Heuristic procedures for solving the General Assembly Line Balancing Problem with Setups (GALBPS)


Autoria(s): Martino, Luigi; Pastor Moreno, Rafael
Contribuinte(s)

Universitat Politècnica de Catalunya. Institut d'Organització i Control de Sistemes Industrials

Universitat Politècnica de Catalunya. EOLI - Enginyeria d´Organització i Logística Industrial

Data(s)

10/05/2012

Resumo

The General Assembly Line Balancing Problem with Setups (GALBPS) was recently defined in the literature. It adds sequence-dependent setup time considerations to the classical Simple Assembly Line Balancing Problem (SALBP) as follows: whenever a task is assigned next to another at the same workstation, a setup time must be added to compute the global workstation time, thereby providing the task sequence inside each workstation. This paper proposes over 50 priority-rule-based heuristic procedures to solve GALBPS, many of which are an improvement upon heuristic procedures published to date.

Identificador

http://hdl.handle.net/2117/1555

Idioma(s)

eng

Direitos

Consulteu les condicions d'ús d'aquest document en el repositori original:<a href="http://hdl.handle.net/2117/1555">http://hdl.handle.net/2117/1555</a>

Palavras-Chave #Àrees temàtiques de la UPC::Economia i organització d'empreses::Direcció d’operacions #Assembly-line balancing #Assembly line balancing #Sequence-dependent setup times #GALBPS #Treball en cadena #Treball en cadena
Tipo

info:eu-repo/semantics/report