35 resultados para Documental Management


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Through the analysis of the exceptional accounting documents of 1517 related to the construction of the Monastery of Jerónimos (Lisbon), this paper discusses the main characteristics of a new model of construction site organization. In the later Middle Ages we can find, among others, two main models of constructing site organization. One, older and more widespread, consisted in a centralized and pyramidal management model. The other, apparently more recent, was based in the existence of several autonomous teams working simultaneously, each one responsible for building a specific part or section of the building. This paper describes and discusses this new organizational model as it was adopted and implemented by João de Castilho (1470–1552) for the construction of the Monastery of Jerónimos in 1517, probably for the first time in Portugal, but with some parallels in other places in Europe.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This article describes the evaluation of a psychological intervention—the Career Self-Management Seminar, Version A, for undergraduate students, and Version B for postgraduate students—developed to support Portuguese college students in career exploration, goal setting, design and implementation of action plans, and decision-making. A total of 120 participants from CSMS-A (experimental group, n = 58; control group, n = 62) and 98 from CSMS-B (experimental group, n = 62; control group, n = 36) were assessed by the Career Exploration Survey according to a pretest and posttest plan. Results demonstrate a significant increase in most of the cognitive, behavioral, and affective career exploration dimensions among the CSMS-A and CSMS-B experimental groups.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Prognostic Health Management (PHM) has been asserting itself as the most promising methodology to enhance the effective reliability and availability of a product or system during its life-cycle conditions by detecting current and approaching failures, thus, providing mitigation of the system risks with reduced logistics and support costs. However, PHM is at an early stage of development, it also expresses some concerns about possible shortcomings of its methods, tools, metrics and standardization. These factors have been severely restricting the applicability of PHM and its adoption by the industry. This paper presents a comprehensive literature review about the PHM main general weaknesses. Exploring the research opportunities present in some recent publications, are discussed and outlined the general guide-lines for finding the answer to these issues.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objetivo do presente trabalho foi estudar a influência dos diferentes sistemas de fios (trama, teia de base e teia da argola) no desempenho dos tecidos de felpos, no que concerne às propriedades de absorção, capilaridade e libertação de humidade. Para este estudo usaram-se quatro tipos de combinações destes sistemas de fios, para a mesma estrutura de tecidos de felpo, na teia de base utilizou-se somente fios de Tencel®, na teia de argola e da trama varou-se a composição dos fios entre fios de algodão e de Tencel®. Os resultados obtidos demonstram que quando a utilização fios de Tencel® em qualquer dos sistemas (trama ou teia da argola) favorece a capacidade de difusão de líquidos na estrutura, a utilização de fios de algodão na teia de argola favorece a capacidade de absorção.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Tese de Doutoramento em Ciências da Educação (área de especialização em Desenvolvimento Curricular).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Risk management is an important component of project management. Nevertheless, such process begins with risk assessment and evaluation. In this research project, a detailed analysis of the methodologies used to treat risks in investment projects adopted by the Banco da Amazonia S.A. was made. Investment projects submitted to the FNO (Constitutional Fund for Financing the North) during 2011 and 2012 were considered for that purpose. It was found that the evaluators of this credit institution use multiple indicators for risk assessment which assume a central role in terms of decision-making and contribute for the approval or the rejection of the submitted projects; namely, the proven ability to pay, the financial records of project promotors, several financial restrictions, level of equity, level of financial indebtedness, evidence of the existence of a consumer market, the proven experience of the partners/owners in the business, environmental aspects, etc. Furthermore, the bank has technological systems to support the risk assessment process, an internal communication system and a unique system for the management of operational risk.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Project Management involves onetime endeavors that demand for getting it right the first time. On the other hand, project scheduling, being one of the most modeled project management process stages, still faces a wide gap from theory to practice. Demanding computational models and their consequent call for simplification, divert the implementation of such models in project management tools from the actual day to day project management process. Special focus is being made to the robustness of the generated project schedules facing the omnipresence of uncertainty. An "easy" way out is to add, more or less cleverly calculated, time buffers that always result in project duration increase and correspondingly, in cost. A better approach to deal with uncertainty seems to be to explore slack that might be present in a given project schedule, a fortiori when a non-optimal schedule is used. The combination of such approach to recent advances in modeling resource allocation and scheduling techniques to cope with the increasing flexibility in resources, as can be expressed in "Flexible Resource Constraint Project Scheduling Problem" (FRCPSP) formulations, should be a promising line of research to generate more adequate project management tools. In reality, this approach has been frequently used, by project managers in an ad-hoc way.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study focuses on the granite mountain known as Monte Pindo (627 m above sea level) in the Autonomous Community of Galicia (NW Spain). This territory is included in the area classified as “Costa da Morte” in the “Politica de Ordenación Litoral” (POL) (Coastal Planning Policy) for the region of Galicia. This coastal unit, located between “Rías Baixas” and “Cape Fisterra” has great potential for demonstrating geological processes and its geomorphological heritage is characterized by a high degree of geodiversity of granite landforms. The main objective of our work is to assess the geomorphological heritage of the site, thus revealing its wide geodiversity. We shall analyze and highlight: its scientific value, developing an inventory of granite landforms; its educational valuel and its geotouristic potential. It must be ensured that the Administration understands that natural diversity is composed of both geodiversity and biodiversity. Only then will the sustainable management of Monte Pindo become possible by integrating natural and cultural heritage values. The goal is to ensure that Monte Pindo and its immediate surroundings become a geopark with the aim of promoting local development projects based on the conservation and valorization of its geological heritage.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação de mestrado integrado em Engenharia e Gestão de Sistemas de Informação

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação de mestrado em Contabilidade

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A Agência Portuguesa do Ambiente é possuidora de um valioso arquivo, resultante da atividade centenária desenvolvida pelos diferentes organismos com tutela sobre a gestão da água e o planeamento dos recursos hídricos, que importa conhecer e divulgar. O Arquivo Histórico dos Serviços Hidráulicos é um dos mais ricos acervos locais do País, reunindo um conjunto de milhares de documentos, que vão do século XIX à atualidade, constituindo um repositório documental com características ímpares e um testemunho da identidade, memória e história dos Serviços Hidráulicos. Os processos arquivados contam casos de estudo que percorrem os usos das águas públicas para diferentes fins e as modalidades da sua utilização, das quais queremos destacar os aproveitamentos hidráulicos e a laboração de moinhos. Com este artigo, pretendemos apresentar um roteiro metodológico para o estudo das formas de organização dos processos existentes no arquivo sobre os moinhos e aproveitamentos hidráulicos, no concelho de Lousada, no que respeita aos documentos e peças anexas, bem como aos modelos administrativos subjacentes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação de mestrado em Sistemas de Informação

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Tese de Doutoramento em Ciências da Educação (área de especilização em Desenvolvimento Curricular).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Large scale distributed data stores rely on optimistic replication to scale and remain highly available in the face of net work partitions. Managing data without coordination results in eventually consistent data stores that allow for concurrent data updates. These systems often use anti-entropy mechanisms (like Merkle Trees) to detect and repair divergent data versions across nodes. However, in practice hash-based data structures are too expensive for large amounts of data and create too many false conflicts. Another aspect of eventual consistency is detecting write conflicts. Logical clocks are often used to track data causality, necessary to detect causally concurrent writes on the same key. However, there is a nonnegligible metadata overhead per key, which also keeps growing with time, proportional with the node churn rate. Another challenge is deleting keys while respecting causality: while the values can be deleted, perkey metadata cannot be permanently removed without coordination. Weintroduceanewcausalitymanagementframeworkforeventuallyconsistentdatastores,thatleveragesnodelogicalclocks(BitmappedVersion Vectors) and a new key logical clock (Dotted Causal Container) to provides advantages on multiple fronts: 1) a new efficient and lightweight anti-entropy mechanism; 2) greatly reduced per-key causality metadata size; 3) accurate key deletes without permanent metadata.