992 resultados para Recovery project


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Exercise for Health program is a telephone-delivered exercise intervention for women with breast cancer (BC) living in regional Queensland. The effect of the program is being evaluated in the context of a randomised controlled trial. Consenting, newly diagnosed BC patients, treated in one of 8 regional Queensland hospitals, were randomly allocated to telephone-based exercise counselling (EC) or usual care (UC) at 6-weeks post-surgery. EC participants received an exercise workbook and 16 calls from an exercise physiologist over 8 months. Physical activity levels (PA) (Active Australia & CHAMPS), quality-of-life (FACTB+4), upper-body function (DASH) and fatigue (FACIT-Fatigue) were assessed at baseline (4-6 weeks post-surgery), 6- and 12-months post-surgery. Preliminary analyses of available 6-month data were conducted using t-tests and repeated measures ANCOVAs. Participating women (n=143; EC n=73, UC n=70) were aged 53±9 years and 30% met PA guidelines at baseline. Up to two thirds of the women received adjuvant therapy during the first 6 months following surgery. Greater improvements (mean change+SD) occurred for the EC vs UC group in weekly sessions of walking (1.83±4.3 vs -0.5±5.5, p=0.029) moderate-vigorous PA (5.0±6.5 vs -1.1±6.1, p=0.005) and strength training (1.9±2.9 vs -0.5±4.2 p<0.001), and in upper-body function, reflected by lower log-transformed disability scores (-0.34±0.44 vs -0.17±0.28, p=0.038). More EC than UC participants met PA guidelines at 6 months (46.3% vs 32.7%). Preliminary findings from this ongoing trial suggest that the telephone is a feasible and effective medium for delivering exercise counselling to newly diagnosed BC patients living in regional areas.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In western Queensland, severe drought conditions began in late 2001 and did not generally ease until the 2008/09 summer. Despite the ability of Mitchell grass plants to become dormant during drought, a large proportion of plants appeared to be dead rather than drought-dormant by the end of the 2002/03 summer. Tillers and remaining leaves were blackened and unpalatable to livestock. The term Mitchell grass dieback was coined by producers and other observers to describe what had occurred, although most were confident that the grass would recover with the breaking of the drought. Mitchell grass plants generally failed to respond to widespread average summer rains in early 2004 (> 250 mm). Observation suggested that moisture had penetrated to a soil depth of about 60 cm and a response from plants was expected. When there was no general response, research into the reasons for this was initiated (NBP.348 'Mitchell grass death in Queensland: extent, economic impact and potential for recovery'; 2005-07). This included an investigation of discrete areas of pasture that had responded to the 2003-04 summer rain. Further declines in condition of Mitchell grasslands occurred between winter 2005 and winter 2006 and, by 2006, field surveys indicated that 53% of this pasture community was in poor (C) condition, primarily due to dieback. Measurements at some sites suggested practices such as wet season spelling and burning can pre-condition Mitchell grass pasture for greater resistance to drought-induced dieback. However, the casual mechanisms and the effective timing and frequency of these practices remained unclear.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Áreas alagadas são importantes devido à grande biodiversidade que sustentam e aos serviços ambientais gerados pela sua conservação. Essas áreas, quando dominadas por macrófitas, tendem a suportar grande biodiversidade e assumir grande valor de conservação. Assim, o monitoramento do estabelecimento deste importante componente do ecossistema durante um projeto de recuperação de ecossistemas é importante para avaliar o sucesso da sua recuperação. Este trabalho teve como objetivo estimar aquantidade de biomassa por área acumulada em um ecossistema ao longo de um gradiente de recuperação. Através da classificação não supervisionada gerada a partir de de imagens de satélite de alta resolução (GeoEye-1) e amostragem destrutiva foram estimadas quantidades de biomassa por área em três alagados em recuperação na Reserva Ecológica Guapiaçú. A classificação não supervisionada se mostrou uma ferramenta acurada e eficiente no mapeamento de classes de vegetação. Os alagados estudados apresentam uma taxa de acúmulo de carbono anual estimada em 1,12 MgC.hec-1 atingindo um máximo de 5.55 MgC.hec-1 no terceiro ano. Adicionalmente, foi observada uma correlação negativa entre biomassa e profundidade.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A utilização do metano (CH4) presente no biogás gerado através da degradação anaeróbica de resíduos orgânicos depositados em aterros sanitários como fonte de energia é uma tecnologia em expansão, principalmente nos países em desenvolvimento. Para assegurar um melhor aproveitamento do CH4 e a viabilidade econômica do projeto de exploração energética é necessário que estes empreendimentos avaliem sua capacidade de produzir este gás com o passar dos anos, mesmo após o encerramento da deposição de resíduos. O potencial de geração é comumente estimado a partir de modelos cinéticos de primeira ordem propostos por conceituadas instituições, entretanto, estudos recentes apontam alto grau de incerteza e diferenças relevantes entre os resultados obtidos com cada metodologia. Este trabalho tem por objetivo analisar a variação dos resultados das estimativas de emissão de metano dos modelos recomendados pela USEPA, Banco Mundial (Scholl Canyon) e IPCC utilizando tanto dados e informações disponibilizadas do aterro sanitário Moskogen, localizado em Kalmar, Suécia, que foi operado entre 1977 e 2008. Além de estimar a capacidade de geração de CH4, objetiva-se identificar qual o modelo cujas estimativas mais se aproximam dos dados de biogás efetivamente medidos e quanto gás ainda pode ser extraído do aterro. O estudo ainda avaliou como valores diferentes para os parâmetros principais dos modelos afetam a estimativa de geração final. O modelo IPCC mostrou-se o mais confiável dentre os analisados, estimando que o aterro Moskogen produza mais de 102 milhões de m de CH4 entre 1977 e 2100, sendo 39,384 milhões passíveis de extração de 2012 a 2100. Os demais modelos apresentaram premissas inadequadas com a realidade do aterro sanitário estudado. Contudo, mesmo com a superioridade do modelo proposto pelo IPCC, maiores estudos são necessários no local, que levantem outras informações de campo como a vazão passiva de gás pela camada de cobertura do aterro e uma melhor estimativa do percentual de material orgânico biodegradável presente em cada fração de resíduos depositada em Moskogen.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The coastal zone has been studied worldwide with a focus on the coastal erosion. In the present days, much of the world's coastlines are being affected by erosion, which causes great damage to the economy. This work had as study case the beaches of Areia Preta, Artistas, Meio and Forte located in Natal in Rio Grande do Norte. It shows as result the monitoring of the beach strip that makes possible to obtain quantitative and qualitative data, allows the study of the coastal dynamics of the beaches and the Recovery Project of the Areia Preta beach interference on adjacent beaches. This research was guided by the integrated analysis method on the systemic perspective. The pratical procedures adopted were: bibliographic research; fieldwork during eleven months (environmental characterization, collection of hydrodynamic data, topographic leveling, collection of sediments) and; sedimentological analysis of samples collected. By monitoring of the points A, B, C, D and E we were able to find the occurrence of the coastal erosion on their biggest part except by the C and D profiles. It was noted the need for the government to complete the hydraulic fill, as it made only 60% of the landfill planed. It was found that the spikes built on the beach of Areia Preta are preventing the natural transport of sediments that the longshore performs towards South-North. This interference is causing the lack of sediment on the beaches of Forte and Meio and their coastal erosion in consequence

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Since 2006, the European Near Earth Asteroids Research (EURONEAR) project has been contributing to the research of near-Earth asteroids (NEAs) within a European network. One of the main aims is the amelioration of the orbits of NEAs, and starting in 2014 February we focus on the recovery of one-opposition NEAs using the Isaac Newton Telescope (INT) in La Palma in override mode. Part of this NEA recovery project, since 2014 June EURONEAR serendipitously started to discover and secure the first NEAs from La Palma and using the INT, thanks to the teamwork including amateurs and students who promptly reduce the data, report discoveries and secure new objects recovered with the INT and few other telescopes from the EURONEAR network. Five NEAs were discovered with the INT, including 2014 LU14, 2014 NL52 (one very fast rotator), 2014 OL339 (the fourth known Earth quasi-satellite), 2014 SG143 (a quite large NEA), and 2014 VP. Another very fast moving NEA was discovered but was unfortunately lost due to lack of follow-up time. Additionally, another 14 NEA candidates were identified based on two models, all being rapidly followed-up using the INT and another 11 telescopes within the EURONEAR network. They include one object discovered by Pan-STARRS, two Mars crossers, two Hungarias, one Jupiter trojan, and other few inner main belt asteroids (MBAs). Using the INT and Sierra Nevada 1.5 m for photometry, then the Gran Telescopio de Canarias for spectroscopy, we derived the very rapid rotation of 2014 NL52, then its albedo, magnitude, size, and its spectral class. Based on the total sky coverage in dark conditions, we evaluate the actual survey discovery rate using 2-m class telescopes. One NEA is possible to be discovered randomly within minimum 2.8 deg2 and maximum 5.5 deg2. These findings update our past statistics, being based on double sky coverage and taking into account the recent increase in discovery.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This report was written on work performed under Federal solid waste management demonstration grant no. S-801535 awarded to Lowell, Mass. in October, 1972, and cancelled at the request of the grantee in July, 1975.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

[EN] The Giant Lizard of El Hierro, Gallotia simonyi is one of the most endangered reptile species of the world (Corbett 1989, 1993, Machado et al. 1985). The first scientific news about a living population of G. simonyi dates back to 1975 (Böhme & Bings 1975, 1977; see also Bischoff et al. 1979). The giant lizard, widely distributed in El Hierro in the past (Böhme et al. 1981) is presently restricted to a small area of the Fuga de Gorreta (fig. 1).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Recovery is a highly contextualized concept amid divergent interpretations and unique experiences. There is substantial current interest in building evidence about recovery from mental illness in order to inform best practice founded in the ways people find to live productive and meaningful lives. This paper presents some accounts related to recovery and illness expressed by eight people through a Participatory Action Research project. The research facilitated entry to the subjective experiences of living in the community as an artist with a mental illness. The people in the research shared an integrated understanding of illness, recovery and identity. Their understanding provided insight into mental illness as an inseparable aspect of who they were. Further, specific issue was raised of recovery as a clinical term with a requirement to meet distinct conventions of recovery. This paper emphasizes that being ill and being well, for the person with a mental illness, is a dynamic and complex development not easily explained or transformed into uniform process or outcomes. Attempts to establish an integral or consensual approach to recovery has, to date, disregarded mental illness as a full human experience. This paper argues that broader frameworks for thinking and responding to the dynamic processes of mental illness and recovery are needed and require acknowledgment of competing and contradictory ideas.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Architectural education is beginning to recognise the potential of a more intensive relationship between the tasks of designing and building (Erdman et al., 2002) within a work integrated learning environment. The Bouncing Back Project, began after the Queensland, Australia floods in January 2011, and has organically grown through a number of architectural student exhibitions, initially displaying flood responsive designs. In September 2011, 10 Queensland University of Technology architecture students travelled to Sydney to work together in helping to construct a shelter in the Emergency Shelter Exhibition, at Customs House in Circular Quay. The construction and making of the shelter, was filmed. This film documents the student experience, of making, working with industry professionals, community engagement and it reveals how this activity promotes informal work integrated learning in a real world context.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research investigated strategies for motorway congestion management from a different angle: that is, how to quickly recover motorway from congestion at the end of peak hours, given congestion cannot be eliminated due to excessive demand during the long peak hours nowadays. The project developed a zone recovery strategy using ramp metering for rapid congestion recovery, and a serious of traffic simulation investigations were included to evaluate the developed strategy. The results, from both microscopic and macroscopic simulation, demonstrated the effectiveness of the zone recovery strategy.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This project was designed to provide the structural softwood processing industry with the basis for improved green and dry grading to allow maximise MGP grade yields, consistent product performance and reduced processing costs. To achieve this, advanced statistical techniques were used in conjunction with state-of-the-art property measurement systems. Specifically, the project aimed to make two significant steps forward for the Australian structural softwood industry: • assessment of technologies, both existing and novel, that may lead to selection of a consistent, reliable and accurate device for the log yard and green mill. The purpose is to more accurately identify and reject material that will not make a minimum grade of MGP10 downstream; • improved correlation of grading MOE and MOR parameters in the dry mill using new analytical methods and a combination of devices. The three populations tested were stiffness-limited radiata pine, strength-limited radiata pine and Caribbean pine. Resonance tests were conducted on logs prior to sawmilling, and on boards. Raw data from existing in-line systems were captured for the green and dry boards. The dataset was analysed using classical and advanced statistical tools to provide correlations between data sets and to develop efficient strength and stiffness prediction equations. Stiffness and strength prediction algorithms were developed from raw and combined parameters. Parameters were analysed for comparison of prediction capabilities using in-line parameters, off-line parameters and a combination of in-line and off-line parameters. The results show that acoustic resonance techniques have potential for log assessment, to sort for low stiffness and/or low strength, depending on the resource. From the log measurements, a strong correlation was found between the average static MOE of the dried boards within a log and the predicted value. These results have application in segregating logs into structural and non-structural uses. Some commercial technologies are already available for this application such as Hitman LG640. For green boards it was found that in-line and laboratory acoustic devices can provide a good prediction of dry static MOE and moderate prediction for MOR.There is high potential for segregating boards at this stage of processing. Grading after the log breakdown can improve significantly the effectiveness of the mill. Subsequently, reductions in non-structural volumes can be achieved. Depending on the resource it can be expected that a 5 to 8 % reduction in non structural boards won’t be dried with an associated saving of $70 to 85/m3. For dry boards, vibration and a standard Metriguard CLT/HCLT provided a similar level of prediction on stiffness limited resource. However, Metriguard provides a better strength prediction in strength limited resources (due to this equipment’s ability to measure local characteristics). The combination of grading equipment specifically for stiffness related predictors (Metriguard or vibration) with defect detection systems (optical or X-ray scanner) provides a higher level of prediction, especially for MOR. Several commercial technologies are already available for acoustic grading on board such those from Microtec, Luxscan, Falcon engineering or Dynalyse AB for example. Differing combinations of equipment, and their strategic location within the processing chain, can dramatically improve the efficiency of the mill, the level of which will vary depending of the resource. For example, an initial acoustic sorting on green boards combined with an optical scanner associated with an acoustic system for grading dry board can result in a large reduction of the proportion of low value low non-structural produced. The application of classical MLR on several predictors proved to be effective, in particular for MOR predictions. However, the usage of a modern statistics approach(chemometrics tools) such as PLS proved to be more efficient for improving the level of prediction. Compared to existing technologies, the results of the project indicate a good improvement potential for grading in the green mill, ahead of kiln drying and subsequent cost-adding processes. The next stage is the development and refinement of systems for this purpose.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report describes the outcomes from the Australian Methane to Markets in Agriculture (AM2MA) research project PRJ-005672 ‘Methane recovery and use at a piggery – Grantham’. This project involved upgrading the biogas extraction system originally installed in conjunction with a partial floating cover, retro-fitted to the primary anaerobic pond at the QNPH Grantham piggery under an earlier AM2MA project (Project No. PRJ-003003), as described by Skerman et al (2011). Following the system upgrade, this project also included installing a biogas reticulation pipeline to supply biogas from the extraction system, to a water heating system used to heat water circulated through underfloor heating pads in the piggery farrowing sheds. This biogas fired water heating system has the potential to significantly reduce on-farm energy costs by replacing a significant proportion of the Liquid Petroleum Gas (LPG) previously used for farrowing shed heating. Further monitoring of the biogas system performance has also been carried out. This report describes the work undertaken and outlines the monitoring results, implications, conclusions and recommendations arising from this work.