988 resultados para Rehabilitation project


Relevância:

100.00% 100.00%

Publicador:

Resumo:

"This addendum has been prepared due to changes in the 'State Participation' and the 'Recommendation' sections of the subject report that was filed in June 1991 and amended in May 1995. This addendum is an addition to those sections. The Illinois Department of Natural Resources/Office of Water Resources (IDNR/OWR) was formerly the Illinois Department of Transportation/Division of Water Resources."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This project is for the ecological rehabilitation of lagoons and natural communities at 24 parks within the Chicago Park District. The development of Chicago's lagoon system began shortly after the State of Illinois created the Chicago Park District in 1869. The lagoons were expanded over the next 50 years into 14 parks and they have become extremely important ecologic, recreation, and historic resources. A variety of factors over the last 140 years have contributed to the current deteriorated condition of the lagoons which require the expenditure of funds for major rehabilitation activities. Age of infrastructure, erosion, and sedimentation were the natural forces at work; however, the lagoons' popularity and lack of comprehensive management plan also contributed. All of the lagoons are eligible to be listed on the National Register of Historic places as major contributing features. Additionally, the lagoons in Columbus, Garfield, Humboldt, Jackson, Lincoln, Sherman and Washington Parks are historic landmarks. The Park District has already invested over $5 million for partial lagoon restoration at Humboldt, Douglas, Sherman, McKinley, Riis and Garfield Parks, and additional work is required.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The number of dams, which need rehabilitation, is growing, not only in countries that have a long tradition in dam building and operation but,also in those regions where the infrastructure is still in full development. Though rehabilitation projects generally deal with problems that are common in dam engineering practice there are some peculiarities which are a characteristic of such projects and which must be duly taken into account to avoid unsuccess and/or unnecessary costs. Regular safety inspection is essential to forestall the development of structural, hydrological and operational unsafety. if need of major repair or overall rehabilitation of a dam becomes apparent design oft he rehabilitation project must be preceded by a comprehensive checkup of the structure and appurtenant works, as well as by an evaluation of its hydrological safety inclusive of all relevant environmental aspects. The availability of complete records on the clam's structural behaviour and on meteorological and hydrological data, as well as the knowledge of the materials properties of the existing structure are important for the successful design of a rehabilitation project. To this end the installation of monitoring devices in the existing structure may be necessary to generate representative data. While the criteria to be used in structural design should correspond to current standards, the definition of hydrological design criteria depends on considerations that vary widely from region to region or even from one country to another. Some basic hydrological safety requirements, however, are recommended for general acceptance. Dam rehabilitation projects demand very careful and detailed construction planning because of their dependence on river flow conditions, operational restrictions and, often, on procedures or limitations imposed to avoid harm to the environment. of utmost importance is the timely availability of the financial funds required to complete the project, in order to avoid delays which could result in structural or operational unsafety. Since every dam sooner or later will have to undergo major repair or updating of safety, rehabilitation may evolve to a speciality of dam engineering.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The following activities are specifically identified as ineligible. 1. Construction of buildings, or portions thereof, used predominantly for the general conduct of government (e.g., city halls, courthouses, jails, police stations). 2. General government expenses. 3. Costs of operating and maintaining public facilities and services (e.g., mowing parks, replacing street light bulbs). 4. Servicing or refinancing of existing debt.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The following activities are specifically identified as ineligible. 1. Construction of buildings, or portions thereof, used predominantly for the general conduct of government (e.g., city halls, courthouses, jails, police stations). 2. General government expenses. 3. Costs of operating and maintaining public facilities and services (e.g., mowing parks, replacing street light bulbs). 4. Servicing or refinancing of existing debt.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This report summarizes the data, observations, methods, assumptions, and decisions for the design of the Relief Well Rehabilitation Project in the Right Abutment Drainage Tunnel at Chief Joseph Dam. Chief Joseph Dam (CJD) is a dam on the Columbia River and is owned and operated by the U.S. Army Corps of Engineers (USACE). It is the second only to Grand Coulee dam as the largest producer of hydropower in the United States. The right abutment drainage tunnel contains wooden stave relief wells. Water flows from these wells which reduces the hydrostatic pressure in the right abutment of the dam. The 22 wells in the floor of the tunnel are 60 years old and are in need of rehabilitation. The objective of this project is to control the groundwater gradient, prevent the movement of sediment, stop total screen collapse, and prevent initiation of backwards erosion and piping in the abutment. The rehabilitation solution is to install new stainless steel screens into the existing wells, backfill the annular space between the old wooden screen and the new stainless steel screens with a 3/8-inch pea gravel filter pack, and install a new top cap to hold the new screen in place. This report documents the data, observations, and methods used to complete the final design. During tunnel inspections USACE geologists observed dislodged end plugs and evidence of sediment movement out of the formation. The relief wells have historically high flows between 6,000 gallons per minute (gpm) to 9,000 gpm. New screens are designed based on as-built data and historic tunnel flow. The new screens are 8-in diameter, 100 slot (0.10-inch) screens. We found that screen diameter and slot size would provide adequate transmitting capacity for most of the relief wells. The filter pack gradation is based on descriptions from foundation construction reports. I found that 3/8-inch pea gravel is appropriate for the abutment material. During design, I also considered an option to install the screens into the relief wells without filter pack. I eliminated this option because it did not meet our rehabilitation objective to prevent total failure of the wooden screens.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

We describe trajectories of selected ecological indicators used as performance measures to evaluate the success of a mangrove rehabilitation project in the Ciénaga Grande de Santa Marta (CGSM) Delta-Lagoon complex, Colombia, as result of freshwater diversions initiated in 1995. There is a significant reduction in soil and water column salinity in all sampling stations following the hydraulic reconnection of the Clarín and Aguas Negras channels to the Magdalena River. Soil intersticial water salinity (depth: 0.5 m) (7 stations) and water column salinity (0.5 m) (10 stations) values declined significantly (soil <30 g kg-1; water <10 g kg-1) from 1994 to 2000. During 1994 soil interstitial water salinity ranged from 40 g kg-1 (Rinconada) to 100 g kg-1 (KM 13), while water column salinity fluctuated between 25-35 g kg-1 for most of the sampling stations. This salinity reduction increased mangrove forest regeneration promoting a net gain of 99 km2 from 1995 to 1999. The high precipitation recorded in 1995 and 1999 caused by El Niño-La Niña (ENSO), coinciding with the channels rehabilitation, influenced rapid mangrove regeneration. The lack of economic investment in the maintenance of the diversion structures from 2001 to 2004 caused a salinity increase affecting negatively already restored vegetation. A sustainable effort from the international community and the Colombian government is needed to maintain the strategic social and economic benefits reached until 2000 in the CGSM region.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A grande motivação para este trabalho resultou na avaliação da vulnerabilidade sísmica das escolas básicas e secundárias que fazem parte integrante do parque escolar de Portugal Continental. Apesar de até ao momento apenas se terem estudado a vulnerabilidade de algumas escolas em algumas zonas particulares do nosso país, para este trabalho de investigação tivemos uma ambição muito maior e obviamente fizemos um esforço muito maior. Estabelecemos assim como meta, a avaliação de todo o parque escolar. Embora todo o parque escolar possua na ordem das três centenas de escolas em todo o território nacional e sendo este projeto de reabilitação, um projeto com a duração de 2007 a 2015. Em 2011, por motivos da crise económica, todo o projeto congelou sendo reabilitadas até à data cerca de apenas um terço das escolas. Esta quantidade foi o número de escolas que avaliamos em todo o país. As escolas, sendo edifícios públicos com uma importância fundamental, tanto pela elevada concentração de jovens, como pela função essencial como centros de aprendizagem para as gerações vindouras, como também pela ameaça que representam na eventualidade dum cenário sísmico pela enorme densidade de utilizadores, e pela vantagem de nesse cenário de catástrofe a importância estrutural ser superior em relação à maior parte dos edifícios correntes, devidamente demonstrado pelos argumentos enumerados, consequentemente as escolas podem servir como instalações de proteção civil perante uma catástrofe sísmica para apoio das populações circundantes afetadas. Portanto para cada uma das escolas cordialmente fornecidas pelo Parque Escolar, E.P.E., foi feito um estudo exaustivo e muito individual de cada uma das escolas, onde cada análise foi desenvolvida por uma metodologia simplificada, sendo cada análise sempre individual, e nunca tendo sida aplicada em série, este fator melhora substancialmente a eficácia da avaliação para a quantificação das vulnerabilidades e da determinação do grau de dano e das frações de perda para os requisitos fundamentais de limitação de danos, de não colapso, e de colapso iminente que correspondem a ações com períodos de retorno de 95, 475 e 975 anos. Este trabalho é fundamental para as entidades competentes terem a consciência da vulnerabilidade das escolas secundárias, para puderem atuar a nível estrutural e diminuir assim a vulnerabilidade sísmica, e mesmo que por impossibilidade económica o poder governamental não intervenha, então pode e principalmente deve, elaborar planos de emergência tanto com engenheiros civis qualificados como com a total colaboração das corporações de bombeiros que fazem parte das forças de operação e socorro da Autoridade Nacional de Proteção Civil (ANPC).

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Dissertação para obtenção do grau de Mestre em Engenharia Civil na Área de Especialização de Edificações

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Dissertação de Natureza Científica para obtenção do grau de Mestre em Engenharia Civil na Área de Especialização de Edificações

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Relatório de Estágio para obtenção do grau de Mestre em Engenharia Civil na Área de Especialização em Edificações

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Mestrado em Engenharia Civil - Construções

Relevância:

60.00% 60.00%

Publicador:

Resumo:

O presente relatório de estágio descreve as atividades realizadas durante o período do estágio curricular, com a duração de 6 meses, na empresa Porto Vivo, SRU – Sociedade de Reabilitação Urbana da Baixa Portuense S.A. Inicialmente efetua-se uma descrição da empresa, indicando a missão, os objetivos e alguns dos seus projetos realizados ou em realização. De seguida e com o intuito de compreender a área em que Porto Vivo, SRU atua, é realizado um enquadramento demográfico e geográfico da zona de intervenção prioritária da cidade do Porto. As atividades realizadas, nomeadamente os levantamentos da dinâmica imobiliária, das unidades de alojamento, do edificado e ainda o acompanhamento de vistorias ao estado de conservação dos edifícios, são descritas destacando-se os objetivos e todos os procedimentos necessários á sua execução. Com base nas duas primeiras atividades, realizou-se um estudo de forma a compreender a relação de desenvolvimento do estado de conservação das edificações com a dinâmica imobiliária. Por último é desenvolvido um caso de estudo onde se analisa a evolução do quarteirão Carlos Alberto, descrevendo todas as fases do seu processo de reabilitação. Menciona-se a estratégia implementada pela Porto Vivo, SRU e de que forma é que esta influencia a execução do projeto de reabilitação.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

O setor da reabilitação em Portugal tem vindo a crescer consideravelmente ao longo dos últimos anos, demonstrando uma consciencialização da sociedade e das entidades competentes para definição de estratégias e planeamento, para uma manutenção das estruturas atempada de modo a prevenir patologias que provocam a sua degradação. O presente trabalho pretende fazer uma síntese das técnicas de proteção e reparação das estruturas de betão armado, efetuando também ensaios para determinação das causas das anomalias que levaram à sua reparação. O projeto de reabilitação deve seguir as recomendações indicadas nos Eurocódigos e norma EN1504 sobre produtos e sistemas para a proteção e reparação das estruturas de betão. Segundo esta norma explicam – se as principais causas de deterioração das estruturas de betão armado e os sintomas que estão na base dessa deterioração. Desta forma são descritos os métodos de intervenção, explicando o seu funcionamento e modo mais adequado de utilização com indicação dos produtos adequados para cada intervenção. Para aplicação do referido nos parágrafos anteriores desenvolveu-se uma proposta de fichas de inspeção, através de levantamento fotográfico e registo das anomalias e suas causas e ensaios não destrutivos de modo a perceber o estado atual da estrutura para uma melhor compreensão da metodologia de reparação a seguir

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This work came in response to the degradation of the landscape by mining. This is the landscape rehabilitation of a quarry off in the city of Laranjal Paulista, the state of São Paulo, which poses environmental and underutilization problems as the area abandonment of consequences. Based on regional diagnostics, urban and landscape study, the project in question is divided into three main areas: environmental recovery, offering public facilities and leisure proposition to adventure tourism. Thus, the Quarry Park - Tourist Complex is a degraded area rehabilitation project from the expansion of leisure options, sports and culture, lacking in the city and the structuring of adventure sports that already occur in the area by a regional public. Thus, one projetual attempt to become a reference in sustainable development