104 resultados para profitability analyzing

em Repositório Científico do Instituto Politécnico de Lisboa - Portugal


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica

Relevância:

20.00% 20.00%

Publicador:

Resumo:

When considering time series data of variables describing agent interactions in social neurobiological systems, measures of regularity can provide a global understanding of such system behaviors. Approximate entropy (ApEn) was introduced as a nonlinear measure to assess the complexity of a system behavior by quantifying the regularity of the generated time series. However, ApEn is not reliable when assessing and comparing the regularity of data series with short or inconsistent lengths, which often occur in studies of social neurobiological systems, particularly in dyadic human movement systems. Here, the authors present two normalized, nonmodified measures of regularity derived from the original ApEn, which are less dependent on time series length. The validity of the suggested measures was tested in well-established series (random and sine) prior to their empirical application, describing the dyadic behavior of athletes in team games. The authors consider one of the ApEn normalized measures to generate the 95th percentile envelopes that can be used to test whether a particular social neurobiological system is highly complex (i.e., generates highly unpredictable time series). Results demonstrated that suggested measures may be considered as valid instruments for measuring and comparing complexity in systems that produce time series with inconsistent lengths.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

O trabalho que a seguir se apresenta tem como objectivo descrever a criação de um modelo que sirva de suporte a um sistema de apoio à decisão sobre o risco inerente à execução de projectos na área das Tecnologias de Informação (TI) recorrendo a técnicas de mineração de dados. Durante o ciclo de vida de um projecto, existem inúmeros factores que contribuem para o seu sucesso ou insucesso. A responsabilidade de monitorizar, antever e mitigar esses factores recai sobre o Gestor de Projecto. A gestão de projectos é uma tarefa difícil e dispendiosa, consome muitos recursos, depende de numerosas variáveis e, muitas vezes, até da própria experiência do Gestor de Projecto. Ao ser confrontado com as previsões de duração e de esforço para a execução de uma determinada tarefa, o Gestor de Projecto, exceptuando a sua percepção e intuição pessoal, não tem um modo objectivo de medir a plausibilidade dos valores que lhe são apresentados pelo eventual executor da tarefa. As referidas previsões são fundamentais para a organização, pois sobre elas são tomadas as decisões de planeamento global estratégico corporativo, de execução, de adiamento, de cancelamento, de adjudicação, de renegociação de âmbito, de adjudicação externa, entre outros. Esta propensão para o desvio, quando detectada numa fase inicial, pode ajudar a gerir melhor o risco associado à Gestão de Projectos. O sucesso de cada projecto terminado foi qualificado tendo em conta a ponderação de três factores: o desvio ao orçamentado, o desvio ao planeado e o desvio ao especificado. Analisando os projectos decorridos, e correlacionando alguns dos seus atributos com o seu grau de sucesso o modelo classifica, qualitativamente, um novo projecto quanto ao seu risco. Neste contexto o risco representa o grau de afastamento do projecto ao sucesso. Recorrendo a algoritmos de mineração de dados, tais como, árvores de classificação e redes neuronais, descreve-se o desenvolvimento de um modelo que suporta um sistema de apoio à decisão baseado na classificação de novos projectos. Os modelos são o resultado de um extensivo conjunto de testes de validação onde se procuram e refinam os indicadores que melhor caracterizam os atributos de um projecto e que mais influenciam o risco. Como suporte tecnológico para o desenvolvimento e teste foi utilizada a ferramenta Weka 3. Uma boa utilização do modelo proposto possibilitará a criação de planos de contingência mais detalhados e uma gestão mais próxima para projectos que apresentem uma maior propensão para o risco. Assim, o resultado final pretende constituir mais uma ferramenta à disposição do Gestor de Projecto.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Este trabalho tem como objectivo apresentar as ferramentas do Lean Thinking e realizar um estudo de caso numa organização em que este sistema é utilizado. Numa primeira fase do trabalho será feito uma análise bibliográfica sobre o ―Lean Thinking”, que consiste num sistema de negócios, uma forma de especificar valor e delinear a melhor sequência de acções que criam valor. Em seguida, será realizado um estudo de caso numa Empresa – Divisão de Motores – no ramo da aeronáutica com uma longa e conceituada tradição com o objectivo de reduzir o TAT (turnaround time – tempo de resposta), ou seja, o tempo desde a entrada de um motor na divisão até à entrega ao cliente. Primeiramente, analisando as falhas existentes em todo o processo do motor, isto é, a análise de tempos de reparação de peças à desmontagem do motor que têm que estar disponíveis à montagem do mesmo, peças que são requisitadas a outros departamentos da Empresa e as mesmas não estão disponíveis quando são precisas passando pelo layout da divisão. Por fim, fazer uma análise dos resultados até então alcançados na divisão de Motores e aplicar as ferramentas do ―Lean Thinking‖ com o objectivo da implementação. É importante referir que a implementação bem-sucedida requer, em primeiro lugar e acima de tudo, um firme compromisso da administração com uma completa adesão à cultura da procura e eliminação de desperdício. Para concluir o trabalho, destaca-se a importância deste sistema e quais são as melhorias que se podem conseguir com a sua implantação.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

O objectivo deste trabalho passa pelo desenvolvimento de uma ferramenta de simulação dinâmica de recursos rádio em LTE no sentido descendente, com recurso à Framework OMNeT++. A ferramenta desenvolvida permite realizar o planeamento das estações base, simulação e análise de resultados. São descritos os principais aspectos da tecnologia de acesso rádio, designadamente a arquitectura da rede, a codificação, definição dos recursos rádio, os ritmos de transmissão suportados ao nível de canal e o mecanismo de controlo de admissão. Foi definido o cenário de utilização de recursos rádio que inclui a definição de modelos de tráfego e de serviços orientados a pacotes e circuitos. Foi ainda considerado um cenário de referência para a verificação e validação do modelo de simulação. A simulação efectua-se ao nível de sistema, suportada por um modelo dinâmico, estocástico e orientado por eventos discretos de modo a contemplar os diferentes mecanismos característicos da tecnologia OFDMA. Os resultados obtidos permitem a análise de desempenho dos serviços, estações base e sistema ao nível do throughput médio da rede, throughput médio por eNodeB e throughput médio por móvel para além de permitir analisar o contributo de outros parâmetros designadamente, largura de banda, raio de cobertura, perfil dos serviços, esquema de modulação, entre outros. Dos resultados obtidos foi possível verificar que, considerando um cenário com estações base com raio de cobertura de 100 m obteve-se um throughput ao nível do utilizador final igual a 4.69494 Mbps, ou seja, 7 vezes superior quando comparado a estações base com raios de cobertura de 200m.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

O presente trabalho refere-se a um projecto real de investimento imobiliário, relativo à construção e comercialização de duas moradias geminadas destinadas a habitação. Este estudo permite ao promotor avaliar o seu interesse económico, caracterizar oportunidades e identificar factores de risco, permitindo uma tomada de decisão baseada em estudos económicos objectivos e fundamentados, e não apenas pela sua intuição. Após a pesquisa sobre o estado de conhecimento deste tema, iniciou-se o estudo do projecto, caracterizando-o numa fase inicial, com a realização de um estudo prévio da sua viabilidade económica, recorrendo a métodos simplificados para a obtenção dos parâmetros de análise necessários, como sejam, os custo do terreno e da construção, a duração da obra, o PVT do imóvel, e a distribuição temporal dos custos e receitas. É então realizada a análise com base em descontos de fluxos de caixa, para determinar a rendibilidade do projecto, através dos parâmetros de decisão VAL e TIR. Concluindo-se que o projecto é economicamente viável, inicia-se a obra e apuram-se os valores reais dos diversos parâmetros de análise, ficando no final com as variáveis estimadas do PVT e do tempo necessário à comercialização do imóvel. É também abordada a importância da gestão coordenação e fiscalização da obra. Com os valores reais obtidos são traçados diversos cenários, analisado o recurso a capital alheio, às variações no PVT e no tempo necessário para a comercialização do imóvel e a possibilidade de arrendamento com posterior venda. A análise do projecto segundo esses cenários, permite obter medidas de rendibilidade e compará-los. É então feita a comparação entre as rendibilidades dos vários cenários e retiradas as conclusões sobre os resultados obtidos. Para melhor compreensão dos resultados, é feita uma abordagem à crise imobiliária sentida em Portugal e à possibilidade do uso da permuta imobiliária para facilitar a realização dos negócios imobiliários. No final, serão realizadas recomendações e propostas de melhoria para estudos que possam ser relevantes para o tema e dar uma possível continuidade a este trabalho.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Demand for power is growing every day, mainly due to emerging economies in countries such as China, Russia, India, and Brazil. During the last 50 years steam pressure and temperature in power plants have been continuously raised to improve thermal efficiency. Recent efforts to improve efficiency leads to the development of a new generation of heat recovery steam generator, where the Benson once-through technology is applied to improve the thermal efficiency. The main purpose of this paper is to analyze the mechanical behavior of a high pressure superheater manifold by applying finite element modeling and a finite element analysis with the objective of analyzing stress propagation, leading to the study of damage mechanism, e.g., uniaxial fatigue, uniaxial creep for life prediction. The objective of this paper is also to analyze the mechanical properties of the new high temperature resistant materials in the market such as 2Cr Bainitic steels (T/P23 and T/P24) and also the 9-12Cr Martensitic steels (T/P91, T/P92, E911, and P/T122). For this study the design rules for construction of power boilers to define the geometry of the HPSH manifold were applied.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

O risco associado a um navio em manobra pode ser avaliado pela probabilidade do movimento vertical de um ponto do navio ultrapassar um determinado limiar pré-definido. Essa excedência pode originar danos tanto no próprio navio como nas estruturas portuárias envolventes. Este trabalho surge no seguimento de um estudo efectuado no Laboratório Nacional de Engenharia Civil (LNEC), no qual foi desenvolvido um conjunto de ferramentas de avaliação da função resposta do navio quando sujeito à agitação marítima e, partindo dessas ferramentas, foi obtido um procedimento para determinação do espectro dos movimentos verticais de um ponto de um navio parado sujeito àquele estado de agitação (Rodrigues, 2010). No presente estudo, estendeu-se esse procedimento de modo a avaliar a influência da velocidade de avanço do navio no espectro dos movimentos verticais do mesmo. O percurso de entrada do “N/M Fernão Gomes” no porto da Praia da Vitória foi o caso de estudo considerado. A agitação marítima incidente no navio cobriu o período de Janeiro de 2009 a Dezembro de 2010 e foi obtida com base no modelo previsão de escala regional (WAVEWATCH III) e posteriormente transferida para o interior do porto com o recurso a modelos numéricos de propagação de ondas (SWAN e DREAMS). Foi também assumido que a altura do movimento vertical do navio segue uma distribuição de Rayleigh, a qual possibilita a determinação da altura significativa desse movimento vertical, bem como a implementação de um procedimento para determinar a probabilidade de a altura do movimento vertical do navio não exceder um limiar pré-definido e consequentemente mostrar, através da análise dos resultados, a influência da velocidade de avanço do navio. Da análise dos resultados concluiu-se que a velocidade tem uma influência significativa nos resultados. No final avaliou-se a contribuição dos resultados anteriormente determinados, para a análise do risco associado aos movimentos verticais do navio quando em manobra no porto em estudo.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A presente dissertação tem como objectivo principal aprofundar os conhecimentos sobre a incorporação de fibras em misturas betuminosas, em particular, sobre as misturas do tipo Stone Mastic Asphalt (SMA). Para este tipo de mistura betuminosa existe uma norma de produto europeia, a EN 13108-5:2006. Os ensaios tipo iniciais para efeitos de certificação CE das misturas estão contemplados na norma portuguesa NP EN 13108-20:2008, onde também são estipuladas as condições de ensaio. São descritos diversos tipos de fibras passíveis de serem utilizadas no fabrico da mistura betuminosa do tipo SMA, dando especial enfoque às misturas fabricadas com fibras celulósicas, uma vez que este tipo específico de mistura é frequentemente aplicado em camada de desgaste noutros países, com reconhecidas vantagens em termos de durabilidade e desempenho do pavimento. As misturas do tipo SMA são descritas, analisando-se métodos de formulação e métodos para a sua caracterização. Posteriormente, são apresentados e discutidos os trabalhos experimentais levados a cabo para um caso concreto. Os ensaios realizados permitiram caracterizar a mistura quanto à sensibilidade à água, ao seu módulo de rigidez e resistência à deformação permanente. Conclui-se que a mistura do tipo SMA com a incorporação de fibras analisada, apresenta bom comportamento à deformação permanente e boa resistência á acção da água, comparativamente às misturas betuminosas tradicionais aplicadas em camada de desgaste.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Este trabalho final de mestrado baseou-se no acompanhamento da construção do hotel SANA Amoreiras, situado na Avenida Duarte Pacheco nº 12. O empreiteiro geral foi a empresa FDO Construções. Existindo também uma equipa de fiscalização, LMSA, contratada pelo Dono de Obra de forma a efectuar todo o controlo de qualidade. O TFM baseou-se no estágio efectuado para o Dono de obra do hotel onde fui devidamente acompanhada por uma engenheira, orientadora de estágio, que acompanhou de perto o desempenho da minha actividade. Esta função teve como objectivos a gestão de projecto de hotel, interligação entre projectistas e empreiteiro geral, bem prestar o devido acompanhamento de todos trabalhos a realizar. Acompanhei a realização de dois quartos modelo onde o objectivo do Dono de Obra foi testar as diversas soluções ao nível de revestimentos, sanitários, iluminação, mobiliário, decoração e outras soluções de arquitectura, soluções estas a implementar no hotel. Acompanhei também a realização de reuniões de compatibilização e coordenação de todos os projectos de especialidades com o projecto de arquitectura, nomeadamente Avac, Instalações eléctricas, Comunicações, Segurança, Águas, Esgotos, Gás, Incêndio, Cozinhas de forma a ser possível efectuar consultas aos empreiteiros e adjudicar todas estas empreitadas. Foi efectuada uma abordagem à descrição do hotel, suas características, indicação das razões que levaram à sua construção e descrição das várias empreitadas de construção realizadas até então, tal como, demolição, escavação, estrutura, acabamentos e especialidades.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Com a crescente divulgação no mercado português de métodos construtivos de alvenaria resistente tipo Termoargila, compara-se neste trabalho a sua rentabilidade económica, em relação à execução em betão armado, com paredes não estruturais de alvenaria. Estudam-se três tipologias de estruturas com geometria regular (1 piso, 2 pisos, 4 pisos), em zonas sísmicas A e D segundo o Regulamento de Segurança e Acções. A análise dos resultados permite verificar a eficiência dos métodos construtivos para cada tipologia de edifício, assim como os seus custos. Analisa-se se o motivo pelo qual em Portugal não é corrente a aplicação de soluções estruturais de alvenaria resistente tipo Termoargila, se unicamente económico ou se existe uma inércia dos intervenientes na construção, privilegiando os métodos construtivos tradicionais.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Nos dias que correm questões ambientais e considerações energéticas obrigam a uma inovação constante na procura de soluções de baixo consumo energético e de impacto ambiental baixo, nomeadamente no que diz respeito aos sistemas de climatização e refrigeração. Têm vindo a ser criadas medidas, tanto a nível internacional como nacional, no sentido de reduzir as emissões nocivas para a atmosfera, consequência do excessivo consumo de combustíveis fósseis, e do aumento da rentabilidade da energia e maior utilização de energias renováveis. O presente estudo de dimensionamento de um sistema de absorção, a brometo de lítio/água, com coletores solares, tem por base o sistema de compressão existente num edifício de serviços no centro de Lisboa. Foi efetuada uma analise simplificada dos seus dados de consumo energético, de maneira a verificar a viabilidade económica da substituição do equipamento existente e instalação de um sistema de coletores solares. Concluiu-se que a substituição do equipamento e a instalação de coletores solar, não é atrativa do ponto de vista económico, nesta solução em particular. Contudo, verifica-se uma considerável redução do impacto ambiental do consumo energético do edifício.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Mestrado em Tecnologia de Diagnóstico e Intervenção Cardiovascular - Área de especialização: Ultrassonografia Cardiovascular.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The development of accurate mass spectrometry, enabling the identification of all the ions extracted from the ion source in a high current implanter is described. The spectrometry system uses two signals (x-y graphic), one proportional to the magnetic field (x-axes), taken from the high-voltage potential with an optic fiber system, and the other proportional to the beam current intensity (y-axes), taken from a beam-stop. The ion beam mass register in a mass spectrum of all the elements magnetically analyzed with the same radius and defined by a pair of analyzing slits as a function of their beam intensity is presented. The developed system uses a PC to control the displaying of the extracted beam mass spectrum, and also recording of all data acquired for posterior analysis. The operator uses a LabView code that enables the interfacing between an I/O board and the ion implanter. The experimental results from an ion implantation experiment are shown. (C) 2011 Elsevier B.V. All rights reserved.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Dissertação de Mestrado em Supervisão em Educação, enquadrada na linha de investigação sobre Desenvolvimento Profissional dos Professores, apresentada à Escola Superior de Educação de Lisboa