872 resultados para Uncertain demand


Relevância:

100.00% 100.00%

Publicador:

Resumo:

We consider a quantity-setting duopoly model, and we study the decision to move first or second, by assuming that the firms produce differentiated goods and that there is some demand uncertainty. The competitive phase consists of two periods, and in either period, the firms can make a production decision that is irreversible. As far as the firms are allowed to choose (non-cooperatively) the period they make the decision, we study the circumstances that favour sequential rather than simultaneous decisions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We consider a quantity-setting duopoly model, and we study the decision to move first or second, by assuming that. the firms produce homogeneous goods and that. there is some demand uncertainty. The competitive phase consists of two periods, and in either period, the firms can make a production decision that is irreversible. As far as the firms are allowed to choose (non-cooperatively) the period they make the decision, we study the circumstances that favour sequential rather than simultaneous decisions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We consider a differentiated Stackelberg model with demand uncertainty only for the first mover. We study the advantages of flexibility over leadership as the degree of the differentiation of the goods changes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper focuses on the railway rolling stock circulation problem in rapid transit networks where the known demand and train schedule must be met by a given fleet. In rapid transit networks the frequencies are high and distances are relatively short. Although the distances are not very large, service times are high due to the large number of intermediate stops required to allow proper passenger flow. The previous circumstances and the reduced capacity of the depot stations and that the rolling stock is shared between the different lines, force the introduction of empty trains and a careful control on shunting operation. In practice the future demand is generally unknown and the decisions must be based on uncertain forecast. We have developed a stochastic rolling stock formulation of the problem. The computational experiments were developed using a commercial line of the Madrid suburban rail network operated by RENFE (The main Spanish operator of suburban trains of passengers). Comparing the results obtained by deterministic scenarios and stochastic approach some useful conclusions may be obtained.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Mestre em Engenharia e Gestão Industrial

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In this paper, we consider a Cournot competition between a nonprofit firm and a for-profit firm in a homogeneous goods market, with uncertain demand. Given an asymmetric tax schedule, we compute explicitly the Bayesian-Nash equilibrium. Furthermore, we analyze the effects of the tax rate and the degree of altruistic preference on market equilibrium outcomes.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In this paper, we consider a mixed market with uncertain demand, involving one private firm and one public firm with quadratic costs. The model is a two-stage game in which players choose to make their output decisions either in stage 1 or stage 2. We assume that the demand is unknown until the end of the first stage. We compute the output levels at equilibrium in each possible role. We also determine ex-ante and ex-post firms’ payoff functions.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper considers a Cournot competition between a nonprofit firm and a for-profit firm in a homogeneous goods market, with uncertain demand. Given an asymmetric tax schedule, we compute explicitly the Bayesian-Nash equilibrium. Furthermore, we analize the effects of the tax rate and the degree of altruistic preference on market equilibrium outcomes.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Recent theoretical developments on concession contracts for long term infrastructure projects under uncertain demand show the benefits of allowing for flexible term contracts rather than fixing a rigid term. This study presents a simulation to compare both alternatives by using real data from the oldest Spanish toll motorway. For this purpose, we analyze how well the flexible term would have performed instead of the fixed length actually established. Our results show a huge reduction of the term of concession that would have dramatically decreased the firm’s benefits and the user’s overpayment due to the internalization of an unexpected traffic increase.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This study is motivated by the proposition that the objectives of the AWB Ltd have changed since semi-privatisation of the Australian Wheat Board under the Wheat Marketing Act, 1989. Conceptualising this change of objectives as a shift from revenue maximization to profit maximization, this study examines the impact of such a change on the pricing policies of a multi-market price-setting firm. More specifically, this paper investigates, using two hypothetical objective functions, a risk averse AWB�s price-setting behaviour in an �overseas� and a �domestic� market in response to recent wheat industry developments. In the analysis these developments manifest themselves as differing price elasticities, differing transport costs and uncertain demand functions, and their implications particularly for the prices paid by domestic consumers are explored.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper presents a methodology and a mathematical model to solve the expansion planning problem that takes into account the effect of contingencies in the planning stage, and considers the demand as a stochastic variable within a specified range. In this way, it is possible to find a solution that minimizes the investment costs guarantying reliability and minimizing future load shedding. The mathematical model of the expansion planning can be represented by a mixed integer nonlinear programming problem. To solve this problem a specialized Genetic Algorithm combined with Linear Programming was implemented.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Recently, Branzei, Dimitrov, and Tijs (2003) introduced cooperative interval-valued games. Among other insights, the notion of an interval core has been coined and proposed as a solution concept for interval-valued games. In this paper we will present a general mathematical programming algorithm which can be applied to find an element in the interval core. As an example, we discuss lot sizing with uncertain demand to provide an application for interval-valued games and to demonstrate how interval core elements can be computed. Also, we reveal that pitfalls exist if interval core elements are computed in a straightforward manner by considering the interval borders separately.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Inventory control in complex manufacturing environments encounters various sources of uncertainity and imprecision. This paper presents one fuzzy knowledge-based approach to solving the problem of order quantity determination, in the presence of uncertain demand, lead time and actual inventory level. Uncertain data are represented by fuzzy numbers, and vaguely defined relations between them are modeled by fuzzy if-then rules. The proposed representation and inference mechanism are verified using a large numbers of examples. The results of three representative cases are summarized. Finally a comparison between the developed fuzzy knowledge-based and traditional, probabilistic approaches is discussed.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Vendor-managed inventory (VMI) is a widely used collaborative inventory management policy in which manufacturers manages the inventory of retailers and takes responsibility for making decisions related to the timing and extent of inventory replenishment. VMI partnerships help organisations to reduce demand variability, inventory holding and distribution costs. This study provides empirical evidence that significant economic benefits can be achieved with the use of a genetic algorithm (GA)-based decision support system (DSS) in a VMI supply chain. A two-stage serial supply chain in which retailers and their supplier are operating VMI in an uncertain demand environment is studied. Performance was measured in terms of cost, profit, stockouts and service levels. The results generated from GA-based model were compared to traditional alternatives. The study found that the GA-based approach outperformed traditional methods and its use can be economically justified in small- and medium-sized enterprises (SMEs).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The economic and financial crisis in Europe is affecting the financing of long-term infrastructure investment. There are multiple clearly identifiable channels: reduced demand for long-term investment, a tightening prudential framework for lending, upward adjustment of risk perception, complex transition of the financial system, and increasing macroeconomic, sovereign and regulatory risk. Some of the identified channels are potentially dangerous spillovers from the crisis that entail the risk of a downward spiral (eg increasing regulatory risk), while others are efficient market responses (eg reduced investment demand, correction of pricing of risk). Consequently, public policy instruments should not address the accessibility of long-term finance per se, but should explicitly target the critical channels.