963 resultados para Project cost
Resumo:
OBJECTIVE To evaluate the viability of a professional specialist in intra-hospital committees of organ and tissue donation for transplantation. METHODS Epidemiological, retrospective and cross-sectional study (2003-2011 and 2008-2012), which was performed using organ donation for transplants data in the state of Sao Paulo, Southeastern Brazil. Nine hospitals were evaluated (hospitals 1 to 9). Logistic regression was used to evaluate the differences in the number of brain death referrals and actual donors (dependent variables) after the professional specialist started work (independent variable) at the intra-hospital committee of organ and tissue donation for transplantation. To evaluate the hospital invoicing, the hourly wage of the doctor and registered nurse, according to the legislation of the Consolidation of Labor Laws, were calculated, as were the investment return and the time elapsed to do so. RESULTS Following the nursing specialist commencement on the committee, brain death referrals and the number of actual donors increased at hospital 2 (4.17 and 1.52, respectively). At hospital 7, the number of actual donors also increased from 0.005 to 1.54. In addition, after the nurse started working, hospital revenues increased by 190.0% (ranging 40.0% to 1.955%). The monthly cost for the nurse working 20 hours was US$397.97 while the doctor would cost US$3,526.67. The return on investment was 275% over the short term (0.36 years). CONCLUSIONS This paper showed that including a professional specialist in intra-hospital committees for organ and tissue donation for transplantation proved to be cost-effective. Further economic research in the area could contribute to the efficient public policy implementation of this organ and tissue harvesting model.
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT
Resumo:
BACKGROUND The high prevalence of women that do not reach the recommended level of physical activity is worrisome. A sedentary lifestyle has negative consequences on health status and increases health care costs. The main objective of this project is to assess the cost-effectiveness of a primary care-based exercise intervention in perimenopausal women. METHODS/DESIGN The present study is a Randomized Controlled Trial. A total of 150 eligible women will be recruited and randomly assigned to either a 16-week exercise intervention (3 sessions/week), or to usual care (control) group. The primary outcome measure is the incremental cost-effectiveness ratio. The secondary outcome measures are: i) socio-demographic and clinical information; ii) body composition; iii) dietary patterns; iv) glycaemic and lipid profile; v) physical fitness; vi) physical activity and sedentary behaviour; vii) sleep quality; viii) quality of life, mental health and positive health; ix) menopause symptoms. All outcomes will be assessed at baseline and post intervention. The data will be analysed on an intention-to-treat basis and per protocol. In addition, we will conduct a cost effectiveness analysis from a health system perspective. DISCUSSION The intervention designed is feasible and if it proves to be clinically and cost effective, it can be easily transferred to other similar contexts. Consequently, the findings of this project might help the Health Systems to identify strategies for primary prevention and health promotion as well as to reduce health care requirements and costs. TRIAL REGISTRATION ClinicalTrials.gov Identifier: NCT02358109 . Date of registration: 05/02/2015.
Resumo:
The objective of this study was to find out how project success can be measured in a case where the output of a project is an intangible information product, what kind of framework can be used to evaluate the project success, and how the project assessment can be done in practice. As a case example, the success of a business blueprint project was assessed from the product point of view. A framework for assessing business blueprint project success was made based on a literature review. Furthermore, separate frameworks for measuring information product quality and project costs were developed. The theory of business blueprinting was discovered not to be firmly institutionalized and it is briefly covered in the thesis. The possible net benefits from the strategic business process harmonization were noted to be much more significant than the costs of the business blueprint project. The project was seen as a sufficient success from the viewpoint of the created output.
Resumo:
Target company of this study is a large machinery company, which is, inter alia, engaged in energy and pulp engineering, procurement and construction management (EPCM) supply business. The main objective of this study was to develop cost estimation of the target company by providing more accurate, reliable and up-to-date information through enterprise resource planning (ERP) system. Another objective was to find cost-effective methods to collect total cost of ownership information to support more informed supplier selection decision making. This study is primarily action-oriented, but also constructive, and it can be divided in two sections: theoretical literature review and empirical study on the abovementioned part of the target company’s business. Development of information collection is, in addition to literature review, based on nearly 30 qualitative interviews of employees at various organizational units, functions and levels at the target company. At the core of development was to make initial data more accurate, reliable and available, a necessary prerequisite for informed use of the information. Certain development suggestions and paths were presented in order to regain confidence in ERP system as information source by reorganizing work breakdown structure and by complementing mere cost information with quantitative, technical and scope information. Several methods to use the information ever more effectively were also discussed. While implementation of the development suggestions outreached the scope of this study, it was forwarded in test environment and interest groups.
Resumo:
The challenges posed by global climate change are motivating the investigation of strategies that can reduce the life cycle greenhouse gas (GHG) emissions of products and processes. While new construction materials and technologies have received significant attention, there has been limited emphasis on understanding how construction processes can be best managed to reduce GHG emissions. Unexpected disruptive events tend to adversely impact construction costs and delay project completion. They also tend to increase project GHG emissions. The objective of this paper is to investigate ways in which project GHG emissions can be reduced by appropriate management of disruptive events. First, an empirical analysis of construction data from a specific highway construction project is used to illustrate the impact of unexpected schedule delays in increasing project GHG emissions. Next, a simulation based methodology is described to assess the effectiveness of alternative project management strategies in reducing GHG emissions. The contribution of this paper is that it explicitly considers projects emissions, in addition to cost and project duration, in developing project management strategies. Practical application of the method discussed in this paper will help construction firms reduce their project emissions through strategic project management, and without significant investment in new technology. In effect, this paper lays the foundation for best practices in construction management that will optimize project cost and duration, while minimizing GHG emissions.
Resumo:
In construction projects, the aim of project control is to ensure projects finish on time, within budget, and achieve other project objectives. During the last few decades, numerous project control methods have been developed and adopted by project managers in practice. However, many existing methods focus on describing what the processes and tasks of project control are; not on how these tasks should be conducted. There is also a potential gap between principles that underly these methods and project control practice. As a result, time and cost overruns are still common in construction projects, partly attributable to deficiencies of existing project control methods and difficulties in implementing them. This paper describes a new project cost and time control model, the project control and inhibiting factors management (PCIM) model, developed through a study involving extensive interaction with construction practitioners in the UK, which better reflects the real needs of project managers. A set of good practice checklist is also developed to facilitate implementation of the model. © 2013 American Society of Civil Engineers.
Resumo:
The aim of this study is to address the main deficiencies with the prevailing project cost and time control practices for construction projects in the UK. A questionnaire survey was carried out with 250 top companies followed by in-depth interviews with 15 experienced practitioners from these companies in order to gain further insights of the identified problems, and their experience of good practice on how these problems can be tackled. On the basis of these interviews and syntheses with literature, a list of 65 good practice recommendations have been developed for the key project control tasks: planning, monitoring, reporting and analysing. The Delphi method was then used, with the participation of a panel of 8 practitioner experts, to evaluate these improvement recommendations and to establish their degree of relevance. After two rounds of Delphi, these recommendations are put forward as "critical", "important", or "helpful" measures for improving project control practice.
Resumo:
Para a construção de uma estrutura há diversos factores que influenciam a sua concepção, tais como o vão, a topografia do local, acessibilidades, os possíveis acidentes do terreno, como cursos de água ou a sua função. É de ressalvar ainda que o enquadramento paisagístico cada vez mais é tido em conta, embora não seja determinante para a sua função ou dimensionamento. Na construção de pontes existe uma grande variedade de métodos construtivos a usar variando estes com a dimensão da obra ou com a disponibilidade de equipamento por parte do empreiteiro. Cada vez mais deverá ser bem analisado o sistema a usar, uma vez que o custo do processo construtivo constitui uma percentagem elevada do valor final da obra, podendo ser reduzidos os custos pela escolha acertada do método. Com a presente dissertação pretende-se analisar os diferentes métodos construtivos existentes no mercado, sendo estes distinguidos entre sistemas com aplicação de préfabricação ou com betonagem in-situ, e ainda o processo a usar em função do vão a vencer.
Resumo:
Co-deposition of nickel and cobalt was carried out on austenitic stainless steel (AISI 304) substrates by imposing a square waveform current in the cathodic region. The innovative procedure applied in this work allows creating a stable, fully developed, and open porous three-dimensional (3D) dendritic structure, which can be used as electrode for redox supercapacitors. This study investigates in detail the influence of the applied current density on the morphology, mass, and chemical composition of the deposited Ni-Co films and the resulting 3D porous network dendritic structure. The morphology and the physicochemical composition were studied by scanning electron microscopy (SEM), energy dispersive X-ray spectroscopy (EDS) and X-ray diffraction (W). The electrochemical behavior of the materials was evaluated by cyclic voltammetry (CV). The results highlight the mechanism involved in the coelectrodeposition process and how the lower limit current density tailors the film composition and morphology, as well as its electrochemical activity.
Resumo:
We explore the finish-to-start precedence relations of project activities used in scheduling problems. From these relations, we devise a method to identify groups of activities that could execute concurrently, i.e. activities in the same group can all execute in parallel. The method derives a new set of relations to describe the concurrency. Then, it is represented by an undirected graph and the maximal cliques problem identifies the groups. We provide a running example with a project from our previous studies in resource constrained project cost minimization together with an example application on the concurrency detection method: the evaluation of the resource stress.
Resumo:
1. Iowa Code Section 309.22 requires the County Engineer to submit an Annual Report to the Iowa DOT by September 15 of each year. 2. Iowa DOT Administrative Rule 761, Chapter 173.3 requires the Iowa DOT to distribute a detailed set of instructions to the counties for the preparation of the report. The instructions constitute the standard requirements and forms to be followed. 3. Iowa DOT Administrative Rule 761,Chapter 178 establishes requirements for the reporting by cities and counties of project cost information to the Iowa DOT 4. Iowa DOT policy states that the report shall cover the fiscal year from July 1st of the past calendar year to June 30th of the current calendar year.
Resumo:
During 1986, the City of Des Moines placed an experimental asphaltic concrete overlay containing an ice-retardant additive (Verglimit) on Euclid Avenue (U.S. Highway 6). Verglimit is a chemical multi-component deicer which is added to the surface course of an asphalt overlay. The additive was uniformly distributed through the mix at the asphalt plant, which allows exposure of the particles as the finished surface wears under traffic. During a snowfall, the exposed particles attract and absorb moisture creating a deicing solution which dampens the pavement. The Verglimit additive used on this project cost $1,180 per metric ton. The Verglimit was added at a rate of 6.3% by weight, which was 126 pounds per ton, or $66.38 per ton of hot mix asphalt. The purchase of Verglimit additive was funded by the Iowa Department of Transportation through a research project recommended by the Highway Research Advisory Board. The pavement surface experienced severe wetting due to the additive's affinity for water immediately after the project was completed and during periods of high humidity. This wetting created slippery conditions both on the project itself and where vehicles tracked the additive. The only way to remove the slipperiness was by flushing the street with water. The ice-retardant overlay appears to perform as expected in reducing the adherence of ice and snow, especially at temperatures just below freezing. It performs better in light snowfalls than in heavy ones. The ice retardant overlay is effective in eliminating thin coatings of ice due to freezing drizzle or widespread frost. The accident data showed a reduction in the number of snow and ice related accidents but due to the low number of this type of accident the results are inconclusive.
Resumo:
Työn tavoitteena oli selvittää toimintolaskennan soveltuvuutta kunnallistekniikan suunnittelun ja rakentamisen tarpeisiin. Lisäksi pyrittiin laskemaan tämänhetkiset kustannukset ja kohdistamaan ne laskentakohteille. Työn edetessä tavoitteeksi tuli myös rakentamishankkeiden kustannusten seurantajärjestelmän kehittäminen.Toimintolaskentaa koskevan kirjallisuuden avulla luotiin pilottiprojektina neljä toimintolaskentamallia. Lähtökohtana oli, että mallit ovat projektin jälkeen käyttöönotettavissa, mikäli toimintolaskenta osoittautuu käyttökelpoiseksi kohdeorganisaatioon. Laskentamallit rakennettiin Excel-taulukkolaskenta-ohjelmaan. Hankkeiden kustannusten seurannassa kokeiltiin käytössä olleen järjestelmän rinnalla kirjanpidon ja taulukkolaskennan mahdollisuuksia hyödyntävää järjestelmää. Toimintolaskenta osoittautui käyttökelpoiseksi ja monipuoliseksi, mutta vaativaksi. Toimintolaskennan etuna kunnissa on, että sen avulla virkamies-toiminnasta aiheutuneet kustannukset voidaan erotella palvelutuotannon kustannuksista. Hankkeiden kustannusseurantakokeilu oli onnistunut ja uusi järjestelmä korvaa aiemmin käytössä olleen.
Resumo:
Tutkimuksen kohdeyritys on rakennusalan pk-yritys, jonka liiketoiminta perustuu kokonaan toimitusprojekteille. Tutkimuksen tavoitteena oli kehittää kohdeyrityksen käyttöön helppokäyttöinen projektilaskentamalli, jonka avulla voidaan ennalta tunnistaa kannattamattomat toimitusprojektit. Tutkimuksessa keskitytään projektien kustannusnäkökulmaan. Tutkimus koostuu teoreettisesta kirjallisuusselvityksestä ja empiirisestä tapaustutkimuksesta. Teoreettisen aineiston ja kohdeyrityksen tietojen perusteella rakennettiin laskentamalli, jonka toimintaa tarkasteltiin esimerkkiprojektien avulla. Työn tutkimusote on konstruktiivinen, osin myös toiminta-analyyttinen. Kehitetty laskentamalli kattaa toimitusprojektin koko elinkaaren. Tarjouslaskenta-vaiheessa sen avulla tehdään päätös projektin toteutuskelpoisuudesta. Toteutus- ja seurantavaiheessa taas sillä seurataan projektin toteutuvia lukuja. Kohdeyritys voi laskentamallin avulla tunnistaa kannattamattomia projekteja, sillä tarjoushinnat tarkistetaan täyskatteellisen kustannusarvion avulla ennen projektin toteutuspäätöstä. Määrälaskennan ja täyskatteellisen laskennan ansiosta aiheuttamisperiaatetta noudatetaan kattavammin kuin kohdeyrityksen aiemmassa käytännössä.