974 resultados para Project Manager Selection


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper proposes the joint use of the AHP (Analytic Hierarchy Process) and the ICB (IPMA Competence Baseline), as a tool for the decision-making process of selecting the most suitable managers for projects. A hierarchical structure, comprising the IPMA’s ICB 3.0 contextual, behavioural and technical competence elements, is constructed for the selection of project managers. It also describes the AHP implementation, illustrating the whole process with an example using all the 46 ICB competence elements as model criteria. This tool can be of high interest to decision-makers because it allows comparing the candidates for managing a project using a systematic and rigorous process with a rich set of proven criteria.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Programa de doctorado: Restauración y rehabilitación arquitetónica. Investigación, tendencias e innovaciones. La fecha de publicación es la fecha de lectura

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the year 1999 approves the Law of Construction Building (LOE, in Spanish) to regulate a sector such as construction, which contained some shortcomings from the legal point of view. Currently, the LOE has been in force 12 years, changing the spanish world of the construction, due to influenced by internationalization. Within the LOE, there regulating the different actors involved in the construction building, as the Projects design, the Director of Construction, the developer, The builder, Director of execution of the construction (actor only in Spain, similar as construcion engineer and abroad in), control entities and the users, but lacks figure Project manager will assume the delegation of the promoter helping and you organize, direct and management the process. This figure assumes that the market and contracts are not legally regulated in Spain, then should define and establish its regulation in the LOE. (Spain Construction Law) The translation in spanish of the words "Project Manager is owed to Professor Rafael de Heredia in his book Integrated Project Management, as agent acting on behalf of the organization and promoter assuming control of the project, ie Integraded Project Management . Already exist in Spain, AEDIP (Spanish Association Integrated of Project Construction management) which comprises the major companies in “Project Management” in Spain, and MeDIP (Master in Integrated Construction Project) the largest and most advanced studies at the Polytechnic University of Madrid, in "Construction Project Management" they teach which is also in Argentina. The Integrated Project ("Project Management") applied to the construction process is a methodological technique that helps to organize, control and manage the resources of the promoters in the building process. When resources are limited (which is usually most situations) to manage them efficiently becomes very important. Well, we find that in this situation, the resources are not only limited, but it is limited, so a comprehensive control and monitoring of them becomes not only important if not crucial. The alternative of starting from scratch with a team that specializes in developing these follow directly intervening to ensure that scarce resources are used in the best possible way requires the use of a specific methodology (Manual DIP, Matrix Foreign EDR breakdown structure EDP Project, Risk Management and Control, Design Management, et ..), that is the methodology used by "Projects managers" to ensure that the initial objectives of the promoters or investors are met and all actors in process, from design to construction company have the mind aim of the project will do, trying to get their interests do not prevail over the interests of the project. Among the agents listed in the building process, "Project Management" or DIPE (Director Comprehensive building process, a proposed name for possible incorporation into the LOE, ) currently not listed as such in the LOE (Act on Construction Planning ), one of the agents that exist within the building process is not regulated from the legal point of view, no obligations, ie, as is required by law to have a project, a builder, a construction management, etc. DIPE only one who wants to hire you as have been advanced knowledge of their services by the clients they have been hiring these agents, there being no legal obligation as mentioned above, then the market is dictating its ruling on this new figure, as if it were necessary, he was not hired and eventually disappeared from the building process. As the aim of this article is regular the process and implement the name of DIPE in the Spanish Law of buildings construction (LOE)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Includes index.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The project management literature on project success is rich. Numerous papers focus on the evolution of the understanding of project success, identification of success criteria and critical success factors. Critical success factors increase the potential for achieving project success, while project success can be evaluated with the help of success criteria. Although the interrelationships between critical success factors and success criteria are rarely analyzed, yet there is a strong demand for it. The aim of this paper is twofold. One of the aims is to identify the impact of one of the critical success factors, the project manager’s project management attitude on project success. The other aim is to highlight the interrelationship between the project manager’s personal characteristics and project management attitude and leadership style, which are three critical success factors. These aim to address the shortcoming mentioned above, which is considering the lack of the interrelationships between critical success factors and success criteria. The research outcomes are drawn from qualitative field research at the Hungarian subsidiaries of multinational companies operating in the ICT sector.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The universities rely on the Information Technology (IT) projects to support and enhance their core strategic objectives of teaching, research, and administration. The researcher’s literature review found that the level of IT funding and resources in the universities is not adequate to meet the IT demands. The universities received more IT project requests than they could execute. As such, universities must selectively fund the IT projects. The objectives of the IT projects in the universities vary. An IT project which benefits the teaching functions may not benefit the administrative functions. As such, the selection of an IT project is challenging in the universities. To aid with the IT decision making, many universities in the United States of America (USA) have formed the IT Governance (ITG) processes. ITG is an IT decision making and accountability framework whose purpose is to align the IT efforts in an organization with its strategic objectives, realize the value of the IT investments, meet the expected performance criteria, and manage the risks and the resources (Weil & Ross, 2004). ITG in the universities is relatively new, and it is not well known how the ITG processes are aiding the nonprofit universities in selecting the right IT projects, and managing the performance of these IT projects. This research adds to the body of knowledge regarding the IT project selection under the governance structure, the maturity of the IT projects, and the IT project performance in the nonprofit universities. The case study research methodology was chosen for this exploratory research. The convenience sampling was done to choose the cases from two large, research universities with decentralized colleges, and two small, centralized universities. The data were collected on nine IT projects from these four universities using the interviews and the university documents. The multi-case analysis was complemented by the Qualitative Comparative Analysis (QCA) to systematically analyze how the IT conditions lead to an outcome. This research found that the IT projects were selected in the centralized universities in a more informed manner. ITG was more authoritative in the small centralized universities; the ITG committees were formed by including the key decision makers, the decision-making roles, and responsibilities were better defined, and the frequency of ITG communication was higher. In the centralized universities, the business units and colleges brought the IT requests to ITG committees; which in turn prioritized the IT requests and allocated the funds and the resources to the IT projects. ITG committee members in the centralized universities had a higher awareness of the university-wide IT needs, and the IT projects tended to align with the strategic objectives. On the other hand, the decentralized colleges and business units in the large universities were influential and often bypassed the ITG processes. The decentralized units often chose the “pet” IT projects, and executed them within a silo, without bringing them to the attention of the ITG committees. While these IT projects met the departmental objectives, they did not always align with the university’s strategic objectives. This research found that the IT project maturity in the university could be increased by following the project management methodologies. The IT project management maturity was found higher in the IT projects executed by the centralized university, where a full-time project manager was assigned to manage the project, and the project manager had a higher expertise in the project management. The IT project executed under the guidance of the Project Management Office (PMO) has exhibited a higher project management maturity, as the PMO set the standards and controls for the project. The IT projects managed by the decentralized colleges by a part-time project manager with lower project management expertise have exhibited a lower project management maturity. The IT projects in the decentralized colleges were often managed by the business, or technical leads, who often lacked the project management expertise. This research found that higher the IT project management maturity, the better is the project performance. The IT projects with a higher maturity had a lower project delay, lower number of missed requirements, and lower number of IT system errors. This research found that the quality of IT decision in the university could be improved by centralizing the IT decision-making processes. The IT project management maturity could be improved by following the project management methodologies. The stakeholder management and communication were found critical for the success of the IT projects in the university. It is hoped that the findings from this research would help the university leaders make the strategic IT decisions, and the university’s IT project managers make the IT project decisions.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

O estágio desenvolvido na empresa de construção Manuel da Graça Peixito, incidiu sobre Direcção e Gestão de Obra na execução de um projecto de reconversão urbanística a aplicar na AUGI 42 localizada no Casal do Sapo em Sesimbra. As áreas urbanas de génese ilegal, denominadas de AUGI, surgiram no inicio da década de 60, como um fenómeno que surgiu de forma a colmatar a carência no parque habitacional das periferias das grandes áreas metropolitanas do território nacional. O ambiente urbano gerado pela existência das AUGI, muitas vezes de proporções de grande dimensão, evidencia inúmeras carências e problemas a níveis sociais, económicos, urbanísticos e legais. A gestão de obra é uma actividade essencial na execução da obra e no planeamento de todas as tarefas a realizar com o melhor tratamento económico e financeiro. A direcção de obra tem como principais funções a selecção de recursos humanos, escolha e montagem dos órgãos de apoio logístico, a aquisição atempada e negociação de materiais. O Gestor e Director de Obra é colocado num ciclo operacional de optimização de recursos e eficiências, em que as duas funções, gestão e direcção de obra, são complementares e a abordagem do contexto interactivo do controlo da obra, em termos da produção, da gestão económica e financeira, da gestão do tempo, do cumprimento das normas de saúde e segurança no trabalho e no assegurar da qualidade, são claramente identificadas, enquanto veículo indispensável do cumprimento do contrato de empreitada. O processo de reconversão urbanística aplicado na AUGI 42 teve como estrutura de proposta a seguinte base: primeiro na recolha de dados relativo à AUGI 42 e na definição de um planeamento do faseamento numa estratégia de execução da empreitada; segundo na constituição e caracterização da execução de variadas infra-estruturas (rede de drenagem de esgotos domésticos e pluviais, rede de abastecimento de águas, rede de telecomunicações, rede eléctrica, rede de gás, rede viária e arranjos de espaços exteriores). Este processo e consequente proposta surgem como um contributo fundamental na melhoria da qualidade de vida das populações, como também da funcionalidade do sistema urbano que compõe as AUGI.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Trabalho de natureza profissional para a atribuição do Título de Especialista do Instituto Politécnico do Porto, na área de Design, defendido a 23-03-2015.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The authors propose a mathematical model to minimize the project total cost where there are multiple resources constrained by maximum availability. They assume the resources as renewable and the activities can use any subset of resources requiring any quantity from a limited real interval. The stochastic nature is inferred by means of a stochastic work content defined per resource within an activity and following a known distribution and the total cost is the sum of the resource allocation cost with the tardiness cost or earliness bonus in case the project finishes after or before the due date, respectively. The model was computationally implemented relying upon an interchange of two global optimization metaheuristics – the electromagnetism-like mechanism and the evolutionary strategies. Two experiments were conducted testing the implementation to projects with single and multiple resources, and with or without maximum availability constraints. The set of collected results shows good behavior in general and provide a tool to further assist project manager decision making in the planning phase.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The purpose of the Master’s Thesis is to study the best practices to virtual project management from the project manager’ point of view. The best practices are divided according to a five-phase virtual project life cycle model. Each phase include concrete suggestions for actions. Research’s theoretical background is wide because of the broad subject matter. In the theoretical part topics such as virtual working, virtual project management challenges are examined and some concrete actions to tackle these challenges are introduced. Thesis’ approach is constructive, where a known problem is solved piece by piece after creating a pre-understanding of the topic. Existing research work is utilized when creating a model for virtual project team management. The basis of the model comes from various best practices read from literature and from the interviews conducted on experienced virtual project managers in the case organization. As a result the model combines both previous research and the organizations empirical experience. As an output of the thesis a model for virtual project team management is developed, which can be used as a guideline by the virtual project managers in their work. The model includes actions and practices what can be used to overcome the challenges of virtual project management.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The purpose of the study is to find factors affecting projects' profitability in project business. The issue is approached from customer profitability and project management point of view. The study has been made for a big Finnish company acting in a global market place. The research method is quantitative. Research hypotheses are based on the literature. The used database is originated from the company's ERP- (enterprise resource planning) and project financial follow-up —system. The findings of the study supported the hypotheses weakly. Obviously profitability fluctuated depending on a customer and a project manager. The reasons could not be justified with the variables used in the research.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Työn tavoitteena on kirjallisuutta tutkien etsiä toiminnanohjausjärjestelmän implementointiprosessissa esiintyviä ongelmia ja niiden ratkaisuja. Löydetyt ongelmat liittyvät suurelta osin yrityksen johtoon, projektipäällikköön ja -ryhmään, ohjelmistoon sekä loppukäyttäjiin. Suurimmat ongelmat koskevat muutoskäyttäytymistä, projektin johtamista eri muodoissa, ohjelmiston valintaa sekä työntekijöiden kouluttamista. Työn sisältönä on kirjallisuuskatsaus ongelmista ja menestystekijöistä implementointiprosessissa sekä erilaisten ratkaisu- ja toimintamallien esittäminen ongelmien ratkaisemiseksi. Lopputuloksena on opas, jonka avulla implementointiprosessi voidaan viedä menestyksekkäästi loppuun asti.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The main goal of this thesis was to examine how the emotional intelligence skills and multicultural project leadership style of a project manager interrelate and affect the success of a project. The research methods used are literature review in theoretical part of the thesis and semi-structured interviews in empirical part of the thesis. This study is a single case study i.e. one case company was selected to be the secondary level of analysis. Within the case company, four project managers were selected as research units to form the primary level of analysis. Literature review formed the basis for the empirical research and the interview questions were derived from the literature. Findings from the interviews were mirrored against the literature review findings, based on which both conclusions and generalisations could be made. Thus, both deductive and inductive methods were utilised to get more complete picture about the research topic. In the first part of the literature review the general leadership theories and the project leadership terminology are introduced as a background for the concept of emotional intelligence and the integrated leadership model. Emotional intelligence and its interrelation to different leadership concepts are discussed during the literature review. Chinese cultural aspects affecting the way of making business, and the multicultural leadership styles of the Finnish project managers are introduced in the following part of the literature review. It was found that the most successfully used multicultural leadership styles in Finnish-Chinese context are synergistic and polycentric, and these require emotional intelligence skills. In the empirical part on this thesis the findings from the semi-structured interviews are introduced, discussed and analysed. Interviews were done in private meeting rooms, and they were recorded and transcripted to add reliability and validity. Although the sample was only four project managers, the results show that the sample is quite saturated as the responses to several questions followed the same pattern. It was found that Finnish project managers in the case company are democratic and take cultural differences into account in their project leadership. Both synergistic and polycentric leadership styles are used with Chinese team members. Emotional intelligence capabilities and the emphasis of those differ a bit depending on the interviewee. Though, the results show that EI skills and the multicultural project leadership style used in Chinese context are interrelated. The findings from the literature review and the empirical research in this thesis are similar. Though, there is need for further research as the sample was small, and this thesis is a single case study. It is recommendable to make a multi-company study with larger sample of project managers. Also multi-industry perspective is recommendable for further research.