73 resultados para casting manufacturing
Resumo:
There are two main objects in this study: First, to prove the importance of data accuracy to the business success, and second, create a tool for observing and improving the accuracy of ERP systems production master data. Sub-objective is to explain the need for new tool in client company and the meaning of it for the company. In the theoretical part of this thesis the focus is in stating the importance of data accuracy in decision making and it's implications on business success. Also basics of manufacturing planning are introduced in order to explain the key vocabulary. In the empirical part the client company and its need for this study is introduced. New master data report is introduced, and finally, analysing the report and actions based on the results of analysis are explained. The main results of this thesis are finding the interdependence between data accuracy and business success, and providing a report for continuous master data improvement in the client company's ERP system.
Resumo:
The objective in this Master's Thesis was to determine and verify quality criteria for veneer in plywood manufacturing. In plywood manufacturing the veneer quality has a decisive part how well it can be produced to a final product. Modern equipment run at high speed and capacity. These machines require a good quality veneer to be able to maintain them. The quality criteria determination was done after the dominant veneer properties were determined. This research focuses to the birch veneer quality determination. The machines involved in the veneer manufacturing are introduced in the materials and methods section. The different veneer properties are determined and the measuring devices to measure these properties are examined. There are many parts in veneer manufacturing and these have different requirements to the veneer quality. To determine and verify these properties for every machine was the most demanding part of this Master's Thesis. During the research some new ideas and ways to measure veneer properties were also tested. Veneer properties and quality was followed in a factory environment and in a test runs at the Raute. Different machines were followed carefully in the production environment while for example test pieces were taken from veneers that broke on the line. Sample pieces were tested on site or delivered to Nastola for more extensive testing. Based on the tests and research the criteria for veneer to every machine involved in the veneer production were created. These veneer quality tolerances are recommendations to ensure that the machine operation will not be affected by the veneer quality.
Resumo:
The objective of the master’s thesis is to define the warranty practices and costs in the welding machines manufacturing company and do a proposal for a warranty policy based on the practices and costs. The study include a disquisition of the warranty practices in the subsidiaries and distributor sales. The disquisition of the warranty practices introduces the information relates to warranty period, warranty costs, including repair, spare part and other costs, the practices with the replaced parts, the utilization rate of the eWarranty system and information relates to special arrangements in the warranties. The warranty costs are defined besides the group level also separately per regions and product families. From some product families the disquisition is done per products. In this study is also done a proposal for a warranty policy for the company. The proposal speaks out the length of warranty period, the compensation of the warranty costs, the practices with replaced parts and usage of eWarranty system.
Resumo:
Sales configurators are essential tools for companies that offer complicated case specifically crafted products for customers. Most sophisticated of them are able to design an entire end product on the fly according to given constraints, calculate price for the offer and move the order into production. This thesis covers a sales configurator acquisition project in a large industrial company that offers cranes for its customers. The study spans the preliminary stages of a large-scale software purchase project starting from the specification of problem domain and ending up presenting the most viable software solution that fulfils the requirements for the new system. The project consists of mapping usage environment, use cases, and collecting requirements that are expected from the new system. The collected requirements involve fitting the new sales system into enterprise application infrastructure, mitigating the risks involved in the project and specifying new features to the application whilst preserving all of the admired features of the old sales system currently used in the company. The collected requirements were presented to a number of different sales software vendors who were asked to provide solution suggestions that would fulfil all the demands. All of the received solution proposals were exposed to an evaluation to determine the most feasible solutions, and the construction of evaluation criteria itself was a part of the study. The final outcome of this study is a short-list of the most feasible sales configurator solutions together with a description of how software purchase process in large enterprises work, and which aspects should be paid attention in large projects of similar kind.
Resumo:
The usual objectives that companies have for subcontracting are studied in this thesis. The case company’s objectives for contract manufacturing now and in the future are identified. The main objective of the thesis is to create a focused model for the structure and supply chain management in the contract manufacturing network. This model is made for case company’s certain profit center. The different possibilities and their advantages and disadvantages for the structure and supply chain management are examined trough a theoretical review of literature. The possibilities found are then examined from the case company’s point of view. The case company point of view is established based on the opinions of the case company’s representatives. The outcome of the thesis is that the star shaped structure with supply chain management centralized to case company would be the best choice for the case company to manage the contract manufacture network.
Resumo:
In recent times of global turmoil, the need for uncertainty management has become ever momentous. The need for enhanced foresight especially concerns capital-intensive industries, which need to commit their resources and assets with long-term planning horizons. Scenario planning has been acknowledged to have many virtues - and limitations - concerning the mapping of the future and illustrating the alternative development paths. The present study has been initiated to address both the need of improved foresight in two capital-intensive industries, i.e. the paper and steel industries and the imperfections in the current scenario practice. The research problem has been approached by engendering a problem-solving vehicle, which combines, e.g. elements of generic scenario process, face-to-face group support methods, deductive scenario reasoning and causal mapping into a fully integrated scenario process. The process, called the SAGES scenario framework, has been empirically tested by creating alternative futures for two capital-intensive industries, i.e. the paper and steel industries. Three scenarios for each industry have been engendered together with the identification of the key megatrends, the most important foreign investment determinants, key future drivers and leading indicators for the materialisation of the scenarios. The empirical results revealed a two-fold outlook for the paper industry, while the steel industry future was seen as much more positive. The research found support for utilising group support systems in scenario and strategic planning context with some limitations. Key perceived benefits include high time-efficiency, productivity and lower resource-intensiveness. Group support also seems to enhance participant satisfaction, encourage innovative thinking and provide the users with personalised qualitative scenarios.
Resumo:
Diplomityössä on käsitelty tuulivoimalan generaattorin roottorin valmistusta ja magneettien kiinnitystä. Työ on osa projektia, jonka tarkoituksena on ollut tuottaa kohdeyritykselle vaihtoehtoinen tuulivoimalan generaattorin roottorirakenne. Työhön on koottu projektissa käsitellyt asiat roottorin valmistustekniikan osalta. Työssä on selvitetty kustannuksien kannalta paras vaihtoehto roottorin valmistamiseksi sisältäen kuljetukset ja magneettien kokoonpanon. Valmistusmenetelminä on vertailtu hitsausta ja valamista. Magneettien osalta tarkasteltiin uuden vaihtoehtoisen kiinnitysmenetelmän tuomia säästöjä nykyiseen ratkaisuun verrattuna. Uusien roottorien kustannuksia on verrattu nykyiseen rakenteeseen. Tutkimusmenetelminä on käytetty projektiryhmän palavereja, haastatteluja ja kirjallisuusselvityksiä. Lopputuloksena kohdeyritykselle luotiin uusi roottorikonsepti, jossa yhdistyvät edullisempi roottorin valmistus ja magneettien kiinnitys. Roottorin valmistaminen valamalla osoittautui selvästi edullisemmaksi kuin hitsaaminen levyistä. Magneettien kiinnitystä yksinkertaistettiin käyttämällä seostettuja magneetteja ja magneettikehyksiä. Roottorin konstruktiomuutoksien avulla mahdollistettiin suurempi magneettien määrä, joka mahdollistaa suuremman tehontuoton.
Resumo:
The objective of this thesis is to examine the factors that have an impact on the location decision of new manufacturing site and to create the relative order of importance of these factors by analytic hierarchy process (AHP). The decision making process especially related to the location selection and the measurement of the location factors are also examined. In theoretical part the character of decision making process and the relevant methods are introduced. Based on the previous studies of other researchers, the location factors are examined and the main research method, analytic hierarchy process, is also introduced. The empirical part of the study mainly follows the phases of decision making process and is emphasized on the main stages of analytic hierarchy process; building the hierarchy, defining the priorities and analyzing the results. The hierarchy is constructed from seven main criteria which all have several sub criteria. The evaluation of the hierarchy is implemented at the group decision making –laboratory and there can be seen significant differences between the importance of criteria. The final stage in the study is to create the appropriate measurement scales to the chosen criteria.
Resumo:
In this thesis, the purpose was to find the cost distribution of the screen dryer and the largest cost factors. The hot section of the screen dryer was revealed as the biggest cost factor, so composing new cost efficient solutions were directed to it. DFMA (Design for Manufacture and Assembly) was chosen to help the design process. DFMA is a product design strategy developed for taking manufacturing and assembly costs into account at the early stages of the design process. In the theory part of the thesis, other methods of economical design and tools needed for estimating manufacturing costs are introduced. In the empirical part, the hot section of the screen dryer was divided into sub-assemblies and their manufacturing costs were estimated. The design propositions were directed to the self-manufactured assemblies and parts. The new manufacturing costs were calculated for the developed propositions. Lastly, the most cost efficient solutions were summarized. The savings on the self-manufactured assemblies were about 40 %, which was about 13 % of the combined total costs of the hot section.
Resumo:
Larox Corporation is a provider of full service filtration in solid and liquid separation. Larox develops, designs, manufactures and supplies industrial filters. By Larox’s continuous development principle, a project for more efficient production was started. At the same time production planning was taken under review. Aim for this Master’s thesis was to find software designed for production planning purposes replacement for old Microsoft Excel based method. In this Master’s thesis current way of production planning was thoroughly analyzed and improvement targets were specified and also requirements for new software were assigned. Primary requirements for new software were possibility to production scheduling, planning, follow-up and also for long-time capacity planning and tracking. Also one demand was that new software should have data link to Larox’s current ERP-system. Result of this Master’s thesis was to start using Larox’s ERP-system also for production planning purposes. New mode of operation fulfils all requirements which were placed to new system. By using new method of production planning, production planners can get more easier and reliable data than from current system.
Resumo:
This Master’s thesis addresses different approaches using which a foreign IT company could enter Russian manufacturing industry with its enterprise information systems and IT services. In order to define the most suitable market entry approach, several aspects related to Russian manufacturing enterprises are studied. These aspects include challenges of doing ICT business with the previously mentioned enterprises, their perception of ICT role and their ICT preferences, as well as their buying behavior related to acquisition of information systems (IS). The study results show that there are several challenges that can be faced by a foreign IT vendor when starting conducting ICT business with Russian manufacturing enterprises. The results also show that Russian manufacturing industry is still rather immature in sense of business process automation, and its IT buying behavior is rather specific and complicated. The results suggest that an efficient way to approach these enterprises is through a network of trusted partners that consists of reliable Russian IS integrators and business consultants having established connections to Russian manufacturing companies and possessing the needed competence.
Resumo:
The main objective of this study is to examine the relationships between resources, competitive advantage and firm success. The study focuses, on one hand, on the financial performance of service-intensive manufac-turing firms against competitors with a lower service intensity and, on the other hand, on the resources as drivers for competitive advantage and success. The purpose of the theoretical part is to link the study in the field of the strategy research. The empirical part of the study is based on the quantitative analyses of the survey data collected from 50 major suppliers of industrial machinery and transportation equipment in Europe and North America. Results indicate that service-intensive manufacturing firms have performed better and their performance has been more stable vis-à-vis their peers. The main resources that differentiate service-intensive manufacturing firms from their non-service intensive competitors are service strategy and service-oriented top management. The analyses on the VRIO resources produced only a limited amount of information and solely service-centred culture appeared to be a rent generating resource.
Resumo:
Työssä tarkastellaan sähkögeneraattorin runkokappaleen valmistettavuutta. Työ on tehty eräälle yritykselle, joka jätetään mainitsematta. Työhön liittyvät valmistuskuvat ovat salaisia ja niiden yleinen esittely ei ole mahdollista. Yritys kehittää uutta sähkögeneraattorituoteperhettä ja generaattorin runkokappale halutaan mahdollisimman helpoksi ja kustannustehokkaaksi valmistaa. Sähkögeneraattoreita on tarkoitus valmistaa vuositasolla kymmeniä tai jopa pari sataa kappaletta. Mahdolliset valmistusmenetelmät on rajattu ennen työn aloittamista MAG-hitsaukseen ja valamiseen, niiden ollessa todennäköisimmät valmistusmenetelmät. MAG-hitsauksessa huomioidaan prosessin tehostamiskeinot ja robotisoidun hitsauksen mahdollisuus. Valaminen rajattiin hiekkavaluun, joka on kertamuottimenetelmä ja soveltuu yksittäiskappaletuotannosta aina sarjatuotantoon. Materiaaliksi hitsaukseen valittiin rakenneteräs S355 ja valettaviksi materiaalivaihtoehdoiksi pallografiittivaluraudat EN-GJS-400-15U ja EN-GJS-500. Teoriaosuudessa on esitelty teettäjän pyytämä valmistusmenetelmien perusteoria ja sen jälkeen on tarkemmin tarkasteltu hitsattavan ja valettavan runkokappaleen muotoiluun liittyvää teoriaa. Hitsattavan kappaleen robotisoituun hitsaukseen liittyy myös vahvasti kappaleenkäsittely ja hitsauskiinnittimet, jotka välillisesti vaikuttavat myös kappaleen muotoiluun. Tätä työtä kirjoitettaessa generaattori on suunnitteluvaiheessa. Runkokappale on suunniteltu valmistettavaksi levyosista hitsaamalla. Tämä kehitysversio analysoidaan Design for manufacturing and assembly -menetelmän keinoin, ja runkokappaleelle esitetään rakennemuutosehdotuksia, jotka parantavat kappaleen valmistettavuutta. Runkokappaleen valmistaminen valamalla vaatii tuotteen muodon valuteknisen tarkastelun. Lopuksi hitsausta ja valamista verrataan toisiinsa ja arvioidaan niiden ominaisuuksia keskenään. Työssä ei päädytä lopulliseen valmistusmenetelmän valintaan, koska ei ole tiedossa käytössä olevia laitteistoja. Laitteistot määräävät käytetyt rakenneratkaisut ja valmistusmenetelmät.
Researching Manufacturing Planning and Control system and Master Scheduling in a manufacturing firm.
Resumo:
The objective of this thesis is to research Manufacturing Planning and Control (MPC) system and Master Scheduling (MS) in a manufacturing firm. The study is conducted at Ensto Finland Corporation, which operates on a field of electrical systems and supplies. The paper consists of theoretical and empirical parts. The empirical part is based on weekly operating at Ensto and includes inter-firm material analysis, learning and meetings. Master Scheduling is an important module of an MPC system, since it is beneficial on transforming strategic production plans based on demand forecasting into operational schedules. Furthermore, capacity planning tools can remarkably contribute to production planning: by Rough-Cut Capacity Planning (RCCP) tool, a MS plan can be critically analyzed in terms of available key resources in real manufacturing environment. Currently, there are remarkable inefficiencies when it comes to Ensto’s practices: the system is not able to take into consideration seasonal demand and react on market changes on time; This can cause significant lost sales. However, these inefficiencies could be eliminated through the appropriate utilization of MS and RCCP tools. To utilize MS and RCCP tools in Ensto’s production environment, further testing in real production environment is required. Moreover, data accuracy, appropriate commitment to adapting and learning the new tools, and continuous developing of functions closely related to MS, such as sales forecasting, need to be ensured.
Resumo:
This thesis studies the use of heuristic algorithms in a number of combinatorial problems that occur in various resource constrained environments. Such problems occur, for example, in manufacturing, where a restricted number of resources (tools, machines, feeder slots) are needed to perform some operations. Many of these problems turn out to be computationally intractable, and heuristic algorithms are used to provide efficient, yet sub-optimal solutions. The main goal of the present study is to build upon existing methods to create new heuristics that provide improved solutions for some of these problems. All of these problems occur in practice, and one of the motivations of our study was the request for improvements from industrial sources. We approach three different resource constrained problems. The first is the tool switching and loading problem, and occurs especially in the assembly of printed circuit boards. This problem has to be solved when an efficient, yet small primary storage is used to access resources (tools) from a less efficient (but unlimited) secondary storage area. We study various forms of the problem and provide improved heuristics for its solution. Second, the nozzle assignment problem is concerned with selecting a suitable set of vacuum nozzles for the arms of a robotic assembly machine. It turns out that this is a specialized formulation of the MINMAX resource allocation formulation of the apportionment problem and it can be solved efficiently and optimally. We construct an exact algorithm specialized for the nozzle selection and provide a proof of its optimality. Third, the problem of feeder assignment and component tape construction occurs when electronic components are inserted and certain component types cause tape movement delays that can significantly impact the efficiency of printed circuit board assembly. Here, careful selection of component slots in the feeder improves the tape movement speed. We provide a formal proof that this problem is of the same complexity as the turnpike problem (a well studied geometric optimization problem), and provide a heuristic algorithm for this problem.