601 resultados para Building plan
em Queensland University of Technology - ePrints Archive
Optimum position of steel outrigger system for high rise composite buildings subjected to wind loads
Resumo:
The responses of composite buildings under wind loads clearly become more critical as the building becomes taller, less stiff and more lightweight. When the composite building increases in height, the stiffness of the structure becomes more important factor and introduction to belt truss and outrigger system is often used to provide sufficient lateral stiffness to the structure. Most of the research works to date is limited to reinforced concrete building with outrigger system of concrete structure, simple building plan layout, single height of a building, one direction wind and single level of outrigger arrangement. There is a scarcity in research works about the effective position of outrigger level on composite buildings under lateral wind loadings when the building plan layout, height and outrigger arrangement are varied. The aim of this paper is to determine the optimum location of steel belt and outrigger systems by using different arrangement of single and double level outrigger for different size, shape and height of composite building. In this study a comprehensive finite element modelling of composite building prototypes is carried out, with three different layouts (Rectangular, Octagonal and L shaped) and for three different storey (28, 42 and 57-storey). Models are analysed for dynamic cyclonic wind loads with various combination of steel belt and outrigger bracings. It is concluded that the effectiveness of the single and double level steel belt and outrigger bracing are varied based on their positions for different size, shape and height of composite building.
Resumo:
Poor air quality has a huge detrimental effect, both economic and on the quality of life, in Australia. Transit oriented design (TOD), which aims to minimise urban sprawl and lower dependency on vehicles, leads to an increasing number of buildings close to transport corridors. This project aims at providing guidelines that are appropriate to include within City Plan to inform future planning along road corridors, and provide recommendations on when mitigation measures should be utilised.
Resumo:
Objectives: The Nurse Researcher Project (NRP) was initiated to support development of a nursing research and evidence based practice culture in Cancer Care Services (CCS) in a large tertiary hospital in Australia. The position was established and evaluated to inform future directions in the organisation.---------- Background: The demand for quality cancer care has been expanding over the past decades. Nurses are well placed to make an impact on improving health outcomes of people affected by cancer. At the same time, there is a robust body of literature documenting the barriers to undertaking and utilising research by and for nurses and nursing. A number of strategies have been implemented to address these barriers including a range of staff researcher positions but there is scant attention to evaluating the outcomes of these strategies. The role of nurse researcher has been documented in the literature with the aim to provide support to nurses in the clinical setting. There is, to date, little information in relation to the design, implementation and evaluation of this role.---------- Design: The Donabedian’s model of program evaluation was used to implement and evaluate this initiative.---------- Methods: The ‘NRP’ outlined the steps needed to implement the nurse researcher role in a clinical setting. The steps involved the design of the role, planning for the support system for the role, and evaluation of outcomes of the role over two years.---------- Discussion: This paper proposes an innovative and feasible model to support clinical nursing research which would be relevant to a range of service areas.---------- Conclusion: Nurse researchers are able to play a crucial role in advancing nursing knowledge and facilitating evidence based practice, especially when placed to support a specialised team of nurses at a service level. This role can be implemented through appropriate planning of the position, building a support system and incorporating an evaluation plan.
Resumo:
Office building retrofit projects face many challenges for on-site waste management. While the projects themselves have the potential for a significant level of reuse and recycling from decon-struction and demolition, their unique characteristics often prohibit direct application of existing waste management systems, which are typically based on managing waste generated through new material application in new build projects. Moreover, current waste management plans include no stimuli to involve Small and Medium Enterprises (SMEs) for on-site waste management. As SMEs carry out the majority of on-site work as subcontractors, their active involvements will result in more proactive approaches to waste management and enhance project delivery. This paper discusses the interim results of a continuing research aimed at engaging SMEs in the planning processes of waste management through the collaboration between subcontractors and main contractors of retrofitting projects. It introduces a conceptual model for SMEs to proactively plan and manage on-site waste generation for both deconstruction and construction stages, before traditional waste management plans by the main contractor come into place. The model also suggests a collaboration process between SMEs as subcontractors and large companies as the main contractor to improve the involvement and performance of SMEs in waste management of office building retrofit projects.
Resumo:
Waste management and minimisation is considered to be an important issue for achieving sustainability in the construction industry. Retrofit projects generate less waste than demolitions and new builds, but they possess unique features and require waste management approaches that are different to traditional new builds. With the increasing demand for more energy efficient and environmentally sustainable office spaces, the office building retrofit market is growing in capital cities around Australia with a high level of refurbishment needed for existing aging properties. Restricted site space and uncertain delivery process in these projects make it a major challenge to manage waste effectively. The labour-intensive nature of retrofit projects creates the need for the involvement of small and medium enterprises (SMEs) as subcontractors in on-site works. SMEs are familiar with on-site waste generation but are not as actively motivated and engaged in waste management activities as the stakeholders in other construction projects in the industry. SMEs’ responsibilities for waste management in office building retrofit projects need to be identified and adapted to the work delivery processes and the waste management system supported by project stakeholders. The existing literature provides an understanding of how to manage construction waste that is already generated and how to increase the waste recovery rate for office building retrofit projects. However, previous research has not developed theories or practical solutions that can guide project stakeholders to understand the specific waste generation process and effectively plan for and manage waste in ongoing project works. No appropriate method has been established for the potential role and capability of SMEs to manage and minimise waste from their subcontracting works. This research probes into the characteristics of office building retrofit project delivery with the aim to develop specific tools to manage waste and incorporate SMEs in this process in an appropriate and effective way. Based on an extensive literature review, the research firstly developed a questionnaire survey to identify the critical factors of on-site waste generation in office building retrofit projects. Semi-structured interviews were then utilised to validate the critical waste factors and establish the interrelationships between the factors. The interviews served another important function of identifying the current problems of waste management in the industry and the performance of SMEs in this area. Interviewees’ opinions on remedies to the problems were also collected. On the foundation of the findings from the questionnaire survey and semi-structured interviews, two waste planning and management strategies were identified for the dismantling phase and fit-out phase of office building retrofit projects, respectively. Two models were then established to organize SMEs’ waste management activities, including a work process-based integrated waste planning model for the dismantling phase and a system dynamics model for the fit-out phase. In order to apply the models in real practice, procedures were developed to guide SMEs’ work flow in on-site waste planning and management. In addition, a collaboration framework was established for SMEs and other project stakeholders for effective waste planning and management. Furthermore, an organisational engagement strategy was developed to improve SME waste management practices. Three case studies were conducted to validate and finalise the research deliverables. This research extends the current literature that mostly covers waste management plans in new build projects, by presenting the knowledge and understanding of addressing waste problems in retrofit projects. It provides practical tools and guidance for industry practitioners to effectively manage the waste generation processes in office building retrofit projects. It can also promote industry-level recognition of the role of SMEs and their performance in on-site waste management.
Resumo:
The construction industry has an obligation to respond to sustainability expectations of our society. Solutions that integrate innovative, intelligent and sustainability deliverables are vital for us to meet new and emerging challenges. Industrialised Building Systems (IBS), or known otherwise as prefabrication, employs a combination of ready-made components in the construction of buildings. They promote quality of production, enhance simplification of construction processes and minimise waste. The unique characteristics of this construction method respond well to sustainability. Despite the promises however, IBS has yet to be effectively implemented in Malaysia. There are often misconceptions among key stakeholders about IBS applications. The existing rating schemes fail to assess IBS against sustainability measures. To ensure the capture of full sustainability potential in buildings developed, the critical factors and action plans agreeable to all participants in the development processes need to be identified. Through questionnaire survey, eighteen critical factors relevant to IBS sustainability were identified and encapsulated into a conceptual framework to coordinate a systematic IBS decision making approach. Five categories were used to separate the critical factors into: ecological performance; economic value; social equity and culture; technical quality; and implementation and enforcement. This categorisation extends the "Triple Bottom Lines" to include social, economic, environmental and institutional dimensions. Semi-structured interviews help identify strategies of actions and solutions of potential problems through a SWOT analysis framework. These tools help the decision-makers maximise the opportunities by using available strengths, avoid weaknesses, and diagnose possible threats in the examined issues. The recommendations formed an integrated action plan to present information on what and how to improve sustainability through tackling each critical factor during IBS development. It can be used as part of the project briefing documents for IBS designers. For validation and finalisation the research deliverables, three case studies were conducted. The research fills a current gap by responding to IBS project scenarios in developing countries. It also provides a balanced view for designers to better understand sustainability potential and prioritize attentions to manage sustainability issues in IBS applications.
Resumo:
This study presents the largest-known, investigation on discomfort glare with 493 surveys collected from five green buildings in Brisbane, Australia. The study was conducted on full-time employees, working under their everyday lighting conditions, all of whom had no affiliation with the research institution. The survey consisted of a specially tailored questionnaire to assess potential factors relating to discomfort glare. Luminance maps extracted from high dynamic range (HDR) images were used to capture the luminous environment of the occupants. Occupants who experienced glare on their monitor and/or electric glare were excluded from analysis leaving 419 available surveys. Occupants were more sensitive to glare than any of the tested indices accounted for. A new index, the UGP was developed to take into account the scope of results in the investigation. The index is based on a linear transformation of the UGR to calculate a probability of disturbed persons. However all glare indices had some correlation to discomfort, and statistically there was no difference between the DGI, UGR and CGI. The UGP broadly reflects the demographics of the working population in Australia and the new index is applicable to open plan green buildings.
Resumo:
The number of office building retrofit projects is increasing. These projects are characterised by processes which have a close relationship with waste generation and therefore demand a high level of waste management. In a preliminary study reported separately, we identified seven critical factors of on-site waste generation in office building retrofit projects. Through semi-structured interviews and Interpretive Structural Modelling, this research further investigated the interrelationships among these critical waste factors, to identify each factor’s level of influence on waste generation and propose effective solutions for waste minimization. “Organizational commitment” was identified as the fundamental issue for waste generation in the ISM system. Factors related to plan, design and construction processes were found to be located in the middle levels of the ISM model but still had significant impacts on the system as a whole. Based on the interview findings and ISM analysis results, some practical solutions were proposed for waste minimization in building retrofit projects: (1) reusable and adaptable fit-out design; (2) a system for as-built drawings and building information; (3) integrated planning for retrofitting work process and waste management; and (4) waste benchmarking development for retrofit projects. This research will provide a better understanding of waste issues associated with building retrofit projects and facilitate enhanced waste minimization.
Resumo:
Increasingly, the library and information science (LIS) practitioner is being challenged to incorporate research into the context of their professional work. This paper reports on the Researcher-Librarian Partnership, a research-mentoring program that was initiated by the International Federation of the Library Association and Institutions. Six new LIS practitioners within their first seven years of professional practice took part in the program. Each was partnered with an experienced LIS researcher who provided mentoring and support. During the 12-month program the new professionals designed and implemented a research project on a topic of interest. This paper outlines the details of the program providing observations on how research mentoring can be a powerful way to ensure all stakeholders – practitioners, educators and professional associations – can plan an active role in supporting the development of a research culture within the profession.
Resumo:
The Land Sales Act 1984 regulates “off the plan” sales in Queensland in conjunction with several provisions in the Body Corporate and Community Management Act 1997. Together the Acts regulate sales in both unit developments and housing estates. From 2010 to 2013 the Queensland Government undertook a comprehensive review of the Land Sales Act 1984 to identify opportunities to modernise and improve the legislation. Significant changes were recommended by the Review to align the Land Sales Act 1984 (LSA) with current surveying and conveyancing practice and to overcome a number of practical issues faced by developers under the current legislation. A significant outcome of the review is the removal of provisions related to off the plan community title sales from the LSA to the Body Corporate and Community Management Act 1997 (BCCMA) and the Building Units and Group Titles Act 1980 (BUGTA). This article examines the Land Sales and Other Legislation Amendment Act 2014 due to commence in November 2014.
Resumo:
IUCN´s core work involves generating knowledge and tools to influence policy and practice for nature conservation. Whilst it appears that we are collectively making progress in some areas, we acknowledge the need to improve our communication processes and practices to ´move to action´ in this regard. We need to extend the influence of the science and the knowledge beyond the documents to achieve effective impact and action. The training course will focus on the process of getting the conservation messages out to a wider audience. This interactive and participatory training course will develop the skills and knowledge needed to communicate effective conservation messages for a range of IUCN internal and external audiences. The course will cover: • what is communication for conservation? • the communication planning process (developing your communication objectives) • identifying and understanding your target audiences • developing your conservation message • choosing your communication media and • evaluating the effectiveness of your communication strategies. A unique feature of the training course will be the use of Web 2.0 tools in innovative conservation communications e.g. use of social media in concept branding and social marketing. In the spirit of the Forum´s objective of ´Sharing know how´, each participant will bring a current conservation issue to the training course and will leave with their own communication plan. Potentially, the training course adopts a cross-thematic approach as the issues addressed could be drawn from any of the IUCN´s program themes. Primarily though, the training course´s best fit is with the ´Valuing and Conserving Biodiversity´ theme since it will provide concrete and pragmatic solutions to enhancing the implementation of conservation measures through participatory planning and capacity building.
Resumo:
The Augo Wetland Forest Park, along with other conservation areas around the world, provides an opportunity for a personal connection with the natural world - an opportunity for creating ways to convince people to reverse the degradation of the planet. In this presentation I use the settings approach, as used by the World Health Organisation in health promotion, as a framework. The WHO’s 1986 Ottawa Charter states that "Health is created and lived by people within the settings of their everyday life; where they learn, work, play, and love." I argue that, similarly, a conservation area provides a setting for people to connect with environmental issues and can be the place where positive behaviours and actions for the environment are created and enacted. In a wired and virtual world, such settings may be the only opportunity some people, especially children, get to connect with the environment. An evidence-based, intentionally designed and implemented environmental education program enhances the opportunities for the personal connection and subsequent action. Planning and implementing an Environmental education program for a conservation area requires an understanding of the principles of three domains: • Environmental Communication • Environmental Education • Environmental Interpretation In this presentation I define these domains and demonstrate how they become interdependent within the context of a particular setting such as a conservation area. I outline the principles of each domain and demonstrate how they can be enacted with reference to environmental education program case studies from settings in Australia and Borneo. The first case study is based around a proposal for a planned residential community at Eden’s Crossing, in Brisbane’s high growth Western corridor. The setting featured a number of important natural and heritage conservation characteristics and the developer wanted to be pro-active in informing the market what this development aims to achieve in terms of innovative community and environmental objectives. By designing an education and interpretation program in line with best practice education and interpretation principles the developers would be assisted in their efforts to build community, preserve heritage, and facilitate environmentally sensitive lifestyles for the future residents of Eden’s Crossing. Above all, the strategy focused on advancing sustainability in a way that made the Eden’s Crossing greenfield development significantly greener. It did this by interacting with prospective purchasers, and building knowledge about sustainability with a view to shaping the future community of Eden’s Crossing in terms of attitudes and behaviours. The second case study is based around the development of the Rainforest Interpretation Centre (RIC), now renamed the Rainforest Discovery Centre, an environmental education facility managed by the Sabah Forestry Department (SFD) and located at the edge of the Kabili-Sepilok Forest Reserve in the East Malaysian state of Sabah (Borneo). This setting is of paramount importance for biodiversity conservation and research and a vital habitat for orang utan. As an Environmental Education Consultant I was tasked with developing an environmental education program for this setting as part of the SFD’s long- term strategy towards sustainable forest management. By employing the principles of Environmental Education and Environmental Interpretation I designed and implemented a program with three major components: • an environmental education component for visiting primary and secondary school groups. • an environmental education component for in-service and pre-service teachers and teacher educators. • a public awareness and environmental interpretation component which caters for the general public and tourists. From these modest beginnings the program has expanded and new facilities have been developed to meet the demands of visitors, teachers and students. The effectiveness of the program can be traced back to the grounding in the principles of best practice environmental education, communication and interpretation.
Resumo:
The purpose of this study is to examine the current level of stakeholder involvement during the project's planning process. Stakeholders often provide the needed resources and have the ability to control the interaction and resource flows in the network. They also ultimately have strong impact on an organisation's survival, and therefore appropriate management and involvement of key stakeholders should be an important part of any project management plan. A series of literature reviews was conducted to identify and categorise significant phases involved in the planning. For data collection, a questionnaire survey was designed and distributed amongst nearly 200 companies who were involved in the residential building sector in Australia. Results of the analysis demonstrate the engagement levels of the four stakeholder groups involved in the planning process and establish a basis for further stakeholder involvement improvement.
Resumo:
Information and technology and its use in organisation transformation presents unprecedented opportunities and risks. Increasingly, the Governance of Enterprise Information and Technology (GEIT) competency in the board room and executive is needed. Whether your organization is small or large, public, private or not for profit or whether your industry is not considered high-tech, IT is impacting your sector – no exceptions. But there is a skill shortage in boards: GEIT capability is concerningly low. This capability is urgently needed across the board, including those directors who come from finance, legal, marketing, operations and HR backgrounds. Digital disruption also affects all occupations. Putting in place a vision will help ensure emergency responses will meet technology-related duty of care responsibilities. When GEIT-related forward thinking and planning is carried out at the same time that you put your business strategy and plan in place, your organization has a significantly increased chance of not only surviving, but thriving into the future. Those organizations that don’t build GEIT capability risk joining the growing list of once-leading firms left behind in the digital ‘cloud of smoke’. Those organizations that do will be better placed to reap the benefits and hedge against the risks of a digital world. This chapter provides actionable, research-based considerations and processes for boards to use, to build awareness, knowledge and skills in governing technology-related organization strategy, risk and value creation.