10 resultados para Project 2002-005-C : Decision Support Tools for Concrete Infrastructure rehabilitation

em Repositório Científico do Instituto Politécnico de Lisboa - Portugal


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper, a mixed-integer nonlinear approach is proposed to support decision-making for a hydro power producer, considering a head-dependent hydro chain. The aim is to maximize the profit of the hydro power producer from selling energy into the electric market. As a new contribution to earlier studies, a risk aversion criterion is taken into account, as well as head-dependency. The volatility of the expected profit is limited through the conditional value-at-risk (CVaR). The proposed approach has been applied successfully to solve a case study based on one of the main Portuguese cascaded hydro systems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

O trabalho que a seguir se apresenta tem como objectivo descrever a criao de um modelo que sirva de suporte a um sistema de apoio deciso sobre o risco inerente execuo de projectos na rea das Tecnologias de Informao (TI) recorrendo a tcnicas de minerao de dados. Durante o ciclo de vida de um projecto, existem inmeros factores que contribuem para o seu sucesso ou insucesso. A responsabilidade de monitorizar, antever e mitigar esses factores recai sobre o Gestor de Projecto. A gesto de projectos uma tarefa difcil e dispendiosa, consome muitos recursos, depende de numerosas variveis e, muitas vezes, at da prpria experincia do Gestor de Projecto. Ao ser confrontado com as previses de durao e de esforo para a execuo de uma determinada tarefa, o Gestor de Projecto, exceptuando a sua percepo e intuio pessoal, no tem um modo objectivo de medir a plausibilidade dos valores que lhe so apresentados pelo eventual executor da tarefa. As referidas previses so fundamentais para a organizao, pois sobre elas so tomadas as decises de planeamento global estratgico corporativo, de execuo, de adiamento, de cancelamento, de adjudicao, de renegociao de mbito, de adjudicao externa, entre outros. Esta propenso para o desvio, quando detectada numa fase inicial, pode ajudar a gerir melhor o risco associado Gesto de Projectos. O sucesso de cada projecto terminado foi qualificado tendo em conta a ponderao de trs factores: o desvio ao oramentado, o desvio ao planeado e o desvio ao especificado. Analisando os projectos decorridos, e correlacionando alguns dos seus atributos com o seu grau de sucesso o modelo classifica, qualitativamente, um novo projecto quanto ao seu risco. Neste contexto o risco representa o grau de afastamento do projecto ao sucesso. Recorrendo a algoritmos de minerao de dados, tais como, rvores de classificao e redes neuronais, descreve-se o desenvolvimento de um modelo que suporta um sistema de apoio deciso baseado na classificao de novos projectos. Os modelos so o resultado de um extensivo conjunto de testes de validao onde se procuram e refinam os indicadores que melhor caracterizam os atributos de um projecto e que mais influenciam o risco. Como suporte tecnolgico para o desenvolvimento e teste foi utilizada a ferramenta Weka 3. Uma boa utilizao do modelo proposto possibilitar a criao de planos de contingncia mais detalhados e uma gesto mais prxima para projectos que apresentem uma maior propenso para o risco. Assim, o resultado final pretende constituir mais uma ferramenta disposio do Gestor de Projecto.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obteno do grau de Mestre em Engenharia Qumica e Biolgica

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Within a large set of renewable energies being explored to tackle energy sourcing problems, bioenergy can represent an attractive solution if effectively managed. The supply chain design supported by mathematical programming can be used as a decision support tool to the successful bioenergy production systems establishment. This strategic decision problem is addressed in this paper where we intent to study the design of the residual forestry biomass to bioelectricity production in the Portuguese context. In order to contribute to attain better solutions a mixed integer linear programming (MILP) model is developed and applied in order to optimize the design and planning of the bioenergy supply chain. While minimizing the total supply chain cost the production energy facilities capacity and location are defined. The model also includes the optimal selection of biomass amounts and sources, the transportation modes selection, and links that must be established for biomass transportation and products delivers to markets. Results illustrate the positive contribution of the mathematical programming approach to achieve viable economic solutions. Sensitivity analysis on the most uncertain parameters was performed: biomass availability, transportation costs, fixed operating costs and investment costs. (C) 2015 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

O presente documento enquadra-se no mbito do trabalho final do mestrado (TFM) do curso de Engenharia Civil, na rea de especializao de Hidrulica, do Instituto Superior de Engenharia de Lisboa, sob a forma de um projeto na fase de estudo prvio com o ttulo Gesto Sustentvel da gua no empreendimento turstico Parque de Campismo da Ilha do Pessegueiro situado em Porto Covo - Regio de Turismo do Alentejo. Este trabalho constitudo essencialmente por 5 partes. Sendo a primeira uma breve introduo s questes a abordar, a segunda corresponde discrio terica do uso eficiente da gua baseando-se no PNEUA (Programa nacional para o uso eficiente da gua). J a terceira parte relativa ao atual sistema de utilizao da gua no Parque de campismo da ilha do pessegueiro (PCIP), sendo a quarta o estudo do desenvolvimento do projecto para a gesto eficiente da gua no empreendimento e a quinta parte o estudo de viabilidade econmica e financeira a implementar no projecto. Para alm da implementao de medidas de poupana so tambm objetivos principais deste trabalho a reutilizao da gua atravs da recolha, o tratamento e armazenamento das guas residuais e aproveitamento das guas pluviais para posterior abastecimento do sistema de utilizao em descargas sanitrias, lavagem de pavimentos e regas de espaos verdes. So, portanto, trs os subsistemas de gesto eficiente da gua que se pretende implementar. D-se importncia ao estudo de viabilidade econmica do projeto, cujo perodo de retorno do capital investido em capitais prprios e alheios de seis anos. Este projeto pretende dar apoio tcnico ao uso eficiente da gua no PCIP, de forma a conseguir por um lado obter vantagens econmicas e por outro proteger o ambiente. As vantagens econmicas so interessantes para orientar os recursos financeiros para outros investimentos e as questes ambientais so a base de uma campanha, j em curso, para obteno de certificao energtica, em conjunto com outras prticas j em curso, nomeadamente a recolha seletiva de resduos slidos para recircular e aproveitamento de energia solar.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dissertao Final de Mestrado para obteno do grau de Mestre em Engenharia Mecnica no perfil de Manuteno e Produo

Relevância:

100.00% 100.00%

Publicador:

Resumo:

One of the goals in the field of Music Information Retrieval is to obtain a measure of similarity between two musical recordings. Such a measure is at the core of automatic classification, query, and retrieval systems, which have become a necessity due to the ever increasing availability and size of musical databases. This paper proposes a method for calculating a similarity distance between two music signals. The method extracts a set of features from the audio recordings, models the features, and determines the distance between models. While further work is needed, preliminary results show that the proposed method has the potential to be used as a similarity measure for musical signals.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dissertao para obteno do grau de Mestre em Engenharia Electrotcnica na rea de Especializao de Energia

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para a obteno do grau de Mestre em Engenharia Civil na rea de Especializao de Estruturas

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dissertao para obteno do grau de Mestre em Engenharia Civil na rea de Especializao em Vias de Comunicao e Transportes