Final Report-Freeway Operations Analysis of I-80 to I-29 Interchange, January 1974


Autoria(s): Desconhecido
Data(s)

01/01/1974

Resumo

A t the request of the Iowa State Highway Commission, the Engineering Research Institute observed the traffic operations at the Interstate 29 (1-29) and Interstate 80 (1-80) interchange in the southwest part of Council Bluffs. The general location of the site is shown in Figure 1. Before limiting the analysis to the diverging area the project staff drove the entire Council Bluffs freeway system and consulted with M r . Philip Hassenstab (Iowa State Highway Commission, District 4, Resident Maintenance Engineer at Council Bluffs). The final study scope was delineated as encompassing only the operational characteristics of the diverge area where 1-29 South and 1-80 East divide and the ramp to merge area where 1-80 West joins 1-29 North (both areas being contained within the aforementioned interchange). Supplementing the traffic operations scope, was an effort to delineate and document the applicability of video-tape techniques to traffic engineering studies and analyses. Documentation was primarily in the form of a demonstration video-tape.

Formato

pdf

Identificador

http://publications.iowa.gov/11392/1/hr166.pdf

(1974) Final Report-Freeway Operations Analysis of I-80 to I-29 Interchange, January 1974. Transportation, Department of

Idioma(s)

en

Relação

http://publications.iowa.gov/11392/

Palavras-Chave #Research #Roads and highways #Design and Construction #Transportation
Tipo

Departmental Report

NonPeerReviewed