957 resultados para Traditional construction
Resumo:
A Mass Customisation model is discussed as a competitive positioning strategy in the marketplace adding value to the customer’s end-use. It includes the user as part of the construction process responding to the customer’s demands and wishes. To the present day, almost all proposals for Mass Customisation have been focused on the design phase and single family houses. The reality is that the processes carried out in the work execution are so inefficient that the costs of the Mass Customisation models are assumed by the customer and they do not offer solutions that support the change management. Furthermore, this inefficiency often makes Mass Customisation unfeasible in terms of deadlines and site management. Therefore, the present proposal focuses on achieving the paradigm of Mass Customisation in the traditional residential construction complementary to the existing proposals in the design phase. All this through the proposal of a framework for the integral management in the work execution, which will address change management introduced by the users offering an efficient and productive model that reduces costs in the process. This model will focus on the synergy between different strategies, techniques and technologies currently used in the construction management (such as Lean Construction or Six Sigma), together with, other strategies and technologies that have proven to be valid solutions in other fields (such as Business Process Management, Service Oriented Architecture, etc.).
Resumo:
Construction delays are a critical problem for Malaysian public sector projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This paper reports the progress to date of a Ph.D. research project aimed at developing a framework to utilize Supply Chain Management (SCM) tools to improve the time performance of Malaysian Government projects. The potential of SCM has been identified for public sector governance and its use in Malaysia is now being considered within the strategy of the Malaysian Construction Industry Master Plan (2006-2015). Encouraged by success in the UK, there is a cautious optimism concerning the successful application of SCM in Malaysia. This paper considers delay as a problem in Malaysian public sector projects, establishes the need to embrace SCM and then elucidates the need and strategies for the development of a delay reduction framework. A literature review, survey mechanism and structured interview schedule will be undertaken to achieve the research objectives. The final research outcome will be a framework that addresses root delay contributors (“pathogens”) and applies SCM tools for their mitigation.
Resumo:
Construction contracts often provide that the decision of an independent certifier is final and binding. The effect of a contractual term like this has been debated in the courts over time. This paper considers the binding nature of certificates in the context of traditional construction contract arrangements and also considers the implications for more complex contracts like those entered into to facilitate public private partnerships. This article considers the response of the courts and the drafting implications and argues that a different focus would be advantageous.
Resumo:
Construction contracts often provide that decisions under the contract will be made by a certifier. This paper reviews the liability issues when a certifier makes a mistake. We do that in light of recent pronouncements by the High Court of Australia and the New South Wales Court of Appeal on negligence. We look at this question in the context of traditional construction contract arrangements and also consider the implications for Public Private Partnerships and the typical contract arrangements entered into to facilitate these transactions.
Resumo:
3D printing (3Dp) has long been used in the manufacturing sector as a way to automate, accelerate production and reduce waste materials. It is able to build a wide variety of objects if the necessary specifications are provided to the printer and no problems are presented by the limited range of materials available. With 3Dp becoming cheaper, more reliable and, as a result, more prevalent in the world at large, it may soon make inroads into the construction industry. Little is known however, of 3Dp in current use the construction industry and its potential for the future and this paper seeks to rectify this situation by providing a review of the relevant literature. In doing this, the three main 3Dp methods of contour crafting, concrete printing and D-shape 3Dp are described which, as opposed to the traditional construction method of cutting materials down to size, deliver only what is needed for completion, vastly reducing waste. Also identified is 3Dp’s potential to enable buildings to be constructed many times faster and with significantly reduced labour costs. In addition, it is clear that construction 3Dp can allow the further inclusion of Building Information Modelling into the construction process - streamlining and improving the scheduling requirements of a project. However, current 3Dp processes are known to be costly, unsuited to large-scale products and conventional design approaches, and have a very limited range of materials that can be used. Moreover, the only successful examples of construction in action to date have occurred in controlled laboratory environments and, as real world trials have yet to be completed, it is yet to be seen whether it can be it equally proficient in practical situations. Key Words: 3D Printing; Contour Crafting; Concrete Printing; D-shape; Building Automation.
Resumo:
Purpose Traditional construction planning relies upon the critical path method (CPM) and bar charts. Both of these methods suffer from visualization and timing issues that could be addressed by 4D technology specifically geared to meet the needs of the construction industry. This paper proposed a new construction planning approach based on simulation by using a game engine. Design/methodology/approach A 4D automatic simulation tool was developed and a case study was carried out. The proposed tool was used to simulate and optimize the plans for the installation of a temporary platform for piling in a civil construction project in Hong Kong. The tool simulated the result of the construction process with three variables: 1) equipment, 2) site layout and 3) schedule. Through this, the construction team was able to repeatedly simulate a range of options. Findings The results indicate that the proposed approach can provide a user-friendly 4D simulation platform for the construction industry. The simulation can also identify the solution being sought by the construction team. The paper also identifies directions for further development of the 4D technology as an aid in construction planning and decision-making. Research limitations/implications The tests on the tool are limited to a single case study and further research is needed to test the use of game engines for construction planning in different construction projects to verify its effectiveness. Future research could also explore the use of alternative game engines and compare their performance and results. Originality/value The authors proposed the use of game engine to simulate the construction process based on resources, working space and construction schedule. The developed tool can be used by end-users without simulation experience.
Resumo:
L’introduction du développement durable apporte de nouvelles préoccupations environnementales au niveau de la construction et de la rénovation résidentielles, une industrie qui représente un marché économique important au Canada. En plus d’engendrer plusieurs impacts sur l’environnement, la conception actuelle ne permet pas d’accommoder le changement initié par l’évolution des pratiques, les avancées technologiques, mais également par l’évolution des patrons de vie des occupants. Dans un premier temps, la revue de littérature dresse le portrait de l’industrie de la construction, rénovation et démolition (CRD) au Canada, ainsi que le profil de gestion des débris de CRD. Ensuite, une analyse documentaire traite de différents outils de conception développés pour améliorer la performance du secteur : 3RV-E, écoconception, écoconstruction et LEED®. De plus, la recension des écrits permet également de cerner les concepts d’adaptabilité et de flexibilité au niveau du bâtiment et dans les approches et mouvements émergents en architecture. Cette démarche nous amène à établir l’hypothèse que l’intégration des critères d’adaptabilité et de flexibilité au niveau du logement aurait pour effet d’améliorer l’adéquation entre les besoins évolutifs des occupants et les nouvelles considérations environnementales. Au niveau méthodologique, l’analyse du cycle de vie simplifiée par l’Eco-indicator99 encadre l’analyse environnementale de l’ossature de trois types de construction de cloison. De cette évaluation, on conclut que c’est la construction traditionnelle à ossature de bois qui produit le moins d’impacts. Dans l’ordre suivant la proposition de construction de cloison à ossature d’aluminium, plus adaptable et flexible, et finalement la construction à ossature d’acier qui est le système le plus dommageable. Par contre, en intégrant le facteur temporel, cette analyse démontre que l’intégration de l’adaptabilité et de la flexibilité procure plusieurs cycles de vie et de rénovation au produit et à ses composantes. Finalement, ces concepts offrent également le potentiel de diminuer les impacts générés par la construction et la rénovation, un constat qui mériterait d’être abordé dans une approche plus systémique.
Resumo:
The overall aim of this research project was to provide a broader range of value propositions (beyond upfront traditional construction costs) that could transform both the demand side and supply side of the housing industry. The project involved gathering information about how building information is created, used and communicated and classifying building information, leading to the formation of an Information Flow Chart and Stakeholder Relationship Map. These were then tested via broad housing industry focus groups and surveys. The project revealed four key relationships that appear to operate in isolation to the whole housing sector and may have significant impact on the sustainability outcomes and life cycle costs of dwellings over their life cycle. It also found that although a lot of information about individual dwellings does already exist, this information is not coordinated or inventoried in any systematic manner and that national building information files of building passports would present value to a wide range of stakeholders.
Resumo:
Office building retrofit is a sector being highlighted in Australia because of the mature office building market characterised by a large proportion of ageing properties. The increasing number of office building retrofit projects strengthens the need for waste management. Retrofit projects possess unique characteristics in comparison to traditional demolition and new builds such as partial operation of buildings, constrained site spaces and limited access to as-build information. Waste management activities in retrofit projects can be influenced by issues that are different from traditional construction and demolition projects. However, previous research on building retrofit projects has not provided an understanding of the critical issues affecting waste management. This research identifies the critical factors which influence the management of waste in office building retrofit projects through a literature study and a questionnaire survey to industry practitioners. Statistical analysis on a range of potential waste issues reveals the critical factors, as agreed upon by survey respondents in consideration of their different professional responsibilities and work natures. The factors are grouped into five dimensions, comprising industry culture, organisational support and incentive, existing building information, design, and project delivery process. The discussions of the dimensions indicate that the waste management factors of office building retrofit projects are further intensified compared to those for general demolition and construction because retrofit projects involve existing buildings which are partially operating with constrained work space and limited building information. Recommendations for improving waste management in office building retrofit projects are generalised such as waste planning, auditing and assessment in the planning and designing stage, collaboration and coordination of various stakeholders and different specialists, optimised building surveying and BIM technologies for waste analysis, and new design strategies for waste prevention.
Resumo:
As telhas cerâmicas são muito utilizadas há séculos no revestimento de coberturas inclinadas em Portugal e em muitos outros países. Alguns casos de degradação acelerada têm vindo a afectar a durabilidade das telhas. Para avaliar o desempenho de telhas cerâmicas em ambiente marítimo foi desenvolvido um estudo experimental baseado em ensaios de envelhecimento artificial acelerado. Este estudo compreende a caracterização de diversos tipos de telhas cerâmicas, o desenvolvimento e realização de ensaios de envelhecimento acelerado realizados em câmara de nevoeiro salino, a avaliação da degradação provocada pelos ensaios acelerados e a comparação com a degradação sofrida por telhas em exposição natural. O estudo pretende reproduzir em laboratório os mecanismos de degradação observados em condições reais e identificar as características mais afectadas, procurando relações significativas entre grandezas relevantes medidas nos materiais antes e depois da acção dos agentes externos. Pretende-se também, com base na análise comparativa dos resultados dos ensaios de envelhecimento sobre diferentes tipos de telhas, identificar parâmetros de composição e de fabrico que contribuem para a degradação e fornecer assim à indústria dados relevantes para melhorar a durabilidade das telhas.
Resumo:
Dissertação de Final de Mestrado para obtenção do grau de Mestre em Engenharia Civil Especialização em Edificações
Resumo:
Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Civil
Resumo:
No presente trabalho apresenta-se um levantamento com base na literatura especializada, das diversas soluções estruturais em betão pré-fabricado existentes, aplicadas em edifícios correntes, mais especificamente as soluções ao nível dos elementos que as constituem, nomeadamente no que respeita a ligações estruturais dos elementos, com combinações in situ, das estruturas préfabricadas e as moldadas em obra, aproveitando o que de melhor se pode obter de ambas as técnicas, com vista a obter um melhor resultado final. Apesar do setor da construção civil estar em crise, tal como vários outros setores, as empresas de pré-fabricação apresentam soluções que poderão contrariar esta tendência, nomeadamente através da diversificação e flexibilização da sua produção, com inovação, criatividade e elevada qualidade. Num mercado em que a construção de edifícios de raiz sofreu um grande abrandamento, começa a surgir no mercado a necessidade de se reabilitar as construções existentes, nomeadamente nos grandes centros das cidades que foram perdendo população ao longo dos tempos. Esta requalificação do espaço urbano permite o desenvolvimento de soluções estruturais pré-fabricadas, no que respeita à reabilitação dos elementos existentes, quer por justaposição para reforço das estruturas, quer por inserção de elementos novos para efetuar correções. Os baixos custos de mão de obra, equipamentos e estaleiro, assim como a redução dos prazos de construção e entrega ao cliente final, dado que a produção não está dependente das condições existentes in situ para se desenvolver, destacam-se da construção civil tradicional. A produção integral dos elementos pré-fabricados de betão em fábrica tem outras vantagens, entre as quais, um melhor planeamento e controle da segurança, um controle rigoroso de qualidade, a redução dos custos de reparação e manutenção, melhor sustentabilidade com redução da quantidade de resíduos produzidos.
Resumo:
Dissertação de Natureza Científica para obtenção do grau de Mestre em Engenharia Civil na Área de Especialização de Edificações
Resumo:
À partir des années 90, parmi les transformations qu’entraine l’effondrement de l’Union soviétique à Cuba et au milieu des redéfinitions de la cubanité, apparaissent des œuvres narratives contre-discursives et actualisées sur la négritude, la race et le racisme. La représentation du Noir dans les romans de cette période prend toute sa signification du fait que se configure alors un champ de discussion dans lequel convergent différentes modalités et perceptions. Notre recherche explore le terrain discursif entourant les définitions de la cubanité et la négritude qui circulent à cette période à Cuba, pour ensuite voir de quelle manière elles se répercutent sur les auteurs et textes littéraires. À travers l’analyse des oeuvres des écrivains Eliseo Altuanga et Marta Rojas, cette thèse reconstruit leurs dialogues avec l’historiographie littéraire cubaine, l’Histoire de l’Ile et les discours plus actualisés quant au débat ethno-racial. Au moyen de visualisations opposées par rapport à l’histoire de Cuba, Altuanga et Rojas élaborent des œuvres et des personnages avec des différences idéoesthétiques marquées. Ainsi, le premier focalisera sur la recherche d’une rupture épistémologique quant à la conception du Noir dans l’imaginaire cubain, soulignant les événements de l’histoire nationale qui considèrent le Noir comme protagoniste, ce qui renforce l’idée d’une continuité dans son état de subalternisation. En ce qui concerne les protagonistes de Rojas, elle fait appel à des mulâtresses pour raconter le processus de transculturation par lequel, à son point de vue, s’est consolidée l’identité culturelle actuelle des Cubains. Suspendue dans un espace d’énonciation intermédiaire entre les premières décennies de la Révolution et la Période spéciale en Temps de Paix, Rojas construit une trilogie romanesque qui s’efforce à signaler la coupure entre les périodes pré- et postrévolutionnaires quant au traitement du Noir.