138 resultados para manufacturing plant


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this thesis is to research Manufacturing Planning and Control (MPC) system and Master Scheduling (MS) in a manufacturing firm. The study is conducted at Ensto Finland Corporation, which operates on a field of electrical systems and supplies. The paper consists of theoretical and empirical parts. The empirical part is based on weekly operating at Ensto and includes inter-firm material analysis, learning and meetings. Master Scheduling is an important module of an MPC system, since it is beneficial on transforming strategic production plans based on demand forecasting into operational schedules. Furthermore, capacity planning tools can remarkably contribute to production planning: by Rough-Cut Capacity Planning (RCCP) tool, a MS plan can be critically analyzed in terms of available key resources in real manufacturing environment. Currently, there are remarkable inefficiencies when it comes to Ensto’s practices: the system is not able to take into consideration seasonal demand and react on market changes on time; This can cause significant lost sales. However, these inefficiencies could be eliminated through the appropriate utilization of MS and RCCP tools. To utilize MS and RCCP tools in Ensto’s production environment, further testing in real production environment is required. Moreover, data accuracy, appropriate commitment to adapting and learning the new tools, and continuous developing of functions closely related to MS, such as sales forecasting, need to be ensured.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis studies the use of heuristic algorithms in a number of combinatorial problems that occur in various resource constrained environments. Such problems occur, for example, in manufacturing, where a restricted number of resources (tools, machines, feeder slots) are needed to perform some operations. Many of these problems turn out to be computationally intractable, and heuristic algorithms are used to provide efficient, yet sub-optimal solutions. The main goal of the present study is to build upon existing methods to create new heuristics that provide improved solutions for some of these problems. All of these problems occur in practice, and one of the motivations of our study was the request for improvements from industrial sources. We approach three different resource constrained problems. The first is the tool switching and loading problem, and occurs especially in the assembly of printed circuit boards. This problem has to be solved when an efficient, yet small primary storage is used to access resources (tools) from a less efficient (but unlimited) secondary storage area. We study various forms of the problem and provide improved heuristics for its solution. Second, the nozzle assignment problem is concerned with selecting a suitable set of vacuum nozzles for the arms of a robotic assembly machine. It turns out that this is a specialized formulation of the MINMAX resource allocation formulation of the apportionment problem and it can be solved efficiently and optimally. We construct an exact algorithm specialized for the nozzle selection and provide a proof of its optimality. Third, the problem of feeder assignment and component tape construction occurs when electronic components are inserted and certain component types cause tape movement delays that can significantly impact the efficiency of printed circuit board assembly. Here, careful selection of component slots in the feeder improves the tape movement speed. We provide a formal proof that this problem is of the same complexity as the turnpike problem (a well studied geometric optimization problem), and provide a heuristic algorithm for this problem.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Tämän diplomityön tarkoituksena oli tehdä sähkön ja lämmöntuotannon kannattavuustarkastelu erään esimerkkitehtaan näkökulmasta. Tarkoitus oli selvittää onko vaneritehtaalla edellytyksiä investoida sähköä ja lämpöä tuottavaan yhteistuotantolaitokseen, vai onko edullisempaa tuottaa itse ainoastaan valmistusprosessin kannalta välttämätön lämpöenergia ja ostaa tarvittava sähköenergia ulkoiselta toimijalta. Johdantona on tarkasteltu ensin vanerin valmistusprosessia ja prosessissa syntyviä sivutuotteita. Toisena osiona on pyritty hahmottamaan vanerinvalmistuksessa syntyvien sivutuotteiden määriä ja ominaisuuksia niiden polttoainekäyttöä silmällä pitäen. Lopuksi johdannossa on perehdytty mahdollisiin tekniikoihin, joilla sähkön ja lämmön yhteistuotanto vaneritehtaan yhteydessä olisi mahdollista. Johdannossa käsiteltävät asiat perustuvat teorialähteisiin. Aineisto ja menetelmät osiossa on tarkasteltu esimerkkitehdasta voimalaitoksen sijoituskohteena. Osiossa on perehdytty prosessin sivutuotteiden määrään ja energian kulutukseen. Näiden seikkojen perusteella on tehtaan yhteyteen mitoitettu sähköä ja lämpöä tuottavia yhteistuotantolaitosesimerkkejä. Lopuksi tuloksissa on tarkasteltu yhteistuotantolaitoksien kannattavuutta vaneritehtaan yhteydessä ja tutkittu kannattavuuteen vaikuttavia tekijöitä.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Kuumahiertoprosessi on erittäin energiaintensiivinen prosessi, jonka energianominaiskulutus (EOK) on yleisesti 2–3.5 MWh/bdt. Noin 93 % energiasta kuluu jauhatuksessa jakautuen niin, että kaksi kolmasosaa kuluu päälinjan ja yksi kolmasosa rejektijauhatuksessa. Siksi myös tämän työn tavoite asetettiin vähentämään energian kulutusta juuri pää- ja rejektijauhatuksessa. Päälinjan jauhatuksessa tutkimuskohteiksi valittiin terityksen, tehojaon ja tuotantotason vaikutus EOK:een. Rejektijauhatuksen tehostamiseen pyrittiin yrittämällä vähentää rejektivirtaamaa painelajittelun keinoin. Koska TMP3 laitoksen jauhatuskapasiteettia on nostettu 25 %, tavoite oli nostaa päälinjan lajittelun kapasiteettia saman verran. Toisena tavoitteena oli pienentää rejektisuhdetta pää- ja rejektilajittelussa ja siten vähentää energiankulutusta rejektijauhatuksessa. Näitä tavoitteita lähestyttiin vaihtamalla päälinjan lajittimiin TamScreen-roottorit ja rejektilajittimiin Metso ProFoil-roottorit ja optimoimalla kuitufraktiot sihtirumpu- ja prosessiparametrimuutoksin. Syöttävällä terätyypillä pystyttiin vähentämään EOK:ta 100 kWh/bdt, mutta korkeampi jauhatusintensiteetti johti myös alempiin lujuusominaisuuksiin, korkeampaan ilmanläpäisyyn ja korkeampaan opasiteettiin. Myös tehojaolla voitiin vaikuttaa EOK:een. Kun ensimmäisen vaiheen jauhinta kuormitettiin enemmän, saavutettiin korkeimmillaan 70 kWh/bdt EOK-vähennys. Tuotantotason mittaamisongelmat heikensivät tuotantotasokoeajojen tuloksia siinä määrin, että näiden tulosten perusteella ei voida päätellä, onko EOK tuotantotasoriippuvainen vai ei. Päälinjan lajittelun kapasiteettia pystyttiin nostamaan TS-roottorilla vain 18 % jääden hieman tavoitetasosta. Rejektilajittelussa pystyttiin vähentämään rejektimäärää huomattavasti Metso ProFoil-roottorilla sekä sihtirumpu- ja prosessiparametrimuutoksin. Lajittamokehityksellä saavutettu EOK-vähennys arvioitiin massarejektisuhteen pienentymisen ja rejektijauhatuksessa käytetyn EOK:n avulla olevan noin 130 kWh/bdt. Yhteenvetona voidaan todeta, että tavoite 300 kWh/bdt EOK-vähennyksestä voidaan saavuttaa työssä käytetyillä tavoilla, mikäli niiden täysi potentiaali hyödynnetään tuotannossa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this master’s thesis was to study ways to increase the operating cost-efficiency of the hydrogen production process by optimizing the process parameters while, at the same time, maintaining plant reliability and safety. The literature part reviewed other hydrogen production and purification processes as well as raw material alternatives for hydrogen production. The experimental part of the master’s thesis was conducted at Solvay Chemicals Finland Oy’s hydrogen plant in spring 2012. It was performed by changing the process parameters, first, one by one, aiming for a more efficient process with clean product gas and lower natural gas consumption. The values of the process parameters were tested based on the information from the literature, process simulation and experiences of previous similar processes. The studied parameters were reformer outlet temperature, shift converter inlet temperature and steam/carbon ratio. The results show that the optimal process conditions are a lower steam/carbon ratio and reformer outlet temperature than the current values of 3.0 and 798 °C. An increase/decrease in the shift conversion inlet temperature does not affect natural gas consumption, but it has an effect on minimizing the process steam overload.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The intellectual property (IP) environment in China is still very immature. There are several problems in legal, political, economic, social-cultural, competitive and labor environment which have hindered IP legal enforcement. Under such circumstances, IP misappropriation is a major concern especially for foreign small and medium-sized enterprises (SMEs) doing business in China. These circumstances require foreign companies, no matter whether they are multinational corporations (MNCs) or SMEs and have own manufacturing in China or not, to take strong IP actions. Therefore, the purpose of this study is to discuss how IP can be protected in China in the case of outsourcing and in the case of own manufacturing. The comparison will consider the process of outsourcing and own manufacturing consisting two stages: preparation stage and operation stage. In order to clarify the conceptual arguments, two illustrative case studies were studied. The case data bases on two semi-structured interviews of the managing directors, field notes and archival data. The findings propose that attention in IP protection should be given to following issues: integrating IP strategy into the company’s business strategy, protecting the most critical knowledge, regarding IP steps as a whole in the protection mechanism and making IP strategy as proactive as possible. The major difference between outsourcing and own manufacturing in IP protection is in the operation stage. Besides, the findings also provide managerial advice on IP protection, e.g. foreign managers should be prepared for IP risks in China, they should establish an own IP protection mechanism which matches the company’s situation and they should consider IP protection as an on-going process.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The transition of project based manufacturing business, even more into global networks, sets up challenges for companies to manage their business in this new operating environment. One way to tackle these challenges is the successful management of product information through an extended product’s lifecycle. Thus, one objective of this research is to find ways how product information management in global project based manufacturing can be improved. Another objective is to find a solution how the target company can improve its product information management in the offer-to-procurement business process. Due to the nature of the topic, the study follows constructive research methodology with qualitative methods. By combining literature related to this topic a framework is created to improve product information management in global project based manufacturing. The improvement process in this framework is based on a systematic approach from the current state towards target state. A general aim for improvements should be the integrated product and project lifecycle information management through Lean approach. This introduced framework is applied to the target company through two case projects. Data for building view of current state and analysis is collected mostly by theme interviews and also utilizing other material from the target company. Used tools help to analyzing was the BPMN and the Trace matrix for business chains. Results of the improvement process are collected in a solution proposal which contain the strategic target state as well as long and short term objectives. The strategic target state is defined as controlled customization. Also during the improvement process are created the Information requirements chart in the offer-to-procurement business process, and the Project related initial information questionnaire to customer.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

For the paper mill profitability it is crucial to minimize overproduction and underproduction. Overproduction and underproduction both generate undesired costs and profit losses in paper mill production. This master’s thesis examines paper production order fulfillment subject from paper production level point of view. Research and development approach is selected due to clarification requirements in lately implemented manufacturing execution system. Manufacturing execution systems are generally expected to offer reliable and accurate information about mill production details. However, confusions are likely to occur after implementation of new manufacturing execution system. These confusions are usually harmful and become cumulatively more influential the longer they keep occurring. In this master’s thesis is presented actions to improve order fulfillment at paper mill production level. Central points of the improvement actions are a model for successful order fulfillment in paper mill production and manufacturing execution system catalogue configuration redesign. Improvement actions are implemented in Jokilaakso paper production plant and it is examined as a case study. In the end of this master’s thesis is presented performance measurements which demonstrate order fulfillment from case Jokilaakso.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis focuses on the molecular mechanisms regulating the photosynthetic electron transfer reactions upon changes in light intensity. To investigate these mechanisms, I used mutants of the model plant Arabidopsis thaliana impaired in various aspects of regulation of the photosynthetic light reactions. These included mutants of photosystem II (PSII) and light harvesting complex II (LHCII) phosphorylation (stn7 and stn8), mutants of energy-dependent non-photochemical quenching (NPQ) (npq1 and npq4) and of regulation of photosynthetic electron transfer (pgr5). All of these processes have been extensively investigated during the past decades, mainly on plants growing under steady-state conditions, and therefore many aspects of acclimation processes may have been neglected. In this study, plants were grown under fluctuating light, i.e. the alternation of low and high intensities of light, in order to maximally challenge the photosynthetic regulatory mechanisms. In pgr5 and stn7 mutants, the growth in fluctuating light condition mainly damaged PSI while PSII was rather unaffected. It is shown that the PGR5 protein regulates the linear electron transfer: it is essential for the induction of transthylakoid ΔpH that, in turn, activates energy-dependent NPQ and downregulates the activity of cytochrome b6f. This regulation was shown to be essential for the photoprotection of PSI under fluctuations in light intensity. The stn7 mutants were able to acclimate under constant growth light conditions by modulating the PSII/PSI ratio, while under fluctuating growth light they failed in implementing this acclimation strategy. LHCII phosphorylation ensures the balance of the excitation energy distribution between PSII and PSI by increasing the probability for excitons to be trapped by PSI. LHCII can be phosphorylated over all of the thylakoid membrane (grana cores as well as stroma lamellae) and when phosphorylated it constitutes a common antenna for PSII and PSI. Moreover, LHCII was shown to work as a functional bridge that allows the energy transfer between PSII units in grana cores and between PSII and PSI centers in grana margins. Consequently, PSI can function as a quencher of excitation energy. Eventually, the LHCII phosphorylation, NPQ and the photosynthetic control of linear electron transfer via cytochrome b6f work in concert to maintain the redox poise of the electron transfer chain. This is a prerequisite for successful plant growth upon changing natural light conditions, both in short- and long-term.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Waste has been incinerated for energy utilization for more than a hundred years, but the harmful emissions emitted from the incineration plants did not begin to cause concern until the 1980s. Many plants were shutdown and the waste incineration plant in Kyläsaari Helsinki was one of them. In later years, new landfill regulations have increased the interest in waste incineration. During the last year, four new plants were taken into operation in Finland, Westenergy in Vaasa among them. The presence of dust has been observed indoors at Westenergy waste incineration plant. Dust is defined as particles with a diameter above 10 μm, while fine particles have a diameter smaller than 2.5 μm, ultrafine under 0.1 μm and nanoparticles under 0.05 μm. In recent years, the focus of particle health research has been changed to investigate smaller particles. Ultrafine particles have been found to be more detrimental to health than larger particles. Limit values regulating the concentrations of ultrafine particles have not been determined yet. The objective of this thesis was to investigate dust and particles present inside the Westenergy waste incineration facility. The task was to investigate the potential pollutant sources and to give recommendations of how to minimize the presence of dust and particles in the power plant. The total particle number concentrations and size distributions where measured at 15 points inside the plant with an Engine Exhaust Particle Sizer (EEPS) Spectrometer. The measured particles were mainly in the ultrafine size range. Dust was only visually investigated, since the main purpose was to follow the dust accumulation. The measurement points inside the incineration plant were chosen according to investigate exposure to visitors and workers. At some points probable leakage of emissions were investigated. The measurements were carried out during approximately one month in March–April 2013. The results of the measurements showed that elevated levels of dust and particles are present in the indoor air at the waste incineration plant. The cleanest air was found in the control room, warehouse and office. The most polluted air was near the sources that were investigated due to possible leakage and in the bottom ash hall. However, the concentrations were near measured background concentrations in European cities and no leakage could be detected. The high concentrations were assumed to be a result of a lot of dust and particles present on surfaces that had not been cleaned in a while. The main source of the dust and particles present inside the waste incineration plant was thought to be particles and dust from the outside air. Other activities in the area around the waste incineration facility are ground work activities, stone crushing and traffic, which probably are sources of particle formation. Filtration of the outside air prior entering the facility would probably save personnel and visitors from nuisance and save in cleaning and maintenance costs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The role of contract manufacturing and subcontracting has been seen in black and white in product and service point of view. It used to be seen either as a product or a service. In the thesis product-service system, offering combining products and services, was discussed. Theory was created from two perspectives; Service productization via Business Model generation and product servitization via New Service Development process. Target for the case study was to point out new ways of service thinking and ways for changing business environment in contract manufacturing, especially in customer satisfaction and profitability point of view. The case study is following the New Service Development process phases. First ideas were collected from literature and via sales management interviews. Service offering and tool for service requirement evaluation was created. Last financial results of example service scenarios were calculated. It is recommended to take service offering into internal use and further develop it into modular service model. It is also recommended to take created customer service requirement evaluation tool into use for capturing customer service needs but also for communicating those internally.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Plant-virus interactions are very complex in nature and lead to disease and symptom formation by causing various physiological, metabolic and developmental changes in the host plants. These interactions are mainly the outcomes of viral hijacking of host components to complete their infection cycles and of host defensive responses to restrict the viral infections. Viral genomes contain only a small number of genes often encoding for multifunctional proteins, and all are essential in establishing a viral infection. Thus, it is important to understand the specific roles of individual viral genes and their contribution to the viral life cycles. Among the most important viral proteins are the suppressors of RNA silencing (VSRs). These proteins function to suppress host defenses mediated by RNA silencing and can also serve in other functions, e.g. in viral movement, transactivation of host genes, virus replication and protein processing. Thus these proteins are likely to have a significant impact on host physiology and metabolism. In the present study, I have examined the plant-virus interactions and the effects of three different VSRs on host physiology and gene expression levels by microarray analysis of transgenic plants that express these VSR genes. I also studied the gene expression changes related to the expression of the whole genome of Tobacco mosaic virus (TMV) in transgenic tobacco plants. Expression of the VSR genes in the transgenic tobacco plants causes significant changes in the gene expression profiles. HC-Pro gene derived from the Potyvirus Y (PVY) causes alteration of 748 and 332 transcripts, AC2 gene derived from the African cassava mosaic virus (ACMV) causes alteration of 1118 and 251transcripts, and P25 gene derived from the Potyvirus X (PVX) causes alterations of 1355 and 64 transcripts in leaves and flowers, respectively. All three VSRs cause similar up-regulation in defense, hormonally regulated and different stress-related genes and down-regulation in the photosynthesis and starch metabolism related genes. They also induce alterations that are specific to each viral VSR. The phenotype and transcriptome alterations of the HC-Pro expressing transgenic plants are similar to those observed in some Potyvirus-infected plants. The plants show increased protein degradation, which may be due to the HC-Pro cysteine endopeptidase and thioredoxin activities. The AC2-expressing transgenic plants show a similar phenotype and gene expression pattern as HC-Pro-expressing plants, but also alter pathways related to jasmonic acid, ethylene and retrograde signaling. In the P25 expressing transgenic plants, high numbers of genes (total of 1355) were up-regulated in the leaves, compared to a very low number of down-regulated genes (total of 5). Despite of strong induction of the transcripts, only mild growth reduction and no other distinct phenotype was observed in these plants. As an example of whole virus interactions with its host, I also studied gene expression changes caused by Tobacco mosaic virus (TMV) in tobacco host in three different conditions, i.e. in transgenic plants that are first resistant to the virus, and then become susceptible to it and in wild type plants naturally infected with this virus. The microarray analysis revealed up and down-regulation of 1362 and 1422 transcripts in the TMV resistant young transgenic plants, and up and down-regulation of a total of 1150 and 1200 transcripts, respectively, in the older plants, after the resistance break. Natural TMV infections in wild type plants caused up-regulation of 550 transcripts and down-regulation of 480 transcripts. 124 up-regulated and 29 down-regulated transcripts were commonly altered between young and old TMV transgenic plants, and only 6 up-regulated and none of the down-regulated transcripts were commonly altered in all three plants. During the resistant stage, the strong down-regulation in translation-related transcripts (total of 750 genes) was observed. Additionally, transcripts related to the hormones, protein degradation and defense pathways, cell division and stress were distinctly altered. All these alterations may contribute to the TMV resistance in the young transgenic plants, and the resistance may also be related to RNA silencing, despite of the low viral abundance and lack of viral siRNAs or TMV methylation activity in the plants.