50 resultados para citation
Resumo:
This paper presents a genetic algorithm-based approach for project scheduling with multi-modes and renewable resources. In this problem activities of the project may be executed in more than one operating mode and renewable resource constraints are imposed. The objective function is the minimization of the project completion time. The idea of this approach is integrating a genetic algorithm with a schedule generation scheme. This study also proposes applying a local search procedure trying to yield a better solution when the genetic algorithm and the schedule generation scheme obtain a solution. The experimental results show that this algorithm is an effective method for solving this problem.
Resumo:
This article presents a dynamical analysis of several traffic phenomena, applying a new modelling formalism based on the embedding of statistics and Laplace transform. The new dynamic description integrates the concepts of fractional calculus leading to a more natural treatment of the continuum of the Transfer Function parameters intrinsic in this system. The results using system theory tools point out that it is possible to study traffic systems, taking advantage of the knowledge gathered with automatic control algorithms. Dynamics, Games and Science I Dynamics, Games and Science I Look Inside Other actions Export citation About this Book Reprints and Permissions Add to Papers Share Share this content on Facebook Share this content on Twitter Share this content on LinkedIn
Resumo:
- The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm
Resumo:
On-chip debug (OCD) features are frequently available in modern microprocessors. Their contribution to shorten the time-to-market justifies the industry investment in this area, where a number of competing or complementary proposals are available or under development, e.g. NEXUS, CJTAG, IJTAG. The controllability and observability features provided by OCD infrastructures provide a valuable toolbox that can be used well beyond the debugging arena, improving the return on investment rate by diluting its cost across a wider spectrum of application areas. This paper discusses the use of OCD features for validating fault tolerant architectures, and in particular the efficiency of various fault injection methods provided by enhanced OCD infrastructures. The reference data for our comparative study was captured on a workbench comprising the 32-bit Freescale MPC-565 microprocessor, an iSYSTEM IC3000 debugger (iTracePro version) and the Winidea 2005 debugging package. All enhanced OCD infrastructures were implemented in VHDL and the results were obtained by simulation within the same fault injection environment. The focus of this paper is on the comparative analysis of the experimental results obtained for various OCD configurations and debugging scenarios.
Resumo:
This paper presents a methodology for applying scheduling algorithms using Monte Carlo simulation. The methodology is based on a decision support system (DSS). The proposed methodology combines a genetic algorithm with a new local search using Monte Carlo Method. The methodology is applied to the job shop scheduling problem (JSSP). The JSSP is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. The methodology is tested on a set of standard instances taken from the literature and compared with others. The computation results validate the effectiveness of the proposed methodology. The DSS developed can be utilized in a common industrial or construction environment.
Resumo:
As electronic devices get smaller and more complex, dependability assurance is becoming fundamental for many mission critical computer based systems. This paper presents a case study on the possibility of using the on-chip debug infrastructures present in most current microprocessors to execute real time fault injection campaigns. The proposed methodology is based on a debugger customized for fault injection and designed for maximum flexibility, and consists of injecting bit-flip type faults on memory elements without modifying or halting the target application. The debugger design is easily portable and applicable to different architectures, providing a flexible and efficient mechanism for verifying and validating fault tolerant components.
Resumo:
Informal Learning plays an important role in everyone's life and yet we often are unaware of it. The need to keep track of the knowledge acquired through informal learning is increasing as its sources become increasingly diverse. This paper presents a study on a tool developed to help keeping track of learners' informal learning, both within academic and professional contexts, This tool, developed within the European Commission funded TRAILER project, will further integrate the improvements suggested by users during the piloting phase. The two studied contexts were similar regarding the importance and perception of Informal Learning, but differed concerning tool usage. The overall idea of managing one's informal learning was well accepted and welcomed, which validated the emerging need for a tool with this purpose.
Resumo:
This paper presents an optimization approach for the job shop scheduling problem (JSSP). The JSSP is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. The proposed approach is based on a genetic algorithm technique. The scheduling rules such as SPT and MWKR are integrated into the process of genetic evolution. The chromosome representation of the problem is based on random keys. The schedules are constructed using a priority rule in which the priorities and delay times of the operations are defined by the genetic algorithm. Schedules are constructed using a procedure that generates parameterized active schedules. After a schedule is obtained a local search heuristic is applied to improve the solution. The approach is tested on a set of standard instances taken from the literature and compared with other approaches. The computation results validate the effectiveness of the proposed approach.
Resumo:
Following targeted advertising and product placement, TV and online media needs more personalised methods of engaging viewers by integrating advertising and informational messages into playout content, whether real-time broadcast or on-demand. Future advertising solutions need adaptivity to individuals or on-line groups to respond to the commercial requirements of clients and agencies.
Resumo:
Personalised video can be achieved by inserting objects into a video play-out according to the viewer's profile. Content which has been authored and produced for general broadcast can take on additional commercial service features when personalised either for individual viewers or for groups of viewers participating in entertainment, training, gaming or informational activities. Although several scenarios and use-cases can be envisaged, we are focussed on the application of personalised product placement. Targeted advertising and product placement are currently garnering intense interest in the commercial networked media industries. Personalisation of product placement is a relevant and timely service for next generation online marketing and advertising and for many other revenue generating interactive services. This paper discusses the acquisition and insertion of media objects into a TV video play-out stream where the objects are determined by the profile of the viewer. The technology is based on MPEG-4 standards using object based video and MPEG-7 for metadata. No proprietary technology or protocol is proposed. To trade the objects into the video play-out, a Software-as-a-Service brokerage platform based on intelligent agent technology is adopted. Agencies, libraries and service providers are represented in a commercial negotiation to facilitate the contractual selection and usage of objects to be inserted into the video play-out.
Resumo:
The environmental management domain is vast and encompasses many identifiable activities: impact assessment, planning, project evaluation, etc. In particular, this paper focusses on the modelling of the project evaluation activity. The environmental decision support system under development aims to provide assistance to project developers in the selection of adequate locations, guaranteeing the compliance with the applicable regulations and the existing development plans as well as satisfying the specified project requirements. The inherent multidisciplinarity features of this activity lead to the adoption of the Multi-Agent paradigm, and, in particular, to the modelling of the involved agencies as a community of cooperative autonomous agents, where each agency contributes with its share of problem solving to the final system’s recommendation. To achieve this behaviour the many conclusions of the individual agencies have to be justifiably accommodated: not only they may differ, but can be interdependent, complementary, irreconcilable, or simply, independent. We propose different solutions (involving both local and global consistency) to support the adequate merge of the distinct perspectives that inevitably arise during this type of decision making.
Resumo:
Consider the problem of assigning implicit-deadline sporadic tasks on a heterogeneous multiprocessor platform comprising a constant number (denoted by t) of distinct types of processors—such a platform is referred to as a t-type platform. We present two algorithms, LPGIM and LPGNM, each providing the following guarantee. For a given t-type platform and a task set, if there exists a task assignment such that tasks can be scheduled to meet their deadlines by allowing them to migrate only between processors of the same type (intra-migrative), then: (i) LPGIM succeeds in finding such an assignment where the same restriction on task migration applies (intra-migrative) but given a platform in which only one processor of each type is 1 + α × t-1/t times faster and (ii) LPGNM succeeds in finding a task assignment where tasks are not allowed to migrate between processors (non-migrative) but given a platform in which every processor is 1 + α times faster. The parameter α is a property of the task set; it is the maximum of all the task utilizations that are no greater than one. To the best of our knowledge, for t-type heterogeneous multiprocessors: (i) for the problem of intra-migrative task assignment, no previous algorithm exists with a proven bound and hence our algorithm, LPGIM, is the first of its kind and (ii) for the problem of non-migrative task assignment, our algorithm, LPGNM, has superior performance compared to state-of-the-art.
Resumo:
Consider scheduling of real-time tasks on a multiprocessor where migration is forbidden. Specifically, consider the problem of determining a task-to-processor assignment for a given collection of implicit-deadline sporadic tasks upon a multiprocessor platform in which there are two distinct types of processors. For this problem, we propose a new algorithm, LPC (task assignment based on solving a Linear Program with Cutting planes). The algorithm offers the following guarantee: for a given task set and a platform, if there exists a feasible task-to-processor assignment, then LPC succeeds in finding such a feasible task-to-processor assignment as well but on a platform in which each processor is 1.5 × faster and has three additional processors. For systems with a large number of processors, LPC has a better approximation ratio than state-of-the-art algorithms. To the best of our knowledge, this is the first work that develops a provably good real-time task assignment algorithm using cutting planes.
Resumo:
“Many-core” systems based on a Network-on-Chip (NoC) architecture offer various opportunities in terms of performance and computing capabilities, but at the same time they pose many challenges for the deployment of real-time systems, which must fulfill specific timing requirements at runtime. It is therefore essential to identify, at design time, the parameters that have an impact on the execution time of the tasks deployed on these systems and the upper bounds on the other key parameters. The focus of this work is to determine an upper bound on the traversal time of a packet when it is transmitted over the NoC infrastructure. Towards this aim, we first identify and explore some limitations in the existing recursive-calculus-based approaches to compute the Worst-Case Traversal Time (WCTT) of a packet. Then, we extend the existing model by integrating the characteristics of the tasks that generate the packets. For this extended model, we propose an algorithm called “Branch and Prune” (BP). Our proposed method provides tighter and safe estimates than the existing recursive-calculus-based approaches. Finally, we introduce a more general approach, namely “Branch, Prune and Collapse” (BPC) which offers a configurable parameter that provides a flexible trade-off between the computational complexity and the tightness of the computed estimate. The recursive-calculus methods and BP present two special cases of BPC when a trade-off parameter is 1 or ∞, respectively. Through simulations, we analyze this trade-off, reason about the implications of certain choices, and also provide some case studies to observe the impact of task parameters on the WCTT estimates.
Resumo:
This paper presents a step count algorithm designed to work in real-time using low computational power. This proposal is our first step for the development of an indoor navigation system, based on Pedestrian Dead Reckoning (PDR). We present two approaches to solve this problem and compare them based in their error on step counting, as well as, the capability of their use in a real time system.