1000 resultados para setup time
Resumo:
Setup time reduction facilitate the flexibility needed for just-in-time production. An integrated steel mill with meltshop, continuous caster and hot rolling mill is often operated as decoupled processes. Setup time reduction provides the flexibility needed to reduce buffering, shorten lead times and create an integrated process flow. The interdependency of setup times, process flexibility and integration were analysed through system dynamics simulation. The results showed significant reductions of energy consumption and tied capital. It was concluded that setup time reduction in the hot strip mill can aid process integration and hence improve production economy while reducing environmental impact.
Resumo:
This paper addresses the feasibility of implementing Japanese manufacturing systems in the United States. The recent success of Japanese transplant companies suggests that Just-In-Time (JIT) production is possible within America's industrial environment. Once American workers receive proper training, they have little difficulty participating in rapid setup procedures and utilizing the kanban system. Japanese transplants are gradually developing Japanese-style relationships with their American supplier companies by initiating long-term, mutually beneficial agreements. They are also finding ways to cope with America's problem of distance, which is steadily decreasing as an obstacle to JIT delivery. American companies, however, encounter Significant problems in trying to convert traditionally organized, factories to the JIT system. This paper demonstrates that it is both feasible and beneficial for American manufacturers to implement JIT production techniques. Many of the difficulties manufacturers experience center around a general lack of information about JIT. Once a company realizes its potential for setup-time reduction, a prerequisite for the JIT system, workers and managers can work together to create a new process for handling equipment changeover. Significant results are possible with minimal investment. Also, supervisors often do not realize that the JIT method of ordering goods from suppliers is compatible with current systems. This "kanban system" not only enhances current systems but also reduces the amount of paperwork and scheduling involved. When arranging JlT delivery of supplier goods, American manufacturers tend to overlook important aspects of JIT supplier management. However, by making long-tenn commitments, initiating the open exchange of information, assisting suppliers in reaching new standards of performance, increasing the level of conununication, and relying more on suppliers' engineering capabilities, even American manufacturers can develop Japanese-style supplier relationships that enhance the effectiveness of the system.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Currently the market requires companies to adapt for they can have the lowest possible cost in their manufacturing, be it a good or service, thus obtaining a greater profit. For this profit the Toyota Production System applies lean manufacturing practices actions with reduced spending, smaller lots and stocks, generated by market demand. The technique allows SMED with few actions, changes and investments that time does not exceed one digit on your total time. This case study shows that only with standardization and use of inexpensive improvements, could reduce setup time on a machine for 70 minutes to time of approximately 48 minutes with little investment, demonstrating the viability of the tool presented
Resumo:
The current competitive market requires companies to adapt so that they can meet the needs of customers in an agile manner and aimed at the lowest possible cost in their manufacture, be it a product or service. The Toyota Production System is aimed at higher profits through lean manufacturing practices with reduced spending, smaller lots and inventories, generated by market demand. The variety of products makes the setup of the equipment a critical point and it should be reduced as much as possible so it does not affect productivity. The rapid exchange of tools allows with few actions and a modification that time does not exceed one digit on your total time. In this study, a case study showed that only with standardization and use of cheap improvements made it possible to reduce setup time in bottle labeling machine by 98 minutes for a final time of approximately 10 minutes with little investment, demonstrating the feasibility the displayed and a monthly gain tool in bottles at approximately 120,000, generating a performance gain and budget of approximately R$ 94,000.00 per month
Resumo:
The current competitive market requires companies to adapt so that they can meet the needs of customers in an agile manner and aimed at the lowest possible cost in their manufacture, be it a product or service. The Toyota Production System is aimed at higher profits through lean manufacturing practices with reduced spending, smaller lots and inventories, generated by market demand. The variety of products makes the setup of the equipment a critical point and it should be reduced as much as possible so it does not affect productivity. The rapid exchange of tools allows with few actions and a modification that time does not exceed one digit on your total time. In this study, a case study showed that only with standardization and use of cheap improvements made it possible to reduce setup time in bottle labeling machine by 98 minutes for a final time of approximately 10 minutes with little investment, demonstrating the feasibility the displayed and a monthly gain tool in bottles at approximately 120,000, generating a performance gain and budget of approximately R$ 94,000.00 per month
Resumo:
Different heating systems have been used in pultrusion, where the most widely used heaters are planar resistances. The primary objective of this study was to develop an improved heating system and compare its performance with that of a system with planar resistances. In this study, thermography was used to better understand the temperature profile along the die. Finite element analysis was performed to determine the amount of energy consumed by the heating systems. Improvements were made to the die to test the new heating system, and it was found that the new system reduced the setup time and energy consumption by approximately 57%.
Resumo:
The global warming due to high CO2 emission in the last years has made energy saving a global problem nowadays. However, manufacturing processes such as pultrusion necessarily needs heat for curing the resin. Then, the only option available is to apply all efforts to make the process even more efficient. Different heating systems have been used on pultrusion, however, the most widely used are the planar resistances. The main objective of this study is to develop another heating system and compares it with the former one. Thermography was used in spite of define the temperature profile along the die. FEA (finite element analysis) allows to understand how many energy is spend with the initial heating system. After this first approach, changes were done on the die in order to test the new heating system and to check possible quality problems on the product. Thus, this work allows to conclude that with the new heating system a significant reduction in the setup time is now possible and an energy reduction of about 57% was achieved.
Resumo:
Dissertação apresentada na Faculdade de Ciência e Tecnologia da Universidade Nova de Lisboa para a obtenção do grau de Mestre em Engenharia Electrotécnica e de Computadores
Resumo:
This work presents an automatic calibration method for a vision based external underwater ground-truth positioning system. These systems are a relevant tool in benchmarking and assessing the quality of research in underwater robotics applications. A stereo vision system can in suitable environments such as test tanks or in clear water conditions provide accurate position with low cost and flexible operation. In this work we present a two step extrinsic camera parameter calibration procedure in order to reduce the setup time and provide accurate results. The proposed method uses a planar homography decomposition in order to determine the relative camera poses and the determination of vanishing points of detected lines in the image to obtain the global pose of the stereo rig in the reference frame. This method was applied to our external vision based ground-truth at the INESC TEC/Robotics test tank. Results are presented in comparison with an precise calibration performed using points obtained from an accurate 3D LIDAR modelling of the environment.
Resumo:
Dissertação de mestrado integrado em Engenharia e Gestão Industrial
Resumo:
Dissertação de mestrado integrado em Engenharia e Gestão Industrial
Resumo:
Dissertação de mestrado integrado em Engenharia e Gestão Industrial
Resumo:
Dissertação de mestrado em Engenharia Industrial
Resumo:
The General Assembly Line Balancing Problem with Setups (GALBPS) was recently defined in the literature. It adds sequence-dependent setup time considerations to the classical Simple Assembly Line Balancing Problem (SALBP) as follows: whenever a task is assigned next to another at the same workstation, a setup time must be added to compute the global workstation time, thereby providing the task sequence inside each workstation. This paper proposes over 50 priority-rule-based heuristic procedures to solve GALBPS, many of which are an improvement upon heuristic procedures published to date.