109 resultados para Time Based Management (TBM)
Resumo:
In this work, image based estimation methods, also known as direct methods, are studied which avoid feature extraction and matching completely. Cost functions use raw pixels as measurements and the goal is to produce precise 3D pose and structure estimates. The cost functions presented minimize the sensor error, because measurements are not transformed or modified. In photometric camera pose estimation, 3D rotation and translation parameters are estimated by minimizing a sequence of image based cost functions, which are non-linear due to perspective projection and lens distortion. In image based structure refinement, on the other hand, 3D structure is refined using a number of additional views and an image based cost metric. Image based estimation methods are particularly useful in conditions where the Lambertian assumption holds, and the 3D points have constant color despite viewing angle. The goal is to improve image based estimation methods, and to produce computationally efficient methods which can be accomodated into real-time applications. The developed image-based 3D pose and structure estimation methods are finally demonstrated in practise in indoor 3D reconstruction use, and in a live augmented reality application.
Resumo:
Eutrophication caused by anthropogenic nutrient pollution has become one of the most severe threats to water bodies. Nutrients enter water bodies from atmospheric precipitation, industrial and domestic wastewaters and surface runoff from agricultural and forest areas. As point pollution has been significantly reduced in developed countries in recent decades, agricultural non-point sources have been increasingly identified as the largest source of nutrient loading in water bodies. In this study, Lake Säkylän Pyhäjärvi and its catchment are studied as an example of a long-term, voluntary-based, co-operative model of lake and catchment management. Lake Pyhäjärvi is located in the centre of an intensive agricultural area in southwestern Finland. More than 20 professional fishermen operate in the lake area, and the lake is used as a drinking water source and for various recreational activities. Lake Pyhäjärvi is a good example of a large and shallow lake that suffers from eutrophication and is subject to measures to improve this undesired state under changing conditions. Climate change is one of the most important challenges faced by Lake Pyhäjärvi and other water bodies. The results show that climatic variation affects the amounts of runoff and nutrient loading and their timing during the year. The findings from the study area concerning warm winters and their influences on nutrient loading are in accordance with the IPCC scenarios of future climate change. In addition to nutrient reduction measures, the restoration of food chains (biomanipulation) is a key method in water quality management. The food-web structure in Lake Pyhäjärvi has, however, become disturbed due to mild winters, short ice cover and low fish catch. Ice cover that enables winter seining is extremely important to the water quality and ecosystem of Lake Pyhäjärvi, as the vendace stock is one of the key factors affecting the food web and the state of the lake. New methods for the reduction of nutrient loading and the treatment of runoff waters from agriculture, such as sand filters, were tested in field conditions. The results confirm that the filter technique is an applicable method for nutrient reduction, but further development is needed. The ability of sand filters to absorb nutrients can be improved with nutrient binding compounds, such as lime. Long-term hydrological, chemical and biological research and monitoring data on Lake Pyhäjärvi and its catchment provide a basis for water protection measures and improve our understanding of the complicated physical, chemical and biological interactions between the terrestrial and aquatic realms. In addition to measurements carried out in field conditions, Lake Pyhäjärvi and its catchment were studied using various modelling methods. In the calibration and validation of models, long-term and wide-ranging time series data proved to be valuable. Collaboration between researchers, modellers and local water managers further improves the reliability and usefulness of models. Lake Pyhäjärvi and its catchment can also be regarded as a good research laboratory from the point of view of the Baltic Sea. The main problem in both of them is eutrophication caused by excess nutrients, and nutrient loading has to be reduced – especially from agriculture. Mitigation measures are also similar in both cases.
Resumo:
The Laboratory of Intelligent Machine researches and develops energy-efficient power transmissions and automation for mobile construction machines and industrial processes. The laboratory's particular areas of expertise include mechatronic machine design using virtual technologies and simulators and demanding industrial robotics. The laboratory has collaborated extensively with industrial actors and it has participated in significant international research projects, particularly in the field of robotics. For years, dSPACE tools were the lonely hardware which was used in the lab to develop different control algorithms in real-time. dSPACE's hardware systems are in widespread use in the automotive industry and are also employed in drives, aerospace, and industrial automation. But new competitors are developing new sophisticated systems and their features convinced the laboratory to test new products. One of these competitors is National Instrument (NI). In order to get to know the specifications and capabilities of NI tools, an agreement was made to test a NI evolutionary system. This system is used to control a 1-D hydraulic slider. The objective of this research project is to develop a control scheme for the teleoperation of a hydraulically driven manipulator, and to implement a control algorithm between human and machine interaction, and machine and task environment interaction both on NI and dSPACE systems simultaneously and to compare the results.
Resumo:
In R&D organizations multiple projects are executed concurrently. Problems arises in managing shared resources since they are needed by multiple projects simultaneously. The objective of this thesis was to study how the project and resource management could be developed in a public sector R&D organization. The qualitative research was carried out in the Magnetic Measurements section at CERN where the section measures magnets for particle accelerators and builds state of the art measurement devices for various needs. Hence, the R&D and measurement projects are very time consuming and very complex. Based on the previous research and the requirements from the organization the best alter- native for resource management was to build a project management information system. A centralized database was constructed and on top of it was built an application for interacting and visualizing the project data. The application allows handling project data, which works as a basis for resource planning before and during the projects are executed. It is one way to standardize the work-flow of projects, which strengthens the project process. Additionally, it was noted that the inner customer’s database, the measurement system and the new application needed to be integrated. Further integration ensures that the project data is received efficiently from customers and available not only within the application but also during the concrete work. The research results introduced a new integrated application, which centralizes the project information flow with better visibility.
Resumo:
Data management consists of collecting, storing, and processing the data into the format which provides value-adding information for decision-making process. The development of data management has enabled of designing increasingly effective database management systems to support business needs. Therefore as well as advanced systems are designed for reporting purposes, also operational systems allow reporting and data analyzing. The used research method in the theory part is qualitative research and the research type in the empirical part is case study. Objective of this paper is to examine database management system requirements from reporting managements and data managements perspectives. In the theory part these requirements are identified and the appropriateness of the relational data model is evaluated. In addition key performance indicators applied to the operational monitoring of production are studied. The study has revealed that the appropriate operational key performance indicators of production takes into account time, quality, flexibility and cost aspects. Especially manufacturing efficiency has been highlighted. In this paper, reporting management is defined as a continuous monitoring of given performance measures. According to the literature review, the data management tool should cover performance, usability, reliability, scalability, and data privacy aspects in order to fulfill reporting managements demands. A framework is created for the system development phase based on requirements, and is used in the empirical part of the thesis where such a system is designed and created for reporting management purposes for a company which operates in the manufacturing industry. Relational data modeling and database architectures are utilized when the system is built for relational database platform.
Resumo:
Virtual environments and real-time simulators (VERS) are becoming more and more important tools in research and development (R&D) process of non-road mobile machinery (NRMM). The virtual prototyping techniques enable faster and more cost-efficient development of machines compared to use of real life prototypes. High energy efficiency has become an important topic in the world of NRMM because of environmental and economic demands. The objective of this thesis is to develop VERS based methods for research and development of NRMM. A process using VERS for assessing effects of human operators on the life-cycle efficiency of NRMM was developed. Human in the loop simulations are ran using an underground mining loader to study the developed process. The simulations were ran in the virtual environment of the Laboratory of Intelligent Machines of Lappeenranta University of Technology. A physically adequate real-time simulation model of NRMM was shown to be reliable and cost effective in testing of hardware components by the means of hardware-in-the-loop (HIL) simulations. A control interface connecting integrated electro-hydraulic energy converter (IEHEC) with virtual simulation model of log crane was developed. IEHEC consists of a hydraulic pump-motor and an integrated electrical permanent magnet synchronous motorgenerator. The results show that state of the art real-time NRMM simulators are capable to solve factors related to energy consumption and productivity of the NRMM. A significant variation between the test drivers is found. The results show that VERS can be used for assessing human effects on the life-cycle efficiency of NRMM. HIL simulation responses compared to that achieved with conventional simulation method demonstrate the advances and drawbacks of various possible interfaces between the simulator and hardware part of the system under study. Novel ideas for arranging the interface are successfully tested and compared with the more traditional one. The proposed process for assessing the effects of operators on the life-cycle efficiency will be applied for wider group of operators in the future. Driving styles of the operators can be analysed statistically from sufficient large result data. The statistical analysis can find the most life-cycle efficient driving style for the specific environment and machinery. The proposed control interface for HIL simulation need to be further studied. The robustness and the adaptation of the interface in different situations must be verified. The future work will also include studying the suitability of the IEHEC for different working machines using the proposed HIL simulation method.
Resumo:
Today’s healthcare organizations are under constant pressure for change, as hospitals should be able to offer their patients the best possible medical care with limited resources and, at the same time, to retain steady efficiency level in their operation. This is challenging, especially in trauma hospitals, in which the variation in the patient cases and volumes is relatively high. Furthermore, the trauma patient's care requires plenty of resources as most the patients have to be treated as single cases. Occasionally, the sudden increases in demand causes congestion in the operations of the hospital, which in Töölö hospital appears as an increase in the surgery waiting times within the yellow urgency class patients. An increase in the surgery waiting times may cause the diminution of the patient's condition, which also raises the surgery risks. The congestion itself causes overloading of the hospital capacity and staff. The aim of this master’s thesis is to introduce the factors contributing to the trauma process, and to examine the correlation between the different variables and the lengthened surgery waiting times. The results of this study are based on a three-year patient data and different quantitative analysis. Based on the analysis, a daily usable indicator was created in order to support the decision making in the operations management. By using the selected indicator, the effects of congestion can be acknowledged and the corrective action can also be taken more proactively.
Resumo:
Sales and operations research publications have increased significantly in the last decades. The concept of sales and operations planning (S&OP) has gained increased recognition and has been put forward as the area within Supply Chain Management (SCM). Development of S&OP is based on the need for determining future actions, both for sales and operations, since off-shoring, outsourcing, complex supply chains and extended lead times make challenges for responding to changes in the marketplace when they occur. Order intake of the case company has grown rapidly during the last years. Along with the growth, new challenges considering data management and information flow have arisen due to increasing customer orders. To manage these challenges, case company has implemented S&OP process, though initial process is in early stage and due to this, the process is not managing the increased customer orders adequately. Thesis objective is to explore extensively the S&OP process content of the case company and give further recommendations. Objectives are categorized into six different groups, to clarify the purpose of this thesis. Qualitative research methods used are active participant observation, qualitative interviews, enquiry, education, and a workshop. It is notable that demand planning was felt as cumbersome, so it is typically the biggest challenge in S&OP process. More proactive the sales forecasting can be, more expanded the time horizon of operational planning will turn out. S&OP process is 60 percent change management, 30 percent process development and 10 percent technology. The change management and continuous improvement can sometimes be arduous and set as secondary. It is important that different people are required to improve the process and the process is constantly evaluated. As well as, process governance is substantially in a central role and it has to be managed consciously. Generally, S&OP process was seen important and all the stakeholders were committed to the process. Particular sections were experienced more important than others, depending on the stakeholders’ point of views. Recommendations to objective groups are evaluated by the achievable benefit and resource requirement. The urgent and easily implemented improvement recommendations should be executed firstly. Next steps are to develop more coherent process structure and refine cost awareness. Afterwards demand planning, supply planning, and reporting should be developed more profoundly. For last, information technology system should be implemented to support the process phases.
Resumo:
With small and medium sized-enterprises (SMEs) taking up the majority of the global businesses, it is important they act in an environmentally responsible manner. Environmental management systems (EMS) help companies evaluate and improve their environmental impact but they often require human, financial, and temporary resources that not all SMEs can provide. This research encompasses interviews with representatives of two small enterprises in Germany to provide insights into their understanding, and knowledge of an EMS and how they perceive their responsibility towards the environment. Furthermore, it presents a toolkit created especially for small and medium-sized enterprises that serves as a simplified version of an EMS based on the ISO 14001 standard and is evaluated by the representatives of the SMEs. Some of the findings are: while being open to the idea of improving their environmental impact, SMEs do not always feel it is their responsibility to do so; they seem to lack the means to fully implement an EMS. The developed toolkit is considered useful and usable and recommendations are drawn for its future enhancement.
Resumo:
This thesis explores how the project charter development, project scope management, and project time management are executed in a Finnish movie production. The deviations and analogies between a case movie production and best practices suggested in PMBOK are presented. Empirical material from the case is gathered with two semi-structured interviews with a producer and a line producer. The interview data is categorized according to PMBOK knowledge areas. The analysis is complemented with movie industry specific norms found in popular movie production guides. The described and observed methods are linked together and the relationship between them is discussed. The project charter development, which is referred as a green light process in the movie industry, is mostly analogous between all areas. The deviations are in the level of formality. The green lighting in the case movie was accomplished without bureaucratic reports described in movie production guides. The empirical material shows that project management conventions and movie industry employ similar methods especially in scope management. Project management practices introduce a work breakdown structure (WBS) method, and movie production accomplishes the same task by developing a shooting script. Time management of the case movie deviates on most parts from the methods suggested in PMBOK. The major deviation is resource management. PMBOK suggests creating a resource breakdown structure. The case movie production accomplished this through budgeting process. Furthermore the popular movie production guides also disregard resource management as sovereign process. However the activity listing is quite analogous between the case movie and PMBOK. The final key observation is that although there is a broad set of effective and detailed movie industry specific methods, a comprehensive methodology that would cover the whole production process, such as Prince2 or Scrum, seems to be missing from the movie industry.
Resumo:
This thesis explores how the project charter development, project scope management, and project time management are executed in a Finnish movie production. The deviations and analogies between a case movie production and best practices suggested in PMBOK are presented. Empirical material from the case is gathered with two semi-structured interviews with a producer and a line producer. The interview data is categorized according to PMBOK knowledge areas. The analysis is complemented with movie industry specific norms found in popular movie production guides. The described and observed methods are linked together and the relationship between them is discussed. The project charter development, which is referred as a green light process in the movie industry, is mostly analogous between all areas. The deviations are in the level of formality. The green lighting in the case movie was accomplished without bureaucratic reports described in movie production guides. The empirical material shows that project management conventions and movie industry employ similar methods especially in scope management. Project management practices introduce a work breakdown structure (WBS) method, and movie production accomplishes the same task by developing a shooting script. Time management of the case movie deviates on most parts from the methods suggested in PMBOK. The major deviation is resource management. PMBOK suggests creating a resource breakdown structure. The case movie production accomplished this through budgeting process. Furthermore the popular movie production guides also disregard resource management as sovereign process. However the activity listing is quite analogous between the case movie and PMBOK. The final key observation is that although there is a broad set of effective and detailed movie industry specific methods, a comprehensive methodology that would cover the whole production process, such as Prince2 or Scrum, seems to be missing from the movie industry.
Resumo:
The objective of the research was to identify knowledge conversion states in consultancy sales and delivery processes for the company’s one business unit, to know where to store certain types of information and knowledge, and to create best practices for the company’s knowledge management activities in the selected business processes. The used research methodology was action research. The current business processes were analyzed by interviewing people involved in them. The results were documented and catego- rized, and based on them the target states of the processes were developed. Knowledge man- agement activities were integrated to the business processes. The main findings of the research were that roles and responsibilities in the processes were not clear to people, information systems did not fully support individuals and time was wasted searching for information and knowledge. There were also many variations of how the processes actually realized, which affected the overall quality of the process. The conclusions of the research were that knowledge management activities should be high- lighted in businesses where knowledge workers are the main assets of the company. Knowledge management practices can be supported by company culture, leadership and in- formation systems. However, one main factor is each individual’s willingness to share knowledge. By integrating knowledge management activities to business processes and hav- ing information systems supporting knowledge management, individual productivity can be improved.
Resumo:
The lack of research of private real estate is a well-known problem. Earlier studies have mostly concentrated on the USA or the UK. Therefore, this master thesis offers more information about the performance and risk associated with private real estate investments in Nordic countries, but especially in Finland. The structure of this master thesis is divided into two independent sections based on the research questions. In first section, database analysis is performed to assess risk-return ratio of direct real estate investment for Nordic countries. Risk-return ratios are also assessed for different property sectors and economic regions. Finally, review of diversification strategies based on property sectors and economic regions is performed. However, standard deviation itself is not usually sufficient method to evaluate riskiness of private real estate. There is demand for more explicit assessment of property risk. One solution is property risk scoring. In second section risk scorecard based tool is built to make different real estate comparable in terms of risk. In order to do this, nine real estate professionals were interviewed to enhance the structure of theory-based risk scorecard and to assess weights for different risk factors.