11 resultados para stored procedure
em Doria (National Library of Finland DSpace Services) - National Library of Finland, Finland
Resumo:
Lihasikojen E-vitamiinin tarve ruokittaessa vastapuidulla ohralla ja rehuun lisätyn E-vitamiinin vaikutus lihan pakastussäilyvyyteen ja syöntilaatuun
Resumo:
Selostus: Tasoskannerin ja digitaalisen kuva-analyysimenetelmän kalibrointi juurten morfologian kvantifioimiseksi
Resumo:
Abstract
Resumo:
In this thesis, cleaning of ceramic filter media was studied. Mechanisms of fouling and dissolution of iron compounds, as well as methods for cleaning ceramic membranes fouled by iron deposits were studied in the literature part. Cleaning agents and different methods were closer examined in the experimental part of the thesis. Pyrite is found in the geologic strata. It is oxidized to form ferrous ions Fe(II) and ferric ions Fe(III). Fe(III) is further oxidized in the hydrolysis to form ferric hydroxide. Hematite and goethite, for instance, are naturally occurring iron oxidesand hydroxides. In contact with filter media, they can cause severe fouling, which common cleaning techniques competent enough to remove. Mechanisms for the dissolution of iron oxides include the ligand-promoted pathway and the proton-promoted pathway. The dissolution can also be reductive or non-reductive. The most efficient mechanism is the ligand-promoted reductive mechanism that comprises two stages: the induction period and the autocatalytic dissolution.Reducing agents(such as hydroquinone and hydroxylamine hydrochloride), chelating agents (such as EDTA) and organic acids are used for the removal of iron compounds. Oxalic acid is the most effective known cleaning agent for iron deposits. Since formulations are often more effective than organic acids, reducing agents or chelating agents alone, the citrate¿bicarbonate¿dithionite system among others is well studied in the literature. The cleaning is also enhanced with ultrasound and backpulsing.In the experimental part, oxalic acid and nitric acid were studied alone andin combinations. Also citric acid and ascorbic acid among other chemicals were tested. Soaking experiments, experiments with ultrasound and experiments for alternative methods to apply the cleaning solution on the filter samples were carried out. Permeability and ISO Brightness measurements were performed to examine the influence of the cleaning methods on the samples. Inductively coupled plasma optical emission spectroscopy (ICP-OES) analysis of the solutions was carried out to determine the dissolved metals.
Resumo:
The building industry has a particular interest in using clinching as a joining method for frame constructions of light-frame housing. Normally many clinch joints are required in joining of frames.In order to maximise the strength of the complete assembly, each clinch joint must be as sound as possible. Experimental testing is the main means of optimising a particular clinch joint. This includes shear strength testing and visual observation of joint cross-sections. The manufacturers of clinching equipment normally perform such experimental trials. Finite element analysis can also be used to optimise the tool geometry and the process parameter, X, which represents the thickness of the base of the joint. However, such procedures require dedicated software, a skilled operator, and test specimens in order to verify the finite element model. In addition, when using current technology several hours' computing time may be necessary. The objective of the study was to develop a simple calculation procedure for rapidly establishing an optimum value for the parameter X for a given tool combination. It should be possible to use the procedure on a daily basis, without stringent demands on the skill of the operator or the equipment. It is also desirable that the procedure would significantly decrease thenumber of shear strength tests required for verification. The experimental workinvolved tests in order to obtain an understanding of the behaviour of the sheets during clinching. The most notable observation concerned the stage of the process in which the upper sheet was initially bent, after which the deformation mechanism changed to shearing and elongation. The amount of deformation was measured relative to the original location of the upper sheet, and characterised as the C-measure. By understanding in detail the behaviour of the upper sheet, it waspossible to estimate a bending line function for the surface of the upper sheet. A procedure was developed, which makes it possible to estimate the process parameter X for each tool combination with a fixed die. The procedure is based on equating the volume of material on the punch side with the volume of the die. Detailed information concerning the behaviour of material on the punch side is required, assuming that the volume of die does not change during the process. The procedure was applied to shear strength testing of a sample material. The sample material was continuously hot-dip zinc-coated high-strength constructional steel,with a nominal thickness of 1.0 mm. The minimum Rp0.2 proof stress was 637 N/mm2. Such material has not yet been used extensively in light-frame housing, and little has been published on clinching of the material. The performance of the material is therefore of particular interest. Companies that use clinching on a daily basis stand to gain the greatest benefit from the procedure. By understanding the behaviour of sheets in different cases, it is possible to use data at an early stage for adjusting and optimising the process. In particular, the functionality of common tools can be increased since it is possible to characterise the complete range of existing tools. The study increases and broadens the amount ofbasic information concerning the clinching process. New approaches and points of view are presented and used for generating new knowledge.
Resumo:
Yrityksen organisaatiomallin pitää palvella tehokasta toimintaa. Tällä hetkellä tässä yrityksessä resurssipooleihin perustuva organisaatio on katsottu sopivaksi. Sen toivotaan mahdollistavan henkilöstöresurssien tehokas hyödyntäminen. Organisaation muutos vaatii myös toimintatapojen ja joissain tapauksissa tietojärjestelmien muutosta. Tässä tapauksessa siirtyminen uudenlaiseen organisaatioon loi tarpeen uudelle resurssien varaus- ja etsintätoiminnolle ja sitä tukeville tietovarastoille. Vaatimusmäärityksen tuloksena voidaan todeta, että nykyinen ERP-ohjelmisto ei ole paras mahdollinen yrityksen käyttöön, vaikka senkin kanssa yritys kyllä tulee toimeen. Tärkeimpinä vaatimuksina hyvälle hallintasovellukselle voidaan pitää mahdollisuutta seurata työntekijöiden osaamisen ja tietämyksen kehitystä sekä arvioida niiden tasoa, mahdollisuutta varata niin henkilöitä kuin osaamisia ja tehokasta ja muunneltavaa mekanismia henkilöiden valintaan projekteihin. Nykyisessä toteutuksessa henkilöstön osaamisten käsittely on hiukan rajoittunutta eikä mitään historiatietoja tallenneta tai käytetä hyödyksi missään vaiheessa. Myös resurssien haku projekteihin olisi mahdollista toteuttaa paremmin. Hakuihin pitäisi saada lisää hakuehtoja ja mahdollistaa yleisluontoisemmat ehdot yksityiskohtien sijaan, vaikka tiedot olisivatkin tarkemmalla tasolla. Näistä syistä uuden työkalun rakentamista henkilöstöresurssien paremman hyödyntämisen takaamiseksi voidaan pitää perusteltuna.
Resumo:
The aim of this study is to develop a suitable project control procedure for a target company that can be used in engineering, procurement, and construction or con-struction management contracts. This procedure contains suitable project control software and a model for the use of the software in practice. This study is divided into two main sections. Theoretical part deals with project management, focusing on cost and time dimensions in projects. Empirical part deals with the development of the project control procedure for the target compa-ny. This development takes place in two parts. In the first part, semi-structured interviews are used to find out the company’s employees’ demands and desires for the project control software which will then be used in the developed procedure. These demands and desires are compared to available software in the market and the most suitable one will be chosen. Interview results show that important factors are cost tracking, integration with other software, English language availability, references, helpdesk, and no need for regular updates. The most suitable one is CMPro5 cost control software. The chosen software is used in a pilot project, where its functions and use are analyzed. Project control procedure which will be used in the future is developed based on these procedures. The five steps in developed procedure include employment of a cost engineer, whose task is to maintain the procedure in the target company.