387 resultados para Civil engineering work
em Queensland University of Technology - ePrints Archive
Resumo:
Fibre composite structures have become the most attractive candidate for civil engineering applications. Fibre reinforced plastic polymer (FRP) composite materials have been used in the rehabilitation and replacement of the old degrading traditional structures or build new structures. However, the lack of design standards for civil infrastructure limits their structural applications. The majority of the existing applications have been designed based on the research and guidelines provided by the fibre composite manufacturers or based on the designer’s experience. It has been a tendency that the final structure is generally over-designed. This paper provides a review on the available studies related to the design optimization of fibre composite structures used in civil engineering such as; plate, beam, box beam, sandwich panel, bridge girder, and bridge deck. Various optimization methods are presented and compared. In addition, the importance of using the appropriate optimization technique is discussed. An improved methodology, which considering experimental testing, numerical modelling, and design constrains, is proposed in the paper for design optimization of composite structures.
Resumo:
Many of the teaching elements in Civil and Environmental Engineering and Spatial Science/Surveying are strongly related to multidisciplinary real-world situations. Professionals in each discipline commonly work collaboratively, knowing each other’s professional and technical limitations and requirements. Replication of such real-world situations allows students to gain an insight and acquire knowledge of professional practice for both civil engineering and spatial science disciplines. However, replication of an authentic design project is not always possible in a single unit basis where empirical project situations are often created with controlled sets of constraints, inputs and outputs. A cross-disciplinary design-based project that is designed to promote active student learning, engagement and professional integration would be the preferred option. The central aim of this collaborative project was to create positive and inclusive environments to promote engaging learning opportunities that cater for a range of learning styles with a two-way linkage involving third-year civil engineering and spatial science (surveying) students. This paper describes the cross-disciplinary project developed and delivered in 2010 and 2011. A survey was conducted at completion of the project to assess the degree of improvement in student engagement and their learning experiences. Improvements were assessed in a range of dimensions including student motivation, learning by cross-disciplinary collaboration and learning by authentic design project experiences. In this specific cross-disciplinary linkage project, the study findings showed that teaching approaches utilised have been effective in promoting active student learning and increasing engagement.
Resumo:
Faculty and reference librarians at the Queensland University of Technology have collaborated in an attempt to improve the quality of literature reviews in civil engineering final -year research projects. This article describes the instructional program devised and the level of faculty support for the librarians' contribution, and presents survey results revealing how students could most benefit from BI and how the classroom collaboration affected student project work. The authors offer some observations about the possible impact of 81 in general, and on engineers in particular, which may provide a focus for future research.
Resumo:
Problem solving is an essential element of civil engineering education. It has been observed that students are best able to understand civil engineering theory when there is a practical application of it. Teaching theory alone has led to lower levels of comprehension and motivation and a correspondingly higher rate of failure and “drop-out”. This paper analyses the effectiveness of introducing practical design projects at an early stage within a civil engineering undergraduate program at Queensland University of Technology. In two of the essential basic subjects, Engineering Mechanics and Steel Structures, model projects which simulate realistic engineering exercises were introduced. Students were required to work in small groups to analyse, design and build the lightest / most efficient model bridges made of specific materials such as spaghetti, drinking straw, paddle pop sticks and balsa wood and steel columns for a given design loading/target capacity. The paper traces the success of the teaching strategy at each stage from its introduction through to the final student and staff evaluation.
Resumo:
Many studies into construction procurement methods reveal evidence of a need to change the culture and attitude in the construction industry, transition from traditional adversarial relationships to cooperative and collaborative relationships. At the same time there is also increasing concern and discussion on alternative procurement methods, involving a movement away from traditional procurement systems. Relational contracting approaches, such as partnering and relationship management, are business strategies that align the objectives of clients, commercial participants and stakeholders. It provides a collaborative environment and a framework for all participants to adapt their behaviour to project objectives and allows for engagement of those subcontractors and suppliers down the supply chain. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a history of slow implementation of relational contracting down the supply chain. Furthermore, there exists little research on relationship management conducted in the supply chain context. This research aims to explore the association between relational contracting structures and processes and supply chain sustainability in the civil engineering construction industry. It endeavours to shed light on the practices and prerequisites for relationship management implementation success and for supply sustainability to develop. The research methodology is a triangulated approach based on Cheung.s (2006) earlier research where questionnaire survey, interviews and case studies were conducted. This new research includes a face-to-face questionnaire survey that was carried out with 100 professionals from 27 contracting organisations in Queensland from June 2008 to January 2009. A follow-up survey sub-questionnaire, further examining project participants. perspectives was sent to another group of professionals (as identified in the main questionnaire survey). Statistical analysis including multiple regression, correlation, principal component factor analysis and analysis of variance were used to identify the underlying dimensions and test the relationships among variables. Interviews and case studies were conducted to assist in providing a deeper understanding as well as explaining findings of the quantitative study. The qualitative approaches also gave the opportunity to critique and validate the research findings. This research presents the implementation of relationship management from the contractor.s perspective. Findings show that the adaption of relational contracting approach in the supply chain is found to be limited; contractors still prefer to keep the suppliers and subcontractors at arm.s length. This research shows that the degree of match and mismatch between organisational structuring and organisational process has an impact on staff.s commitment level and performance effectiveness. Key issues affecting performance effectiveness and relationship effectiveness include total influence between parties, access to information, personal acquaintance, communication process, risk identification, timely problem solving and commercial framework. Findings also indicate that alliance and Early Contractor Involvement (ECI) projects achieve higher performance effectiveness at both short-term and long-term levels compared to projects with either no or partial relationship management adopted.
Resumo:
An alternative learning approach for destructive testing of structural specimens in civil engineering is explored by using a remote laboratory experimentation method. The remote laboratory approach focuses on overcoming the constraints in the hands-on experimentation without compromising the understanding of the students on the concepts and mechanics of reinforced concrete structures. The goal of this study is to evaluate whether or not the remote laboratory experimentation approach can become a standard in civil engineering teaching. The teaching activity using remote-laboratory experimentation is presented here and the outcomes of this activity are outlined. The experience and feedback gathered from this study are used to improve the remote-laboratory experimentation approach in future years to other aspects of civil engineering where destructive testing is essential.
Resumo:
The umbrella of Australian research higher degree (RHD) offerings has broadened from the traditional MPhil/PhD programmes to include a range of professional masters and doctoral degrees. This article reports on the experiences of three PhD students, engaged in an informally managed industry partnered research programme, described in this article as the work integrated research higher degree (WIRHD). Their learning process shares the attributes from both the traditional PhD programme and professional doctorates. However, because of the blended nature of the learning contexts, candidates engaged in the WIRHD programme must address a wider range of issues than those following the traditional RHD pathway. An exploratory case study approach was adopted with the view to develop an integrative framework to explain the various contexts that influence the learning experience of WIRHD candidates, as well as a structured approach to guide this contemporary form of industry partnered WIRHD process.
Resumo:
The purpose of this study is to understand the constructs of work motivation in project-based organizations. We first juxtapose work motivation in traditional and project-based organizations to put forward an operational definition of work motivation for our study. We then present the research methodology where we profile work motivation as perceived by project workers using principal component analysis. We obtain a five factor structure of work motivation. Finally, we discuss these results by putting them within the project management perspective and suggest managerial implications.
Resumo:
The purpose of this paper is to suggest a framework to study the influence of 'Work motivation' on 'Project success' from a team members' perspective. Results from a literature review of 1345 articles on ' Project success' and 1063 articles of 'Work motivation' appearing in peer-reviewed journals between 1985 and 2005 are presented. We then propose a framework to study the impact of 'Work motivation' on 'Project success' by incorporating the key constructs pertaining to these variables derived from the literature review.
Resumo:
The purpose of this study is to understand the constructs of work motivation in project—based organizations. We first juxtapose work motivation in traditional and project—based organizations to put forward an operational definition of work motivation for our study. We then present the research methodology where we profile work motivation as perceived by project workers using principal component analysis. We obtain a five factor structure of work motivation. Finally, we discuss these results by putting them within the project management perspective and suggest managerial implications.
Resumo:
The content and context of work significantly influences an employees’ satisfaction. While managers see work motivation as a tool to engage the employees so that they perform better, academicians value work motivation for its contribution to human behaviour. Though the relationship between employee motivation and project success has been extensively covered in the literature, more research focusing on the nature of job design on project success may have been wanting. We address this gap through this study. The present study contributes to the extant literature by suggesting an operational framework of work motivation for project—based organizations. We are also advancing the conceptual understanding of this variable by understanding how the different facets of work motivation have a differing impact of the various parameters of project performance. A survey instrument using standardized scales of work motivation and project success was used. 199 project workers from various industries completed the survey. We first ‘operationalized’ the definition of work motivation for the purpose of our study through a principal component analysis of work motivation items. We obtained a five factor structure that had items pertaining to employee development, work climate, goal clarity, and job security. We then performed a Pearson’s correlation analysis which revealed moderate to significant relationship between project outcomes ad work climate; project outcomes & employee development. In order to establish a causality between work motivation and project management success, we employed linear regression analysis. The results show that work climate is a significant predictor of client satisfaction, while it moderately influences the project quality. Further, bringing in objectivity to project work is important for a successful implementation.
Resumo:
The purpose of this paper is to present a theoretical framework to investigate the relationship between work motivation, organizational commitment, and professional commitment in temporary organizations. Through a review of theory, we contend that work motivation has two major patterns- internal motivation (that includes intrinsic, need-based, and self-deterministic theories), and external motivation (that includes cognitive or process-based theories of motivation) through which it has been investigated. We also subsume the nature of employee commitment to be of three types- affective, continuance, and normative. This commitment may either be towards organization or profession. A literature review reveals that the characteristics of the temporary organization - specifically tenure, and task - regulate the relationship between work motivation, and organizational commitment, and professional commitment. Relevant propositions are presented.
The use of virtual prototyping to rehearse the sequence of construction work involving mobile cranes
Resumo:
Purpose – Rehearsing practical site operations is without doubt one of the most effective methods for minimising planning mistakes, because of the learning that takes place during the rehearsal activity. However, real rehearsal is not a practical solution for on-site construction activities, as it not only involves a considerable amount of cost but can also have adverse environmental implications. One approach to overcoming this is by the use of virtual rehearsals. The purpose of this paper is to investigate an approach to simulation of the motion of cranes in order to test the feasibility of associated construction sequencing and generate construction schedules for review and visualisation. Design/methodology/approach – The paper describes a system involving two technologies, virtual prototyping (VP) and four-dimensional (4D) simulation, to assist construction planners in testing the sequence of construction activities when mobile cranes are involved. The system consists of five modules, comprising input, database, equipment, process and output, and is capable of detecting potential collisions. A real-world trial is described in which the system was tested and validated. Findings – Feedback from the planners involved in the trial indicated that they found the system to be useful in its present form and that they would welcome its further development into a fully automated platform for validating construction sequencing decisions. Research limitations/implications – The tool has the potential to provide a cost-effective means of improving construction planning. However, it is limited at present to the specific case of crane movement under special consideration. Originality/value – This paper presents a large-scale, real life case of applying VP technology in planning construction processes and activities.