56 resultados para project formulation
Resumo:
This paper presents a genetic algorithm for the resource constrained multi-project scheduling problem. The chromosome representation of the problem is based on random keys. The schedules are constructed using a heuristic that builds parameterized active schedules based on priorities, delay times, and release dates defined by the genetic algorithm. The approach is tested on a set of randomly generated problems. The computational results validate the effectiveness of the proposed algorithm.
Resumo:
The process of resources systems selection takes an important part in Distributed/Agile/Virtual Enterprises (D/A/V Es) integration. However, the resources systems selection is still a difficult matter to solve in a D/A/VE, as it is pointed out in this paper. Globally, we can say that the selection problem has been equated from different aspects, originating different kinds of models/algorithms to solve it. In order to assist the development of a web prototype tool (broker tool), intelligent and flexible, that integrates all the selection model activities and tools, and with the capacity to adequate to each D/A/V E project or instance (this is the major goal of our final project), we intend in this paper to show: a formulation of a kind of resources selection problem and the limitations of the algorithms proposed to solve it. We formulate a particular case of the problem as an integer programming, which is solved using simplex and branch and bound algorithms, and identify their performance limitations (in terms of processing time) based on simulation results. These limitations depend on the number of processing tasks and on the number of pre-selected resources per processing tasks, defining the domain of applicability of the algorithms for the problem studied. The limitations detected open the necessity of the application of other kind of algorithms (approximate solution algorithms) outside the domain of applicability founded for the algorithms simulated. However, for a broker tool it is very important the knowledge of algorithms limitations, in order to, based on problem features, develop and select the most suitable algorithm that guarantees a good performance.
Resumo:
This paper presents a genetic algorithm-based approach for project scheduling with multi-modes and renewable resources. In this problem activities of the project may be executed in more than one operating mode and renewable resource constraints are imposed. The objective function is the minimization of the project completion time. The idea of this approach is integrating a genetic algorithm with a schedule generation scheme. This study also proposes applying a local search procedure trying to yield a better solution when the genetic algorithm and the schedule generation scheme obtain a solution. The experimental results show that this algorithm is an effective method for solving this problem.
Resumo:
The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.
Resumo:
- The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm
Resumo:
This paper presents a biased random-key genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. Active schedules are constructed using a priority-rule heuristic in which the priorities of the activities are defined by the genetic algorithm. A forward-backward improvement procedure is applied to all solutions. The chromosomes supplied by the genetic algorithm are adjusted to reflect the solutions obtained by the improvement procedure. The heuristic is tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.
Resumo:
This paper presents a genetic algorithm for the multimode resource-constrained project scheduling problem (MRCPSP), in which multiple execution modes are available for each of the activities of the project. The objective function is the minimization of the construction project completion time. To solve the problem, is applied a two-level genetic algorithm, which makes use of two separate levels and extend the parameterized schedule generation scheme by introducing an improvement procedure. It is evaluated the quality of the schedule and present detailed comparative computational results for the MRCPSP, which reveal that this approach is a competitive algorithm.
Resumo:
The evolution of new technology and its increasing use, have for some years been making the existence of informal learning more and more transparent, especially among young and older adults in both Higher Education and workplace contexts. However, the nature of formal and non-formal, course-based, approaches to learning has made it hard to accommodate these informal processes satisfactorily, and although technology bring us near to the solution, it has not yet achieved. TRAILER project aims to address this problem by developing a tool for the management of competences and skills acquired through informal learning experiences, both from the perspective of the user and the institution or company. This paper describes the research and development main lines of this project.
Resumo:
Num mercado cada vez mais competitivo, torna-se fundamental para as empresas produzirem mais com menos recursos, aumentando a eficiência interna, através da otimização dos seus processos. Neste contexto aparece o Lean Manufacturing, metodologia que tem como objetivo criar valor para os stakeholders, através da eliminação de desperdício na cadeia de valor. Este projeto descreve a análise e a formulação de soluções do processo de produção de um Módulo de Serviço, produto que faz parte do sistema elétrico de um elevador. Para análise do problema utilizamos técnicas e ferramentas lean, tais como, o value stream mapping (VSM), o diagrama de processo e o diagrama de spaghetti. Para formulação do problema usamos o value stream design (VSD), a metodologia 5S, o sistema Kanban e a criação de fluxo contínuo, através do conceito takt time, do sistema Pull, da definição do processo pacemaker, da programação nivelada (Heijunka), do conceito pitch time e da caixa de nivelamento (Heijunka Box). Com este projeto pretendemos demonstrar que a implementação de um fluxo unitário de peças através da filosofia Lean Manufacturing, acrescenta qualidade ao produto, cria flexibilidade, aumenta a produtividade, liberta áreas de produção, aumenta a segurança, reduz o custo com o stock e aumenta a motivação organizacional.
Resumo:
This paper presents a genetic algorithm for the Resource Constrained Project Scheduling Problem (RCPSP). The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities of the activities are defined by the genetic algorithm. The heuristic generates parameterized active schedules. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.
Resumo:
The minimization of the power loss and the use of the biodegradable greases have attracting considerable attention. To compare the energetic performance of biodegradable lubricant greases, power loss tests were performed on a modified four-ball machine. A correlation between the grease formulation and rheology was established with its energetic performance
Resumo:
Volatile organic compounds are a common source of groundwater contamination that can be easily removed by air stripping in columns with random packing and using a counter-current flow between the phases. This work proposes a new methodology for the column design for any particular type of packing and contaminant avoiding the necessity of a pre-defined diameter used in the classical approach. It also renders unnecessary the employment of the graphical Eckert generalized correlation for pressure drop estimates. The hydraulic features are previously chosen as a project criterion and only afterwards the mass transfer phenomena are incorporated, in opposition to conventional approach. The design procedure was translated into a convenient algorithm using C++ as programming language. A column was built in order to test the models used either in the design or in the simulation of the column performance. The experiments were fulfilled using a solution of chloroform in distilled water. Another model was built to simulate the operational performance of the column, both in steady state and in transient conditions. It consists in a system of two partial non linear differential equations (distributed parameters). Nevertheless, when flows are steady, the system became linear, although there is not an evident solution in analytical terms. In steady state the resulting system of ODE can be solved, allowing for the calculation of the concentration profile in both phases inside the column. In transient state the system of PDE was numerically solved by finite differences, after a previous linearization.
Resumo:
International Workshop on solutions that Enhance Informal LEarning Recognition – WEILER 2013
Resumo:
Remote labs offer many unique advantages to students as they provide opportunities to access experiments and learning scenarios that would be otherwise unavailable. At the same time, however, these opportunities introduce real challenges to the institutions hosting the remote labs. This paper draws on the experiences of the REXNET project consortium to expose a number of these issues as a means of furthering the debate on the value of remote labs and the best practices in deploying them. The paper presents a brief outline of the various types of remote lab scenarios that might be deployed. It then describes the key human and technological actors that have an interest in or are intrinsic to a remote lab instance, with a description of the role of each actor and their interest. Some relationships between these various actors are then discussed with some factors that might influence those relationships. Finally some general issues are briefly described.
Resumo:
The European Project Semester at ISEP (EPS@ISEP) is a one semester project-based learning programme addressed to engineering students from diverse scientific backgrounds and nationalities. The students, organized in multicultural teams, are challenged to solve real world multidisciplinary problems, accounting for 30 ECTU. The EPS package, although focused on project development (20 ECTU), includes a series of complementary seminars aimed at fostering soft, project-related and engineering transversal skills (10 ECTU). This paper presents the study plan, resources, operation and results of the EPS@ISEP that was created in 2011 to apply the best engineering education practices and promote the internationalization of ISEP. The results show that the EPS@ISEP students acquire during one semester the scientific, technical and soft competences necessary to propose, design and implement a solution for a multidisciplinary problem.