874 resultados para site operations


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this thesis is to find development areas for site operations in power plant construction projects delivered by Wärtsilä. The inspected operations are subcontractor management, site material management and work scheduling. The contractor's role in EPC project is to respond for engineering, procurement, and construction supervision. Geographical and cultural differences brings challenges for finding development areas as Wärtsilä delivers projects world-wide. Searching for development area is mainly made with survey, which answers were collected from the target company's site personnel. Based on the results, with good planning and preparation various problems would be avoided. An external view for the thesis was collected by an expert interview, which was held to three expe-rienced construction operating executives. Interviewees believed that with the se-lection of right site personnel and clearly defined areas of responsibility will great-ly affect the outcome of the project. Some of the theory has been collected from areas, which have helped to under-stand the inspected operations on site. Improving competence knowledge has been important due to the broad scope of work and the author’s inexperience of the topic. Also generally effective practices from construction projects has been col-lected to the theory part. Functionality of general practices have been reflected together with the results of empirically collected data for Wärtsilä's projects. As a result, a model was generated where development proposals and the benefits from new procedures were presented.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

As manufacturers face an increasingly competitive environment, they seek out opportunities to reduce production costs without negatively affecting the yield or the quality of their finished products. The challenge of maintaining high product quality while simultaneously reducing production costs can often be met through investments in energy efficient technologies and energy efficiency practices. Energy management systems can offer both technological and best practice efficiencies in order to achieve substantial savings. A strong energy management system provides a solid foundation for an organisation to reduce production costs and improve site efficiency. The I.S EN16001 energy management standard specifies the requirements for establishing, implementing, maintaining and improving an energy management system and represents the latest best practice for energy management in Ireland. The objective of the energy management system is to establish a systematic approach for improving energy performance continuously. The I.S EN16001 standard specifies the requirements for continuous improvement through using energy more efficiently. The author analysed how GlaxoSmithKline’s (GSK) pharmaceutical manufacturing facility in Cork implemented the I.S. EN16001 energy management system model, and defined how energy saving opportunities where identified and introduced to improve efficiency performance. The author performed an extensive literature research in order to determine the current status of the pharmaceutical industry in Ireland, the processes involved in pharmaceutical manufacturing, the energy users required for pharmaceutical manufacturing and the efficiency measures that can be applied to these energy users in order to reduce energy consumption. The author then analysed how energy management standards are introduced to industry and critically analysed the driving factors for energy management performance in Ireland through case studies. Following an investigation as to how the I.S. EN16001 energy management standard is operated in GSK, a critical analysis of the performance achieved by the GSK energy management system is undertaken in order to determine if implementing the I.S EN16001 standard accelerates achieving energy savings. Since its introduction, the I.S. EN16001 model for energy management has enabled GSK to monitor, target and identify energy efficiency opportunities throughout the site. The model has put in place an energy management system that is continuously reviewed for improvement and to date has reduced GSK’s site operations cost by over 30% through technical improvements and generating energy awareness for smarter energy consumption within the GSK Cork site. Investment in I.S. EN16001 has proved to be a sound business strategy for GSK especially in today's manufacturing environment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The capacity to use geologic materials (soil and rock) that are available in the surrounding environment is inherent to the human civilization and has contributed to the evolution of societies throughout the course of history. The use of these materials in the construction of structures such as houses, roads, railways or dams, stirred the improvement of socioeconomic and environmental conditions. Several reports of structural problems on embankments can be found throughout history. A considerable number of those registers can be linked to inadequate compaction, demonstrating the importance of guaranteeing a suitable quality of soil compaction. Various methodologies and specifications of compaction quality control on site of earthworks, based on the fill moisture content and dry unit weight, were developed during the 20th century. Two widely known methodologies are the conventional and nuclear techniques. The conventional methods are based on the use of the field sand cone test (or similar) and sampling of material for laboratory-based testing to evaluate the fill dry unit weight and water content. The nuclear techniques measure both parameters in the field using a nuclear density gauge. A topic under discussion in the geotechnical community, namely in Portugal, is the comparison between the accuracy of the nuclear gauge and sand cone test results for assessing the compaction and density ratio of earth fills, particularly for dams. The main purpose of this dissertation is to compare both of them. The data used were acquired during the compaction quality control operations at the Coutada/Tamujais dam trial embankment and core construction. This is a 25 m high earth dam located in Vila Velha de Rodão, Portugal. To analyse the spatial distribution of the compaction parameters (water content and compaction ratio), a 3D model was also developed. The main results achieved are discussed and finally some considerations are put forward on the suitability of both techniques to ensure fill compaction quality and on additional research to complement the conclusions obtained.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Laparoscopic operations offer a myriad of advantages resulting in a rapid postoperative recovery. Incisional hernia is an uncommon cause of morbidity in operative procedures performed by laparoscopic access, and the diagnosis may not be easily made. In our service we identified 2 patients with incisional hernia the site of trocar insertion. The records of these 2 cases were reviewed. We report on these 2 cases and present a review of the literature.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

BACKGROUND: Surveillance is an essential element of surgical site infection (SSI) prevention. Few studies have evaluated the long-term effect of these programmes. AIM: To present data from a 13-year multicentre SSI surveillance programme from western and southern Switzerland. METHODS: Surveillance with post-discharge follow-up was performed according to the US National Nosocomial Infections Surveillance (NNIS) system methods. SSI rates were calculated for each surveyed type of surgery, overall and by year of participation in the programme. Risk factors for SSI and the effect of surveillance time on SSI rates were analysed by multiple logistic regression. FINDINGS: Overall SSI rates were 18.2% after 7411 colectomies, 6.4% after 6383 appendicectomies, 2.3% after 7411 cholecystectomies, 1.7% after 9933 herniorrhaphies, 1.6% after 6341 hip arthroplasties, and 1.3% after 3667 knee arthroplasties. The frequency of SSI detected after discharge varied between 21% for colectomy and 94% for knee arthroplasty. Independent risk factors for SSI differed between operations. The NNIS risk index was predictive of SSI in gastrointestinal surgery only. Laparoscopic technique was protective overall, but associated with higher rates of organ-space infections after appendicectomy. The duration of participation in the surveillance programme was not associated with a decreased SSI rate for any of the included procedure. CONCLUSION: These data confirm the effect of post-discharge surveillance on SSI rates and the protective effect of laparoscopy. There is a need to establish alternative case-mix adjustment methods. In contrast to other European programmes, no positive impact of surveillance duration on SSI rates was observed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study identified transportation safety issues at existing Iowa school sites through on-site observations, traffic data collection, and through interviews with schools, law enforcement, and traffic engineers. Frequently observed problems, such as crossing at unmarked crosswalks, unloading and loading students on the street side, inattentive student safety patrols, and illegal parking, were documented and solutions were recommended for implementation. The results of the study also conclude that regular communications between school officials, traffic engineers, law enforcement, parents, and school transportation personnel are all critical to promoting safe operations within school zones.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Introduction: An excellent coordination between firefighters, policemen and medical rescue is the key to success in the management of major accidents. In order to improve and assist the medical teams engaged on site, the Swiss "medical command and control system" for rescue operations is based on a binomial set up involving one head emergency doctor and one head rescue paramedic, both trained in disaster medicine. We have recently experimented an innovative on-site "medical command and control system", based on the binomial team, supported by a dedicated 144 dispatcher. Methods: A major road traffic accident took place on the highway between Lausanne and Vevey on April 9th 2008. We have retrospectively collected all data concerning the victims as well as the logistics and dedicated structures, reported by the 144, the Hospitals, the Authority of the State and the Police and Fire Departments. Results: The 72-car pileup caused one death and 26 slightly injured patients. The management on the accident site was organized around a tripartite system, gathering together the medical command and control team with the police and fire departments. On the medical side, 16 ambulances, 2 medical response teams (SMUR), the Rega crew and the medical command and control team were dispatched by the 144. On that occasion an advanced medical command car equipped with communication devices and staffed with a 144 dispatcher was also engaged, allowing efficient medical regulation directly from the site. Discussion: The specific skills of one doctor and one paramedic both trained for disaster's management proved to be perfectly complementary. The presence of a dispatcher on site with a medical command car also proved to be useful, improving orders transmission from the medical command team to all other on- and off-site partners. It relieved the need of repeated back-and-forth communication with the 144, allowing both paramedic and doctor to focus on strategy and tactics rather than communication and logistics.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The impact of wood loads on bulk density and preconsolidation pressure and of harvester and forwarder traffic on rut depth, bulk density and preconsolidation pressure of two Ultisols were examined in this study. Our objective was to quantify the threshold beyond which significant soil compaction and rutting would occur. This study was carried out in the county of Eunápolis, state of Bahia, Brazil, (16 º 23 ' 17 '' S and 39 º 10 ' 06 '' W; altitude 80 m asl) in two Ultisols (PAd2 and PAd3) with different texture classes, in experimental areas with eucalypt plantation. The study involved measurements at the wood load site and machine driving at specific locations in the forest during logging operations. The treatments consisted of one harvester pass and, 8, 16 and 40 passes of a fully loaded forwarder. Thresholds were established based on the rut depth and percentage of preconsolidation pressure values in the region of additional soil compaction defined in the bearing capacity model. The percentage of soil samples with values of preconsolidation pressure in the region of additional soil compaction indicated a greater susceptibility of PAd3 than of PAd2 to soil compaction. The threshold levels established here based on preconsolidation pressure and rut depth indicated that no more than eight forwarder passes should be allowed in loading operations in order to minimize soil compaction.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A t the request of the Iowa State Highway Commission, the Engineering Research Institute observed the traffic operations at the Interstate 29 (1-29) and Interstate 80 (1-80) interchange in the southwest part of Council Bluffs. The general location of the site is shown in Figure 1. Before limiting the analysis to the diverging area the project staff drove the entire Council Bluffs freeway system and consulted with M r . Philip Hassenstab (Iowa State Highway Commission, District 4, Resident Maintenance Engineer at Council Bluffs). The final study scope was delineated as encompassing only the operational characteristics of the diverge area where 1-29 South and 1-80 East divide and the ramp to merge area where 1-80 West joins 1-29 North (both areas being contained within the aforementioned interchange). Supplementing the traffic operations scope, was an effort to delineate and document the applicability of video-tape techniques to traffic engineering studies and analyses. Documentation was primarily in the form of a demonstration video-tape.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

One of the more severe winter hazards is ice or compacted snow on roadways. While three methods are typically used to combat ice (salting, sanding and scraping), relatively little effort has been applied to improve methods of scraping ice from roads. In this project, a new test facility has been developed, comprising a truck with an underbody blade, which has been instrumented such that the forces to scrape ice from a pavement can be measured. A test site has been used, which is not accessible to the public, and ice covers have been sprayed onto the pavement and subsequently scraped from it, while the scraping loads have been recorded. Three different cutting edges have been tested for their ice scraping efficiency. Two of the blades are standard (one with a carbide insert, the other without) while the third blade was designed under the SHRP H-204A project. Results from the tests allowed two parameters to be identified. The first is the scraping efficiency which is the ratio of vertical to horizontal force. The lower this ratio, the more efficiently ice is being removed. The second parameter is the scraping effectiveness, which is related (in some as yet unspecified manner) to the horizontal load. The higher the horizontal load, the more ice is being scraped. The ideal case is thus to have as high a horizontal load as possible, combined with the lowest possible vertical load. Results indicate that the SHRP blade removed ice more effectively than the other two blades under equivalent conditions, and furthermore, did so with greater efficiency and thus more control. Furthermore, blade angles close to 0 deg provide for the most efficient scraping for all three blades. The study has shown that field testing of plow blades is possible in controlled situations, and that blades can be evaluated using this system. The system is available for further tests as are deemed appropriate.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

OBJECTIVE: We sought to study the epidemiologic and medical aspects of alpine helicopter rescue operations involving the winching of an emergency physician to the victim. METHODS: We retrospectively reviewed the medical and operational reports of a single helicopter-based emergency medical service. Data from 1 January 2003 to 31 December 2008 were analysed. RESULTS: A total of 921 patients were identified, with a male:female ratio of 2:1. There were 56 (6%) patients aged 15 or under. The median time from emergency call to helicopter take-off was 7 min (IQR = 5-10 min). 840 (91%) patients suffered from trauma-related injuries, with falls from heights during sports activities the most frequent event. The most common injuries involved the legs (246 or 27%), head (175 or 19%), upper limbs (117 or 13%), spine (108 or 12%), and femur (66 or 7%). Only 81 (9%) victims suffered from a medical emergency, but these cases were, when compared to the trauma victims, significantly more severe according to the NACA index (p<0.001). Overall, 246 (27%) patients had a severe injury or illness, namely, a potential or overt vital threat (NACA score between 4 and 6). A total of 478 (52%) patients required administration of major analgesics: fentanyl (443 patients or 48%), ketamine (42 patients or 5%) or morphine (7 patients or 1%). The mean dose of fentanyl was 188 micrograms (range 25-750, SD 127). Major medical interventions such as administration of vasoactive drugs, intravenous perfusions of more than 1000 ml of fluids, ventilation or intubation were performed on 39 (4%) patients. CONCLUSIONS: The severity of the patients' injuries or illnesses along with the high proportion of medical procedures performed directly on-site validates emergency physician winching for advanced life support procedures and analgesia.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

BACKGROUND: Surgical site infection (SSI) is a common cause of major morbidity after liver resection. This study aimed to identify the risk factors for incisional and organ/space SSIs after liver resection. METHODS: Our liver surgery database was retrospectively analyzed for patients treated between January 2009 and November 2012 in a tertiary care Swiss hospital. Univariate and multivariate analyses were conducted on preoperative, intraoperative, and postoperative variables to identify risk factors for incisional and organ/space SSIs. RESULTS: In a total of 226 patients, SSI incidences were 12.8 % (incisional), 4.0 % (organ/space), and 1.8 % (both). Univariate analysis showed that incisional SSIs were associated with high American Society of Anesthesiologists (ASA) scores, preoperative anemia, hypoalbuminemia, low prothrombin time, viral or alcoholic chronic hepatitis, liver cirrhosis, and prolonged operation times. Organ/space SSIs were associated with high rates of red blood cell transfusions, concomitant bowel surgery, and prolonged operation times. Multivariate analysis revealed that risk factors for incisional SSIs were anemia [odds ratio (OR) 2.82], high ASA scores (OR 2.88), presence of hepatitis or cirrhosis (OR 5.07), and prolonged operation times (OR 9.61). The only risk factor for organ/space SSIs was concomitant bowel surgery (OR 5.53). Hospital stays were similar in organ/space and incisional SSI groups, but significantly longer for those with both organ/space and incisional SSIs. CONCLUSIONS: High ASA scores, anemia, chronic hepatitis or liver cirrhosis, and prolonged operations increased the risk of incisional SSIs; concomitant bowel surgery increased the risk of organ/space SSI. Specific precautions to prevent organ/space and incisional SSIs may shorten hospital stays.