342 resultados para Management model


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Management (or perceived mismanagement) of large-scale, complex projects poses special problems and often results in spectacular failures, cost overruns, time blowouts and stakeholder dissatisfaction. While traditional project management responds with increasingly administrative constraints, we argue that leaders of such projects also need to display adaptive and enabling behaviours to foster adaptive processes, such as opportunity recognition, which requires an interaction of cognitive and affective processes of individual, project, and team leader attributes and behaviours. At the core of this model we propose is an interaction of cognitive flexibility, affect and emotional intelligence. The result of this interaction is enhanced leader opportunity recognition that, in turn, facilitates multilevel outcomes.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Prefabricated construction is regarded by many as an effective and efficient approach to improving construction processes and productivity, ensuring construction quality and reducing time and cost in the construction industry. However, many problems occur with this approach in practice, including higher risk levels and cost or time overruns. In order to solve such problems, it is proposed that the IKEA model of the manufacturing industry and VP technology are introduced into a prefabricated construction process. The concept of the IKEA model is identified in detail and VP technology is briefly introduced. In conjunction with VP technology, the applications of the IKEA model are presented in detail, i.e. design optimization, production optimization and installation optimization. Furthermore, through a case study of a prefabricated hotel project in Hong Kong, it is shown that the VP-based IKEA model can improve the efficiency and safety of prefabricated construction as well as reducing cost and time.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Sustainable urban development and the liveability of a city are increasingly important issues in the context of land use planning and infrastructure management. In recent years, the promotion of sustainable urban development in Australia and overseas is facing various physical, socioeconomic and environmental challenges. These challenges and problems arise from the lack of capability of local governments to accommodate the needs of the population and economy in a relatively short timeframe. The planning of economic growth and development is often dealt with separately and not included in the conventional land use planning process. There is also a sharp rise in the responsibilities and roles of local government for infrastructure planning and management. This increase in responsibilities means that local elected officials and urban planners have less time to prepare background information and make decisions. The Brisbane Urban Growth Model has proven initially successful in providing a dynamic platform to ensure timely and coordinated delivery of urban infrastructure. Most importantly, this model is the first step for local governments in moving toward a systematic approach to pursuing sustainable and effective urban infrastructure management.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In recent years, local government infrastructure management practices have evolved from conventional land use planning to more wide ranging and integrated urban growth and infrastructure management approaches. The roles and responsibilities of local government are no longer simply to manage daily operational functions of a city and provide basic infrastructure. Local governments are now required to undertake economic planning, manage urban growth; be involved in major infrastructure planning; and even engage in achieving sustainable development objectives. The Brisbane Urban Growth model has proven initially successful to ensure timely and coordinated delivery of urban infrastructure. This model may be the first step for many local governments to move toward an integrated, sustainable and effective infrastructure management.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The purpose of this paper is to review the incidence of upper-body morbidity (arm and breast symptoms, impairments, and lymphedema), methods for diagnosis, and prevention and treatment strategies. It was also the purpose to highlight the evidence base for integration of prospective surveillance for upper-body morbidity within standard clinical care of women with breast cancer. Between 10% and 64% of women report upper-body symptoms between 6 months and 3 years after breast cancer, and approximately 20% develop lymphedema. Symptoms remain common into longer-term survivorship, and although lymphedema may be transient for some, those who present with mild lymphedema are at increased risk of developing moderate to severe lymphedema. The etiology of morbidity seems to be multifactorial, with the most consistent risk factors being those associated with extent of treatment. However, known risk factors cannot reliably distinguish between those who will and will not develop upper-body morbidity. Upper-body morbidity may be treatable with physical therapy. There is also evidence in support of integrating regular surveillance for upper-body morbidity into the routine care provided to women with breast cancer, with early diagnosis potentially contributing to more effective management and prevention of progression of these conditions.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Wound research is a complex multidimensional activity most effectively conducted by inter-disciplinary teams that connect studies in basic wound biology, devices and biomaterials with clinical practice. These complexities have been recognised in a new initiative through the establishment of an inter-disciplinary wound research centre in Australia; the Wound Management Innovation Cooperative Research Centre (WMI CRC). The centre is funded by the Australian Government's Cooperative Research Centre Program and a consortium of 22 participants and has a resource of US$108 million over 8 years...

Relevância:

40.00% 40.00%

Publicador:

Resumo:

All civil and private aircraft are required to comply with the airworthiness standards set by their national airworthiness authority and throughout their operational life must be in a condition of safe operation. Aviation accident data shows that over twenty percent of all fatal accidents in aviation are due to airworthiness issues, specifically aircraft mechanical failures. Ultimately it is the responsibility of each registered operator to ensure that their aircraft remain in a condition of safe operation, and this is done through both effective management of airworthiness activities and the effective program governance of safety outcomes. Typically, the projects within these airworthiness management programs are focused on acquiring, modifying and maintaining the aircraft as a capability supporting the business. Program governance provides the structure through which the goals and objectives of airworthiness programs are set along with the means of attaining them. Whilst the principal causes of failures in many programs can be traced to inadequate program governance, many of the failures in large scale projects can have their root causes in the organisational culture and more specifically in the organisational processes related to decision-making. This paper examines the primary theme of project and program based enterprises, and introduces a model for measuring organisational culture in airworthiness management programs using measures drawn from 211 respondents in Australian airline programs. The paper describes the theoretical perspectives applied to modifying an original model to specifically focus it on measuring the organisational culture of programs for managing airworthiness; identifying the most important factors needed to explain the relationship between the measures collected, and providing a description of the nature of these factors. The paper concludes by identifying a model that best describes the organisational culture data collected from seven airworthiness management programs.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Downtime (DT) caused by non-availability of equipment and equipment breakdown has non-trivial impact on the performance of construction projects. Earlier research has often addressed this fact, but it has rarely explained the causes and consequences of DT – especially in the context of developing countries. This paper presents a DT model to address this issue. Using this model, the generic factors and processes related to DT are identified, and the impact of DT is quantified. By applying the model framework to nine road projects in Nepal, the impact of DT is explored in terms of its duration and cost. The research findings highlight how various factors and processes interact with each other to create DT, and mitigate or exacerbate its impact on project performance. It is suggested that construction companies need to adopt proactive equipment management and maintenance programs to minimize the impact of DT.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

All civil and private aircraft are required to comply with the airworthiness standards set by their national airworthiness authority and throughout their operational life must be in a condition of safe operation. Aviation accident data shows that over 20% of all fatal accidents in aviation are due to airworthiness issues, specifically aircraft mechanical failures. Ultimately it is the responsibility of each registered operator to ensure that their aircraft remain in a condition of safe operation, and this is done through both effective management of airworthiness activities and the effective programme governance of safety outcomes. Typically, the projects within these airworthiness management programmes are focused on acquiring, modifying and maintaining the aircraft as a capability supporting the business. Programme governance provides the structure through which the goals and objectives of airworthiness programmes are set along with the means of attaining them. Whilst the principal causes of failures in many programmes can be traced to inadequate programme governance, many of the failures in large-scale projects can have their root causes in the organizational culture and more specifically in the organizational processes related to decision-making. This paper examines the primary theme of project and programme-based enterprises, and introduces a model for measuring organizational culture in airworthiness management programmes using measures drawn from 211 respondents in Australian airline programmes. The paper describes the theoretical perspectives applied to modifying an original model to specifically focus it on measuring the organizational culture of programmes for managing airworthiness; identifying the most important factors needed to explain the relationship between the measures collected, and providing a description of the nature of these factors. The paper concludes by identifying a model that best describes the organizational culture data collected from seven airworthiness management programmes.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Better management of knowledge assets has the potential to improve business processes and increase productivity. This fact has led to considerable interest in recent years in the knowledge management (KM) phenomenon, and in the main dimensions that can impact on its application in construction. However, a lack of a systematic way of assessing KM initia-tives’ contribution towards achieving organisational business objectives is evident. This paper describes the first stage of a research project intended to develop, and empirically test, a KM input-process-output framework comprising unique and well-defined theoretical constructs representing the KM process and its internal and external determinants in the context of con-struction. The paper presents the underlying principles used in operationally defining each construct through the use of extant KM literature. The KM process itself is explicitly mod-elled via a number of clearly articulated phases that ultimately lead to knowledge utilisation and capitalisation, which in turn adds value or otherwise to meeting defined business objec-tives. The main objective of the model is to reduce the impact of subjectivity in assessing the contribution made by KM practices and initiatives toward achieving performance improvements.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This study aimed to explore how a new model of integrated primary/secondary care for type 2 diabetes management, the Brisbane South Complex Diabetes Service (BSCDS), related to improved diabetes management in a selected group of patients. We used a qualitative research design to obtain detailed accounts from the BSCDS via semi-structured interviews with 10 patients. The interviews were fully transcribed and systematically coded using a form of thematic analysis. Participants’ responses were grouped in relation to: (1) Patient-centred care; (2) Effective multiprofessional teamwork; and (3) Empowering patients. The key features of this integrated primary/secondary care model were accessibility and its delivery within a positive health care environment, clear and supportive interpersonal communication between patients and health care providers, and patients seeing themselves as being part of the team-based care. The BSCDS delivered patient-centred care and achieved patient engagement in ways that may have contributed to improved type 2 diabetes management in these participants.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Small and micro-enterprises play a significant part in economic growth and poverty alleviation in developing African countries. There are, however, a range of management issues that arise when looking at the support required for local enterprise development, the role and management style of the local support agency and the role and style of the, usually Western, funding body. This paper explores the management philosophy required to establish and resource micro-enterprise development and compares the local management processes with those expected by a Western funding body.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Asset service organisations often recognize asset management as a core competence to deliver benefits to their business. But how do organizations know whether their asset management processes are adequate? Asset management maturity models, which combine best practices and competencies, provide a useful approach to test the capacity of organisations to manage their assets. Asset management frameworks are required to meet the dynamic challenges of managing assets in contemporary society. Although existing models are subject to wide variations in their implementation and sophistication, they also display a distinct weakness in that they tend to focus primarily on the operational and technical level and neglect the levels of strategy, policy and governance as well as the social and human resources – the people elements. Moreover, asset management maturity models have to respond to the external environmental factors, including such as climate change and sustainability, stakeholders and community demand management. Drawing on five dimensions of effective asset management – spatial, temporal, organisational, statistical, and evaluation – as identified by Amadi Echendu et al. [1], this paper carries out a comprehensive comparative analysis of six existing maturity models to identify the gaps in key process areas. Results suggest incorporating these into an integrated approach to assess the maturity of asset-intensive organizations. It is contended that the adoption of an integrated asset management maturity model will enhance effective and efficient delivery of services.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

To effectively manage the challenges being faced by construction organisations in a fast changing business environment, many organisations are attempting to integrate knowledge management (KM) into their business operations. KM activities interact with each other and form a process which receives input from its internal business environment and produces outputs that should be justified by its business performance. This paper aims to provide further understanding on the dynamic nature of the KM process. Through a combination of path analysis and system dynamic simulation, this study found that: 1) an improved business performance enables active KM activities and provide feedback and guidance for formulating learning-based policies; and 2) effective human resource recruitment policies can enlarge the pool of individual knowledge, which lead to a more conducive internal business environment, as well as a higher KM activity level. Consequently, the desired business performance level can be reached within a shorter time frame.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The nature of construction projects and their delivery exposes participants to accidents and dangers. Safety climate serves as a frame of reference for employees to make sense of safety measures in the workplace and adapt their behaviors. Though safety climate research abounds, fewer efforts are made to investigate the formation of a safety climate. An effort to explore forming psychological safety climate, an operationalization of safety climate at the individual level, is an appropriate starting point. Taking the view that projects are social processes, this paper develops a conceptual framework of forming the psychological safety climate, and provides a preliminary validation. The model suggests that management can create the desired psychological safety climate by efforts from structural, perceptual, interactive, and cultural perspectives. Future empirical research can be built on the model to provide a more comprehensive and coherent picture of the determinants of safety climate.