790 resultados para Quality Management System


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper has two main sections, the first of which presents a summarized review of the literature concerning previous studies on the implementation of ISO 9000 quality management systems (QMSs) both in global construction companies as well as in Indonesian construction firms, and the perceived correlation between organisational culture and QMS practices in the construction sector. The first section of the paper contributes to the development of the second section, which presents details of the research project being undertaken. Based on the fundamental questions that led to the development of the main research objectives, suitable research methods have been developed in order to meet these objectives. Primary data will be collected by use of a mixed methods approach, i.e., questionnaire surveys and focus group discussions/interviews in order to obtain opinions from respondents drawn from targeted ISO construction firms. Most of the data expected to be obtained will be in future be analyzed using statistical software then the findings will be discussed in order to ultimately develop a culture-based QMS framework.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper discusses the level of effectiveness of quality principles and quality management system implementation and the relationship with performance of ISO9000 certified Indonesian contractors. It also discusses the statistical relationship between quality management systems (QMSs) and key performance indicators (KPIs) amongst a large sample of Indonesian construction companies. Data collected is from questionnaire surveys involving Quality Managers, Managers, and Project and Site Engineers representing 77 different companies. Results indicate that even though some contractors have not yet effectively implemented an effective QMS, most of the KPIs of respondent companies are still at the level of high performance. The statistical results show that the relationship between variables of ISO9000 QMS principles and contractors’ KPIs is significant. These results suggest that an increment in the implementation level of QMS principles can increase KPIs, however that much effort is still required for Indonesian contractors to fully effectively implement QMS principles and thus substantially improve performance against KPIs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As the Indonesian construction industry is now promising to become the engine of national economic development, achieving quality and higher performance, not only domestically but also in the international market, are becoming crucial issues. Implementing quality management systems (QMSs) based on ISO 9001 are important in helping Indonesian construction companies become more competitive, for it is acknowledged that quality in construction is a major concern in the global construction industry. However, the possession of ISO 9001 certification does not reflect the presence of a well-operated QMS, which is capable of giving customer and project end-users satisfaction. The review of literature found that there is a significant correlation between a company.s organisational culture and the quality performance of contractors. While research into this area has involved many researchers, there is no critical mass of information specifically related to the Indonesian situation. Studies based on contemporary perspectives of the characteristics of the Indonesian construction organisational culture using Cameron and Quinn.s Organizational Culture Assessment Instrument (OCAI) and its relationship with the contractor.s ISO 9001 practices, have not been previously undertaken. This thesis research, therefore, investigated the culture profiles in Indonesian construction organisations, together with the current implementation of ISO 9001 and their performance during implementing QMSs, as information in these areas has a bearing on the poor performance and low levels of competitiveness of Indonesian construction companies. Questionnaire surveys were distributed to selected representative grade 7 civil engineering contractors located in the two provincial capitals of Makassar and Manado, and the national capital, Jakarta, in order to collect responses designed to examine the effectiveness of their QMSs implementation. The survey also aimed to identify current problems within the systems, and examine the performance of companies while implementing their QMSs. The questionnaire contained questions to assess the organisational culture profiles of Indonesian construction companies, adopting the OCAI. The survey results were then used to analyse the influence of different organisational culture profiles on QMSs implementation among respondent companies. The results from the questionnaire survey supported the development of a Culture-based Quality Management System Improvement Implementation Framework, designed to help Indonesian construction companies identify some typical barriers associated with impacting on effective QMSs implementation; to assist them to develop cultural values that can drive effective QMSs implementation; to undertake effective QMSs practices; and to recognise the potential results and longer-term benefits obtainable from implementing effective QMSs. A Focus Group Discussion was conducted with the assistance of a panel of professional construction practitioners, policy makers and academic experts, which further considered and validated the usefulness and applicability of the framework. Based on the outcome from this discussion and on the results of the earlier data analysis, a final version of the framework was developed to assist Indonesian construction companies in improving their capability of construction project delivery, and thereby contribute to providing or improving the competitive advantage of Indonesian construction companies in the local, national and global construction market.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The intent of this study was to design, document and implement a Quality Management System (QMS) into a laboratory that incorporated both research and development (R&D) and routine analytical activities. In addition, it was necessary for the QMS to be easily and efficiently maintained to: (a) provide documented evidence that would validate the system's compliance with a certifiable standard, (b) fit the purpose of the laboratory, (c) accommodate prevailing government policies and standards, and (d) promote positive outcomes for the laboratory through documentation and verification of the procedures and methodologies implemented. Initially, a matrix was developed that documented the standards' requirements and the necessary steps to be made to meet those requirements. The matrix provided a check mechanism on the progression of the system's development. In addition, it was later utilised in the Quality Manual as a reference tool for the location of full procedures documented elsewhere in the system. The necessary documentation to build and monitor the system consisted of a series of manuals along with forms that provided auditable evidence of the workings of the QMS. Quality Management (QM), in one form or another, has been in existence since the early 1900's. However, the question still remains: is it a good thing or just a bugbear? Many of the older style systems failed because they were designed by non-users, fiercely regulatory, restrictive and generally deemed to be an imposition. It is now considered important to foster a sense of ownership of the system by the people who use the system. The system's design must be tailored to best fit the purpose of the operations of the facility if maximum benefits to the organisation are to be gained.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The study of the organisational culture in the construction industry is still in the stage of debate (Oney-Yazıcı et al., 2007). Despite the complexities involved in measuring the culture of the construction industry (Tijhuis and Fellows, 2012), this culture is regarded as being worthy of research, especially in relation to the organisational culture needed to support quality management systems (Koh and Low, 2008; Watson and Howarth, 2011) and to improve organisational effectiveness, and therefore, organisational performance (Coffey, 2010; Cheung et al., 2011). A number of recent studies have examined the construction companies’ organisational culture within the context of the use of Cameron and Quinn’s Competing Value Framework (CVF), as well as the use of their Organizational Culture Assessment Instrument (OCAI) as the conceptual paradigm for the analyses (Thomas et al., 2002; Nummelin, 2006; Oney- Yazıcı et al., 2007; Koh and Low, 2008). However, there has been little research based on the use of Cameron and Quinn’s CVF-OCAI tool for identifying types of construction companies’ organisational culture and their influences on the implementation of QMS-ISO 9001. Research output and information is also very limited relating to the strength of the companies’ organisational culture driving an effective QMS-ISO 9001 implementation, affecting the companies’ effectiveness. To rectify these research gaps, the research has been aimed to study organisational culture types (based on CVF) and their influences on the implementation of QMS-ISO 9001:2008 principles and elements, which eventually lead to improved companies’ quality performance. In order to fully examine the status of the QMS being implemented, the research has studied the relationships of the barriers of QMS implementation with the implementation of QMS-ISO 9001:2008 principles and elements and with the business performance of the companies, as well as the examination of the relationships of the implementation of QMS-ISO 9001:2008 principles and elements with the companies’ business performance. The research output has been the development of fundamental and original studies on the study topics, to provide the knowledge for improvements in Indonesian construction companies’ quality performance and quality outcomes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Shrimp Aquaculture has provided tremendous opportunity for the economic and social upliftment of rural communities in the coastal areas of our country Over a hundred thousand farmers, of whom about 90% belong to the small and marginal category, are engaged in shrimp farming. Penaeus monodon is the most predominant cultured species in India which is mainly exported to highly sophisticated, quality and safety conscious world markets. Food safety has been of concem to humankind since the dawn of history and the concern about food safety resulted in the evolution of a cost effective, food safety assurance method, the Hazard Analysis Critical Control Point (HACCP). Considering the major contribution of cultured Penaeus monodon to the total shrimp production and the economic losses encountered due to disease outbreak and also because traditional methods of quality control and end point inspection cannot guarantee the safety of our cultured seafood products, it is essential that science based preventive approaches like HACCP and Pre requisite Programmes (PRP) be implemented in our shrimp farming operations. PRP is considered as a support system which provides a solid foundation for HACCP. The safety of postlarvae (PL) supplied for brackish water shrimp farming has also become an issue of concern over the past few years. The quality and safety of hatchery produced seeds have been deteriorating and disease outbreaks have become very common in hatcheries. It is in this context that the necessity for following strict quarantine measures with standards and code of practices becomes significant. Though there were a lot of hue and cry on the need for extending the focus of seafood safety assurance from processing and exporting to the pre-harvest and hatchery rearing phases, an experimental move in this direction has been rare or nil. An integrated management system only can assure the effective control of the quality, hygiene and safety related issues. This study therefore aims at designing a safety and quality management system model for implementation in shrimp farming and hatchery operations by linking the concepts of HACCP and PRP.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Quality related problems have become dominant in the seafood processing industry in Kerala. This has resulted in the rejection of seafood sent from India to many destinations. The latest being the total block listing of seafood companies from India from being exported to Europe and partial block listing by the US. The quality systems prevailed in the seafood industry in India were outdated and no longer in use in the developed world. According to EC Directive discussed above all the seafood factories exporting to European countries have to adopt HACCP. Based on this, EIA has now made HACCP system mandatory in all the seafood processing factories in India. This transformation from a traditional product based inspection system to a process control system requires thorough changes in the various stages of production and quality management. This study is conducted by the author with to study the status of the existing infrastructure and quality control system in the seafood industry in Kerala with reference to the recent developments in the quality concepts in international markets and study the drawbacks, if any, of the existing quality management systems in force in the seafood factories in Kerala for introducing the mandatory HACCP concept. To assess the possibilities of introducing Total Quality Management system in the seafood industry in Kerala in order to effectively adopt the HACCP concept. This is also aimed at improving the quality of the products and productivity of the industry by sustaining the world markets in the long run.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a proposal for a Quality Management System for a generic GNSS Surveying Company as an alternative for management and service quality improvements. As a result of the increased demand for GNSS measurements, a large number of new or restructured companies were established to operate in that market. Considering that GNSS surveying is a new process, some changes must be performed in order to accommodate the old surveying techniques and the old fashioned management to the new reality. This requires a new management model that must be based on a well-described procedure sequence aiming at the Total Management Quality for the company. The proposed Quality Management System was based on the requirements of the Quality System ISO 9000:2000, applied to the whole company, focusing on the productive process of GNSS surveying work.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In order to survive in the increasingly customer-oriented marketplace, continuous quality improvement marks the fastest growing quality organization’s success. In recent years, attention has been focused on intelligent systems which have shown great promise in supporting quality control. However, only a small number of the currently used systems are reported to be operating effectively because they are designed to maintain a quality level within the specified process, rather than to focus on cooperation within the production workflow. This paper proposes an intelligent system with a newly designed algorithm and the universal process data exchange standard to overcome the challenges of demanding customers who seek high-quality and low-cost products. The intelligent quality management system is equipped with the ‘‘distributed process mining” feature to provide all levels of employees with the ability to understand the relationships between processes, especially when any aspect of the process is going to degrade or fail. An example of generalized fuzzy association rules are applied in manufacturing sector to demonstrate how the proposed iterative process mining algorithm finds the relationships between distributed process parameters and the presence of quality problems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Within the supply chain, the customer does not simply buy parts or services from suppliers, but also buys supplier capabilities, which results in quality products and services. Having a tool that handles the Inspection as well as the Nonconformance, Complaint, Corrective Action and Concession processes is key to successfully track the supplier performance. Taking as a case study a Supplier Quality Management (SQM) currently in operation in an Original Equipment Manufacturer (OEM) for automotive industry, this paper presents a platform to support a Supplier Quality Management System (SQMS), that fits the technical specification ISO/TS 16949 requirements. This prototype is composed by a web platform and a mobile App, having flexibility and mobility as key main characteristics.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The study was conducted on the present status of HACCP based quality management system of golda, Macrobrachium rosenbergii farms in Fulpur region of Mymensingh. Information was collected on general condition of farms, culture systems and post-harvest quality management. In almost all farms, there is no or inadequate infrastructure facilities such as, road access, electric supply, telecommunications, ice, feed storage facility, vehicle for golda transportation, washing and toilet facilities. The problems associated with sanitation and hygiene was: widespread use of cow dung, poultry manure and construction of open toilet within the vicinity of prawn culture pond. Different grades of commercially available and locally prepared feeds were used for golda culture in the pond. Golda post-larvae (PL) of 40-50 days old were stocked with carp species. The price of golda PL ranged from Tk. 1.00 to Tk. 1.25/piece. The pond size varied from 50 decimal (0.2 ha) to 2.5 acre (1.0 ha) with an average depth of 2-2.5 m. The culture period of golda varied from April-May to November-December and survival rate ranged between 75 and 80%. Production of golda varied from 250-500 kg/acre (625-1,250 kg/ha). Harvested golda were transported to city market within 4 h. Two size grading were generally followed during pricing, e.g. Tk. 500 to 550/kg for >100 g size and Tk. 300/kg for <100 g size. The cost-benefit ratio was found to remain around 1:1.25 depending on availability of PL. Water quality parameters such as, water temperature, pH, dissolved oxygen, total alkalinity and chlorophyll a in five golda farms in Fulpur region were monitored. Water temperature ranged from 29°C to 33°C, dissolved oxygen from 2.28 to 4.13 mg/l, pH between 6.65 and 7.94, alkalinity from 44 to 70 mg/l and chlorophyll a concentration from 61.88 to 102.34 µg/l in the five investigated ponds. The Aerobic Plate Count (APC) of the water sample was within the range of 2.0x10^6 - 2.96x10^7 CFU/ml and of soil samples within the range of 6.9x10^6 - 7.73x10^6 CFU/g. Streptococcus sp., Bacillus sp., Escherichia coli, Staphylococcus sp., Pseudomonas sp. and Salmonella sp. were isolated from pond water and sediment. Different feed samples used for golda was analyzed for proximate composition. Moisture content ranged around 14.14-21.22%, crude protein 20.55-44.1%, lipid 4.67-12.54% and ash 9.7-27.69%. The TVB-N values and peroxide values of feeds used as starter, grower and fish meal were found within the acceptable ranges and samples were free from pathogenic organisms. A training was organized for the golda farmers on HACCP, water quality and post-harvest quality management of prawn.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

ACM Computing Classification System (1998): D.2.5, D.2.9, D.2.11.