Heuristic procedures for solving the General Assembly Line Balancing Problem with Setups (GALBPS)
Contribuinte(s) |
Universitat Politècnica de Catalunya. Institut d'Organització i Control de Sistemes Industrials Universitat Politècnica de Catalunya. EOLI - Enginyeria d´Organització i Logística Industrial |
---|---|
Data(s) |
10/05/2012
|
Resumo |
The General Assembly Line Balancing Problem with Setups (GALBPS) was recently defined in the literature. It adds sequence-dependent setup time considerations to the classical Simple Assembly Line Balancing Problem (SALBP) as follows: whenever a task is assigned next to another at the same workstation, a setup time must be added to compute the global workstation time, thereby providing the task sequence inside each workstation. This paper proposes over 50 priority-rule-based heuristic procedures to solve GALBPS, many of which are an improvement upon heuristic procedures published to date. |
Identificador | |
Idioma(s) |
eng |
Direitos |
Consulteu les condicions d'ús d'aquest document en el repositori original:<a href="http://hdl.handle.net/2117/1555">http://hdl.handle.net/2117/1555</a> |
Palavras-Chave | #Àrees temàtiques de la UPC::Economia i organització d'empreses::Direcció d’operacions #Assembly-line balancing #Assembly line balancing #Sequence-dependent setup times #GALBPS #Treball en cadena #Treball en cadena |
Tipo |
info:eu-repo/semantics/report |