876 resultados para project planning and controlling


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article presents an extensive investigation carried out in two technology-based companies of the So Carlos technological pole in Brazil. Based on this multiple case study and literature review, a method, entitled hereafter IVPM2, applying agile project management (APM) principles was developed. After the method implementation, a qualitative evaluation was carried out by a document analysis and questionnaire application. This article shows that the application of this method at the companies under investigation evidenced the benefits of using simple, iterative, visual, and agile techniques to plan and control innovative product projects combined with traditional project management best practices, such as standardization.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Production Planning and Control (PPC) systems have grown and changed because of the developments in planning tools and models as well as the use of computers and information systems in this area. Though so much is available in research journals, practice of PPC is lagging behind and does not use much from published research. The practices of PPC in SMEs lag behind because of many reasons, which need to be explored This research work deals with the effect of identified variables such as forecasting, planning and control methods adopted, demographics of the key person, standardization practices followed, effect of training, learning and IT usage on firm performance. A model and framework has been developed based on literature. Empirical testing of the model has been done after collecting data using a questionnaire schedule administered among the selected respondents from Small and Medium Enterprises (SMEs) in India. Final data included 382 responses. Hypotheses linking SME performance with the use of forecasting, planning and controlling were formed and tested. Exploratory factor analysis was used for data reduction and for identifying the factor structure. High and low performing firms were classified using a Logistic Regression model. A confirmatory factor analysis was used to study the structural relationship between firm performance and dependent variables.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Planning a project with proper considerations of all necessary factors and managing a project to ensure its successful implementation will face a lot of challenges. Initial stage in planning a project for bidding a project is costly, time consuming and usually with poor accuracy on cost and effort predictions. On the other hand, detailed information for previous projects may be buried in piles of archived documents which can be increasingly difficult to learn from the previous experiences. Project portfolio has been brought into this field aiming to improve the information sharing and management among different projects. However, the amount of information that could be shared is still limited to generic information. This paper, we report a recently developed software system COBRA to automatically generate a project plan with effort estimation of time and cost based on data collected from previous completed projects. To maximise the data sharing and management among different projects, we proposed a method of using product based planning from PRINCE2 methodology. (Automated Project Information Sharing and Management System -�COBRA) Keywords: project management, product based planning, best practice, PRINCE2

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A válság okozta megszorítások a projektek költségvetését sem hagyták változatlanul. Nagyon sokszor nemcsak a jövőbeni projekttervek költségvetését kell átgondolni, hanem a már futó projektek költségvetését is újra kell szabni. E tanulmány ilyen esetekben nyújthat módszertani támogatást. A szerző ebben a kutatásban négy költség- és időcsökkentő módszert hasonlít össze. Ismerteti, hogy ezeket az eljárásokat milyen módon lehet ötvözni, illetve mikor, melyiket célszerű alkalmazni. Az eljárások között van olyan módszer, amely a hagyományos projektmenedzsment (pl. építési, beruházási projektek menedzselésének) eszköztárát gazdagítja, de találkozhatunk olyan eljárásokkal is, amelyek az agilis projektszemléleten alapuló módszerek körét szélesítik. A bemutatott módszerek nemcsak a hálótervezési, hanem a mátrixos projekttervezési eljárások esetén is alkalmazhatók. ____ Due to the effects of the crisis, budgets of present as well as future projects are decreasing steadily. In this study four different methods are introduced for minimising budget and time demands. These introduced methods support not only the traditional but also the agile project management. Furthermore these methods can be used not only in case of network planning, but also for matrix-based project planning.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Production Planning and Control (PPC) systems have grown and changed because of the developments in planning tools and models as well as the use of computers and information systems in this area. Though so much is available in research journals, practice of PPC is lagging behind and does not use much from published research. The practices of PPC in SMEs lag behind because of many reasons, which need to be explored. This research work deals with the effect of identified variables such as forecasting, planning and control methods adopted, demographics of the key person, standardization practices followed, effect of training, learning and IT usage on firm performance. A model and framework has been developed based on literature. Empirical testing of the model has been done after collecting data using a questionnaire schedule administered among the selected respondents from Small and Medium Enterprises (SMEs) in India. Final data included 382 responses. Hypotheses linking SME performance with the use of forecasting, planning and controlling were formed and tested. Exploratory factor analysis was used for data reduction and for identifying the factor structure. High and low performing firms were classified using a Logistic Regression model. A confirmatory factor analysis was used to study the structural relationship between firm performance and dependent variables.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Tutkimuksen tarkoituksena on kuvata ja ymmärtää kuinka sisäisiä kehityshankkeita voidaan hallita onnistuneesti kun toimitaan nopeasti muuttuvassa ympäristössä. Tutkimus kuvailee etenkin projekteille tärkeitä menestymistekijöitä, kuten suunnittelu, kontrollointi ja päätöksenteko. Tutkimus selvittää yleisimmät ongelma-alueet case-organisaation sisäisten kehityshankkeiden hallinnassa. Tutkimus on luonteeltaan laadullinen tutkimus, jossa tutkimusmenetelmänä on käytetty tapaustutkimusta. Empiirisessa osassa käsittellään case-organisaation sisäisiä informaatioteknologia-hankkeita (IT) ja uusien konseptien kehityshankkeita (NCD). iSisäisten kehityshankkeiden erilaisuuden ymmärtäminen oli tutkimuksen tärkein tulos. Tutkimuksen empiirinen osio osoitti sen, että epävarmuudella on erittäin suuri vaikutus projektihallintaan sekä projektin kontrollointiin. Case-organisaation IT-projektien onnistuminen riippuu organisaatiomuu-toksen onnistumisesta. Asiakkaisiin ja markkinoihin liittyvät epävarmuudet ovat vaikuttavimmat NCD projektien epävarmuuksista. Näillä epävarmuuk-sil­la on vaikutusta projektihallintaan jonka myötä NCD projektit juuttuvat useim­mi­ten noidankehiin tai ne lopetetaan jo aikaisessa vaiheessa.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this research was to improve the quantitative support to project planning and control principally through the use of more accurate forecasting for which new techniques were developed. This study arose from the observation that in most cases construction project forecasts were based on a methodology (c.1980) which relied on the DHSS cumulative cubic cost model and network based risk analysis (PERT). The former of these, in particular, imposes severe limitations which this study overcomes. Three areas of study were identified, namely growth curve forecasting, risk analysis and the interface of these quantitative techniques with project management. These fields have been used as a basis for the research programme. In order to give a sound basis for the research, industrial support was sought. This resulted in both the acquisition of cost profiles for a large number of projects and the opportunity to validate practical implementation. The outcome of this research project was deemed successful both in theory and practice. The new forecasting theory was shown to give major reductions in projection errors. The integration of the new predictive and risk analysis technologies with management principles, allowed the development of a viable software management aid which fills an acknowledged gap in current technology.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The State of Iowa currently has approximately 69,000 miles of unpaved secondary roads. Due to the low traffic count on these unpaved o nts as ng e two dust ed d roads, paving with asphalt or Portland cement concrete is not economical. Therefore to reduce dust production, the use of dust suppressants has been utilized for decades. This study was conducted to evaluate the effectiveness of several widely used dust suppressants through quantitative field testing on two of Iowa’s most widely used secondary road surface treatments: crushed limestone rock and alluvial sand/gravel. These commercially available dust suppressants included: lignin sulfonate, calcium chloride, and soybean oil soapstock. These suppressants were applied to 1000 ft test sections on four unpaved roads in Story County, Iowa. Tduplicate field conditions, the suppressants were applied as a surface spray once in early June and again in late August or early September. The four unpaved roads included two with crushed limestone rock and two with alluvial sand/gravel surface treatmewell as high and low traffic counts. The effectiveness of the dust suppressants was evaluated by comparing the dust produced on treated and untreated test sections. Dust collection was scheduled for 1, 2, 4, 6, and 8 weeks after each application, for a total testiperiod of 16 weeks. Results of a cost analysis between annual dust suppressant application and biennial aggregate replacement indicated that the cost of the dust suppressant, its transportation, and application were relatively high when compared to that of thaggregate types. Therefore, the biennial aggregate replacement is considered more economical than annual dust suppressant application, although the application of annual dust suppressant reduced the cost of road maintenance by 75 %. Results of thecollection indicated that the lignin sulfonate suppressant outperformed calcium chloride and soybean oil soapstock on all four unpavroads, the effect of the suppressants on the alluvial sand/gravel surface treatment was less than that on the crushed limestone rock, the residual effects of all the products seem reasonably well after blading, and the combination of alluvial sand/gravel surface treatment anhigh traffic count caused dust reduction to decrease dramatically.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Includes bibliography

Relevância:

100.00% 100.00%

Publicador: