839 resultados para in-house maintenance projects
Resumo:
IEEE, IEEE Comp Soc, Tech Council Software Engn
Resumo:
Knowledge processes are critical to outsourced software projects. According to outsourcing research, outsourced software projects succeed if they manage to integrate the client’s business knowledge and the vendor’s technical knowledge. In this paper, we submit that this view may not be wrong, but incomplete in a significant part of outsourced software work, which is software maintenance. Data from six software-maintenance outsourcing transitions indicate that more important than business or technical knowledge can be application knowledge, which vendor engineers acquire over time during practice. Application knowledge was the dominant knowledge during knowledge transfer activities and its acquisition enabled vendor staff to solve maintenance tasks. We discuss implications for widespread assumptions in outsourcing research.
Resumo:
Includes sample.
Resumo:
Different procurement decisions taken by relief organizations can result in considerably different implications in regards to transport, storage, and distribution of humanitarian aid and ultimately can influence the performance of the humanitarian supply chain and the delivery of the humanitarian aid. In this article, we look into what resources are needed and how these resources evolve in the delivery of humanitarian aid. Drawing on the resource-based view of the firm, we develop a framework to categorize the impact of local resources on the configuration of humanitarian supply chains. In contrast to other papers, the importance of localizing the configuration of the humanitarian supply chain is not only conceptually recognized, but empirical investigations are also provided. In terms of methodology, this article is based on the analysis of secondary data from two housing reconstruction projects. Findings indicate that the use of local resources in humanitarian aid has positive effects on programs' overall supply chain performance and these effects are not only related to the macroeconomic perspective, but benefits expand to improvements related to the use of knowledge. At the same time, it was found that local sourcing often comes with a number of problems. For example, in one of the cases, significant problems existed, which were related to the scarcity of local supplies. Both housing reconstruction projects have indicated the continuous need for changes throughout the programs as a dynamic supply chain configuration is important for the long-term sustainability of reconstruction aid. © 2014 Decision Sciences Institute.
Resumo:
The design-build (DB) delivery system is an effective means of delivering a green construction project and selecting an appropriate contractor is critical to project success. Moreover, the delivery of green buildings requires specific design, construction and operation and maintenance considerations not generally encountered in the procurement of conventional buildings. Specifying clear sustainability requirements to potential contractors is particularly important in achieving sustainable project goals. However, many client/owners either do not explicitly specify sustainability requirements or do so in a prescriptive manner during the project procurement process. This paper investigates the current state-of-the-art procurement process used in specifying the sustainability requirements of the public sector in the USA construction market by means of a robust content analysis of 40 design-build requests for proposals (RFPs). The results of the content analysis indicate that the sustainability requirement is one of the most important dimensions in the best-value evaluation of DB contractors. Client/owners predominantly specify the LEED certification levels (e.g. LEED Certified, Silver, Gold, and Platinum) for a particular facility, and include the sustainability requirements as selection criteria (with specific importance weightings) for contractor evolution. Additionally, larger size projects tend to allocate higher importance weightings to sustainability requirements.This study provides public DB client/owners with a number of practical implications for selecting appropriate design-builders for sustainable DB projects.
Resumo:
Safety of repair, maintenance, alteration, and addition (RMAA) works have long been neglected because RMAAworks are often minute and only last for a short period of time. With rising importance of the RMAA sector in many developed societies, safety of RMAA works has begun to draw attention. Many RMAA contracting companies are small- and medium-sized enterprises (SMEs) that do not have comprehensive safety management systems. Existing safety legislation and regulations for new construction sites are not fully applicable to RMAAworks. Instead of relying on explicit and well-established safety systems, tacit safety knowledge plays an extremely important role in RMAA projects. To improve safety of RMAAworks, safety knowledge should be better managed. However, safety knowledge is difficult to capture in RMAA works. This study aims to examine safety management practices of RMAA contracting companies to see how safety knowledge of RMAA projects is managed. Findings show that RMAA contracting companies undertaking large-scale RMAA projects have more initiatives of safety management. Safety management of small-scale RMAA works relies heavily on the motivation of site supervisors and self-regulation of workers. Better tacit knowledge management improves safety performance. To enhance safety capability of RMAA contracting companies, a knowledge sharing culture should be cultivated. The government should provide assistance to SMEs to implement proper safety management practices in small-sized projects. Potentials of applying computer software technology in RMAA projects to capture, store, and retrieve safety information should be explored. Employees should be motivated to share safety knowledge by giving proper recognition to those who are willing to share.
Resumo:
Software-maintenance offshore outsourcing (SMOO) projects have been plagued by tedious knowledge transfer during the service transition to the vendor. Vendor engineers risk being over-strained by the high amounts of novel information, resulting in extra costs that may erode the business case behind offshoring. Although stakeholders may desire to avoid these extra costs by implementing appropriate knowledge transfer practices, little is known on how effective knowledge transfer can be designed and managed in light of the high cognitive loads in SMOO transitions. The dissertation at hand addresses this research gap by presenting and integrating four studies. The studies draw on cognitive load theory, attributional theory, and control theory and they apply qualitative, quantitative, and simulation methods to qualitative data from eight in-depth longitudinal cases. The results suggest that the choice of appropriate learning tasks may be more central to knowledge transfer than the amount of information shared with vendor engineers. Moreover, because vendor staff may not be able to and not dare to effectively self-manage learn-ing tasks during early transition, client-driven controls may be initially required and subsequently faded out. Collectively, the results call for people-based rather than codification-based knowledge management strategies in at least moderately specific and complex software environments.
Resumo:
The existing literature suggests that transitions in software-maintenance offshore outsourcing projects are prone to knowledge transfer blockades, i.e. situations in which the activities that would yield effective knowledge transfer do not occur, and that client management involvement is central to overcome them. However, the theoretical understanding of the knowledge transfer blockade is limited, and the reactive management behavior reported in case studies suggests that practitioners may frequently be astonished by the dynamics that may give rise to the blockade. Drawing on recent research from offshore sourcing and reference theories, this study proposes a system dynamics framework that may explain why knowledge transfer blockades emerge and how and why client management can overcome the blockade. The results suggest that blockades may emerge from a vicious circle of weak learning due to cognitive overload of vendor staff and resulting negative ability attributions that result in reduced helping behavior and thus aggravate cognitive load. Client management may avoid these vicious circles by selecting vendor staff with strong prior related experience. Longer phases of coexistence of vendor staff and subject matter experts and high formal and clan controls may also mitigate vicious circles.
Resumo:
Mode of access: Internet.
Resumo:
This paper aims to present a state-of-the-art review of the scope and practical implications of the Building Information Modelling (BIM) platform in the UK construction practice. Theoretical developments suggest that BIM is an integration of both product and process innovation, not just a disparate set of software tools. BIM provides effective collaboration, visual representation and data management, which enable the smooth flow of information throughout the project’s lifecycle. The most frequently reported benefits are related to Capital Cost (capex) and Operational costs (opex) and time savings. Key challenges, however, focus on the interoperability of software, capital installation costs, in-house experience, client preference and cultural issues within design teams and within the organisation. The paper concludes with a critical commentary on the changing roles and a process required to implement BIM in UK construction projects, and suggests areas for further research.
Resumo:
Enterprise System (ES) implementation and management are knowledge intensive tasks that inevitably draw upon the experience of a wide range of people with diverse knowledge capabilities. Knowledge Management (KM) has been identified as a critical success factor in ES projects. Despite the recognized importance of managing knowledge for ES benefits realization, systematic attempts to conceptualize KM-structures have been few. Where the adequacy of KM-structures is assessed, the process and measures are typically idiosyncratic and lack credibility. Using the ‘KM-process’, itself based in sociology of knowledge, this paper conceptualizes four main constructs to measure the adequacy of KM-structures. The SEM model is tested using 310 responses gathered from 27 ES installations that had implemented SAP R/3. The findings reveal six constructs for KM-structure. Furthermore, the paper demonstrates the application of KM-structures in the context of ES using the Adaptive Structuration Theory. The results demonstrate that having adequate KM-structures in place, while necessary, is not sufficient. These rules and resources must be appropriated to have greater positive influence on the Enterprise System. Furthermore, the study provides empirical support for knowledge-based theory by illustrating the importance of knowledge use/re-use (vs. knowledge creation) as the most important driver in the process of KM.