Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong


Autoria(s): Li, Heng; Guo, Samuel H.L.; Skitmore, Ronald Martin; Huang, Ting; Chan, K.Y.N.; Chan, Greg
Data(s)

01/03/2011

Resumo

Prefabricated construction is regarded by many as an effective and efficient approach to improving construction processes and productivity, ensuring construction quality and reducing time and cost in the construction industry. However, many problems occur with this approach in practice, including higher risk levels and cost or time overruns. In order to solve such problems, it is proposed that the IKEA model of the manufacturing industry and VP technology are introduced into a prefabricated construction process. The concept of the IKEA model is identified in detail and VP technology is briefly introduced. In conjunction with VP technology, the applications of the IKEA model are presented in detail, i.e. design optimization, production optimization and installation optimization. Furthermore, through a case study of a prefabricated hotel project in Hong Kong, it is shown that the VP-based IKEA model can improve the efficiency and safety of prefabricated construction as well as reducing cost and time.

Formato

application/pdf

Identificador

http://eprints.qut.edu.au/49687/

Publicador

Taylor & Francis

Relação

http://eprints.qut.edu.au/49687/1/IKEA-precast-CME-3.pdf

DOI:10.1080/01446193.2010.545994

Li, Heng, Guo, Samuel H.L., Skitmore, Ronald Martin, Huang, Ting, Chan, K.Y.N., & Chan, Greg (2011) Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong. Construction Management and Economics, 29(3), pp. 233-245.

Direitos

Copyright 2011 Taylor & Francis

This is a preprint of an article submitted for consideration in the [Construction Management and Economics] © [2011] [copyright Taylor & Francis]; [Construction Management and Economics] is available online at: www.tandfonline.com

Fonte

School of Civil Engineering & Built Environment; Science & Engineering Faculty

Palavras-Chave #120200 BUILDING #120201 Building Construction Management and Project Planning #Prefabricated construction #IKEA model #Virtual Prototyping #design optimization #construction optimization
Tipo

Journal Article