111 resultados para weekly forward contracting
Resumo:
Many countries over the last decade, have used performance-based contracting (PBC) to manage and maintain roads. The implementation of PBC provides additional benefits for the government/public such as cost savings and improved conditions of contracted road assets. In Australia, PBC is already being implemented on all categories of roads: national, state, urban and rural. Australian PBC arrangement is designed to turn over control and responsibility for roadway system maintenance, rehabilitation, and capital improvement projects to private contractors. Contractors’ responsibilities include determination of treatment types, the design, programming and the undertaking of works needed to maintain road networks at predetermined performance levels. Indonesia initiated two PBC pilot projects in 2011, the Pantura Section Demak-Trengguli (7.68 kilometers) in Central Java Province and Section Ciasem-Pamanukan (18.5 kilometers) in West Java Province. Both sections are categorized as national roads. The contract duration for both of these projects is four years. To facilitate a possible way forward, it is proposed to conduct a study to understand Australia's experiences of advancing from pilot projects to nation-wide programs using PBC. The study focuses on the scope of contracts, bidding processes, risk allocation, and key drivers, using relevant PBC case studies from Australia. Recommendations for future PBC deployment nation-wide should be based on more research associated with risk allocation. This will include investigation of standard conditions of contract. Implications of the contract clauses for the risk management strategy to be adopted by contractors. Based on the nature of risks, some are best managed by the project owner. It is very important that all parties involved to be open to the new rules of contract and to convince themselves about the potential increased benefits of the use of PBC. The most recent states of challenging issues were explored and described.
Resumo:
This is an initial report of the PolyU SD part of the team to study Pre-fabricated Building Design and Construction Methodology and marks the completion of Phase 1. It follows our first notes prepared for the meeting on 2 February that identified some critical issues including future lifestyles, life expectancy of buildings, sustainability, size, flexibility and planning considerations. It is also an expansion of our presentation in Dongguan on 23 February. It is not a comprehensive survey of existing approaches or possible ways forward, but it has homed in on certain specific issues and does give specific examples to make the suggestions concrete. It is recommended that more comprehensive research be done to establish previous work and experience internationally. It is also recommended that more research be done on lifestyles as a preliminary to developing at least three concepts for evaluation before proceeding to the detailed design of one concept for full prototyping and market testing. The goal at this point is not to define a single direction but to suggest several future trajectories for further consideration. By the same token, this report is not intended as an exhaustive description of the considerable base of knowledge and ideas brought by the PolyU team to this exciting task. Before taking on an issue of this magnitude and importance in the definition of Hong Kong's future, one must carry out a thoughtful analysis of the issues at hand and an informed definition of paradigms, directions, goals and methods whereby our energies can be best used in the next steps. This report is the result of this analysis
Resumo:
Partnering has been defined in many ways. It can be considered as an individual project mechanism or can be considered as a long term strategy. Alliancing is normally assumed to be a long term business strategy linking together client, contractor and supply chain. Relational contracting goes further than this and brings in the whole philosophy of the value chain and the linking of the interdependent parts within the construction project as a key business objective. This document aims to review existing definitions of these three concepts and present and overview of the current state of-the-art in terms of their use and implementation. The document should be useful for all of those project team members looking to sharpen their understanding of the various concepts and will also provide a platform for debating the current state of the definitions and implementations being used in Main Roads and Public Works Departments.
Resumo:
Process Control Systems (PCSs) or Supervisory Control and Data Acquisition (SCADA) systems have recently been added to the already wide collection of wireless sensor networks applications. The PCS/SCADA environment is somewhat more amenable to the use of heavy cryptographic mechanisms such as public key cryptography than other sensor application environments. The sensor nodes in the environment, however, are still open to devastating attacks such as node capture, which makes designing a secure key management challenging. In this paper, a key management scheme is proposed to defeat node capture attack by offering both forward and backward secrecies. Our scheme overcomes the pitfalls which Nilsson et al.'s scheme suffers from, and is not more expensive than their scheme.
Resumo:
Road crashes are now the most common cause of work-related injury, death and absence in a number of countries. Given the impact of workrelated driving crashes on social and economic aspects of business and the community, workrelated road safety and risk management has received increasing attention in recent years. However, limited academic research has progressed on improving safety within the work-related driving sector. The aim of this paper is to present a review of work-related driving safety research to date, and provide an intervention framework for the future development and implementation of workrelated driving safety intervention strategies.
Resumo:
Anecdotal evidence highlights issues of alcohol and other drugs (AODs) and its association with safety risk on construction sites. Information is limited however regarding the prevalence of AODs in the workplace and there is limited evidential guidance regarding how to effectively address it. This research aimed to scientifically evaluate the use of AODs within the Australian construction industry in order to reduce the potential resulting safety and performance impacts and engender a cultural change in the workforce. A national qualitative and quantitative evaluation of the use of AODs was conducted with approximately 500 employees. Results indicate that as in the general population, a proportion of those sampled in the construction sector may be at risk of hazardous alcohol consumption and support the need for evidence-based, tailored responses. This is the first known study to scientifically evaluate the use of AODs and potential workplace safety impacts in the construction sector.
Resumo:
The construction industry is known to be an important contributor towards the gross domestic product of many countries. Moreover, the health of the construction industry is positively correlated to the economic growth of a country and in many economies public sector clients account for a major share of construction works. Given this strength, it is important for public sector clients to initiate innovations aimed at the betterment of the industry. In this context, concern about sustainable development has been a major driver of some innovative initiatives in construction industries worldwide. Furthermore, the Government of Hong Kong regards both sustainability and community development as important criteria when planning and procuring construction projects. This paper is based on a case study of a public sector development project in Hong Kong, and presents the salient features of the procurement and contractual systems adopted in the project, which foster sustainability and community development. The reported interim findings are based on a preliminary document analysis that is part of an ongoing longitudinal case study into the project. The document analysis takes a three-pronged approach in terms of how the procurement and contractual systems foster economic, environmental and social sustainability, and sums up their impact on the community as a whole.
Resumo:
Technological and societal change, along with organisational and market change (driven by contracting-out and privatisation), are “creating a new generation of infrastructures” [1]. While inter-organisational contractual arrangements can improve maintenance efficiency through consistent and repeatable patterns of action - unanticipated difficulties in implementation can reduce the performance of these arrangements. When faced with unsatisfactory performance of contracting-out arrangements, government organisations may choose to adapt and change these arrangements over time, with the aim of improving performance. This paper enhances our understanding of ‘next generation infrastructures’ by examining adaptation of the organisational arrangements for the maintenance of these assets, in a case study spanning 20 years.