A genetic algorithm for project scheduling with multi-modes and renewable resources


Autoria(s): Magalhães-Mendes, J.
Data(s)

17/03/2014

17/03/2014

2010

Resumo

This paper presents a genetic algorithm-based approach for project scheduling with multi-modes and renewable resources. In this problem activities of the project may be executed in more than one operating mode and renewable resource constraints are imposed. The objective function is the minimization of the project completion time. The idea of this approach is integrating a genetic algorithm with a schedule generation scheme. This study also proposes applying a local search procedure trying to yield a better solution when the genetic algorithm and the schedule generation scheme obtain a solution. The experimental results show that this algorithm is an effective method for solving this problem.

Identificador

978-960-474-252-3

http://hdl.handle.net/10400.22/4226

Idioma(s)

eng

Publicador

ACM

Relação

World Scientific and Engineering Academy and Society (WSEAS);

http://dl.acm.org/citation.cfm?id=1965708

Direitos

closedAccess

Tipo

article