906 resultados para Project Management Maturity Model
Resumo:
BCM (business continuity Management) is a holistic management process aiming at ensuring business continuity and building organizational resilience. Maturity models offer organizations a tool for evaluating their current maturity in a certain process. In the recent years BCM has been subject to international ISO standardization, while the interest of organizations to bechmark their state of BCM agains standards and the use of maturity models for these asessments has increased. However, although new standards have been introduced, very little attention has been paid to reviewing the existing BCM maturity models in research - especially in the light of the new ISO 22301 standard for BCM. In this thesis the existing BCM maturily models are carefully evaluated to determine whetherthey could be improved. In order to accomplish this, the compliance of the existing models to the ISO 22301 standard is measured and a framework for assessing a maturitymodel´s quality is defined. After carefully evaluating the existing frameworks for maturity model development and evaluation, an approach suggested by Becker et al. (2009) was chosen as the basis for the research. An additionto the procedural model a set of seven research guidelines proposed by the same authors was applied, drawing on the design-science research guidelines as suggested by Hevner et al. (2004). Furthermore, the existing models´ form and function was evaluated to address their usability. Based on the evaluation of the existing BCM maturity models, the existing models were found to have shortcomings in each dimension of the evaluation. Utilizing the best of the existing models, a draft version for an enhanced model was developed. This draft model was then iteratively developed by conducting six semi-structured interviews with BCM professionals in finland with the aim of validating and improving it. As a Result, a final version of the enhanced BCM maturity model was developed, conforming to the seven key clauses in the ISO 22301 standard and the maturity model development guidelines suggested by Becker et al. (2009).
Resumo:
Are you ready for a tender project? – Analysis of organisational project management maturity in the Austrian- Hungarian border region. Since the 1990s the European Union has paid more and more attention to subsidising cross-border development. It is understandable that different funding from proposal sources is particularly important for the border area, especially to those of utmost importance that support co-operation and rural development. Therefore, they could become a driving force for development. The authors’ research analyses the organisational project management maturity of the projects implemented in the frame of the Austria-Hungary Cross-border Cooperation Programme 2007-2013 (AT-HU). Analysing this kind of organisation is an important issue, since the new call for proposals are open in 2016 and the results of this study may provide a self-evaluation opportunity to organisations that need to know if they are ready or mature enough for a new tender project. The aim of this study was twofold. First of all, those indicators that could be used to analyse the project management maturity of implementing organisations in the AT-HU programme were identified. Based on the empirical research these are the project experience accumulated by the organisation, the internal processes operating at the institution and the professional background. Secondly, factors that can affect this project management maturity were explored and we determined five influencing area: the organisational structure, culture, project managers motivation and the typical and important competences.
Resumo:
Purpose – The purpose of the paper was to conduct an empirical investigation to explore the impact of project management maturity models (PMMMs) on improving project performance. Design/methodology/approach – The investigation used a cross-case analysis involving over 90 individuals in seven organisations. Findings – The findings of the empirical investigation indicate that PMMMs demonstrate very high levels of variability in individual's assessment of project management maturity. Furthermore, at higher levels of maturity, the type of performance improvement adopted following their application is related to the type of PMMM used in the assessment. The paradox of the unreliability of PMMMs and their widespread acceptance is resolved by calling upon the “wisdom of crowds” phenomenon which has implications for the use of maturity model assessments in other arena. Research limitations/implications – The investigation does have the usual issues associated with case research, but the steps that have been taken in the cross-case construction and analysis have improved the overall robustness and extendibility of the findings. Practical implications – The tendency for PMMMs to shape improvements based on their own inherent structure needs further understanding. Originality/value – The use of empirical methods to investigate the link between project maturity models and extant changes in project management performance is highly novel and the findings that result from this have added resonance.
Resumo:
Increasing the maturity in Project Management (PM) has become a goal for many organizations, leading them to adopt maturity models to assess the current state of its PM practices and compare them with the best practices in the industry where the organization is inserted. One of the main PM maturity models is the Organizational Project Management Maturity Model (OPM3®), developed by the Project Management Institute. This paper presents the Information Systems and Technologies organizations outcome analysis, of the assesses made by the OPM3® Portugal Project, identifying the PM processes that are “best” implemented in this particular industry and those in which it is urgent to improve. Additionally, a comparison between the different organizations’ size analyzed is presented.
Resumo:
This paperwork attempts to measure the project management maturity in the State Department of Taxation in Rio Grande do Norte. Project management has shown to be a critical component to any organization success, as the projects are directly related to a set of activities resulting into organizational innovations such as products, services and processes; and its improvement is directly aligned with the strategic management. Methodologically, this paperwork uses both a quantitative and qualitative approach that will be applied to the coordinators, sub-coordinators, and directors of the Regional Offices of the State Department of Taxation. In the theoretical reference it is about the public management and analyzes the strategic management in contemporary public administration. Presents the maturity in project management is by discussing the main models: CMM, Capability Maturity Model; PMMM, Project Management Maturity Model; OPM3, Organization Project Maturity Model and the Prado-MMGP, Modelo de Maturidade em Gerenciamento de Projetos. From this analysis, considering attributes as an aid in taking strategic positioning, access to the model, possibility of benchmarking and continuous improvement, the Prado-MMGP model was the most appropriate for this research process. It has been proved that the State Department of Taxation shows a very low project management maturity level. Regarding the acceptance of the maturity dimensions by the State Department, it is still in an early developmental stage, as one of the dimensions showed a poor performance while the rest showed a regular one. In contrast with similar organizations, the maturity results have shown to be below the national average. The maturity assessment enables in the institution the implementation of a plan for institutional growth with the creation of sector strategic and project management
Resumo:
The aim of this study is to investigate the role of operational flexibility for effective project management in the construction industry. The specific objectives are to: a) Identify the determinants of operational flexibility potential in construction project management b) Investigate the contribution of each of the determinants to operational flexibility potential in the construction industry c) Investigate on the moderating factors of operational flexibility potential in a construction project environment d) Investigate whether moderated operational flexibility potential mediates the path between predictors and effective construction project management e) Develop and test a conceptual model of achieving operational flexibility for effective project management The purpose of this study is to findout ways to utilize flexibility inorder to manage uncertain project environment and ultimately achieve effective project management. In what configuration these operational flexibility determinants are demanded by construction project environment in order to achieve project success. This research was conducted in three phases, namely: (i) exploratory phase (ii) questionnaire development phase; and (iii) data collection and analysis phase. The study needs firm level analysis and therefore real estate developers who are members of CREDAI, Kerala Chapter were considered. This study provides a framework on the functioning of operational flexibility, offering guidance to researchers and practitioners for discovering means to gain operational flexibility in construction firms. The findings provide an empirical understanding on kinds of resources and capabilities a construction firm must accumulate to respond flexibly to the changing project environment offering practitioners insights into practices that build firms operational flexibility potential. Firms are dealing with complex, continuous changing and uncertain environments due trends of globalization, technical changes and innovations and changes in the customers’ needs and expectations. To cope with the increasingly uncertain and quickly changing environment firms strive for flexibility. To achieve the level of flexibility that adds value to the customers, firms should look to flexibility from a day to day operational perspective. Each dimension of operational flexibility is derived from competences and capabilities. In this thesis only the influence on customer satisfaction and learning exploitation of flexibility dimensions which directly add value in the customers eyes are studied to answer the followingresearch questions: “What is the impact of operational flexibility on customer satisfaction?.” What are the predictors of operational flexibility in construction industry? .These questions can only be answered after answering the questions like “Why do firms need operational flexibility?” and “how can firms achieve operational flexibility?” in the context of the construction industry. The need for construction firms to be flexible, via the effective utilization of organizational resources and capabilities for improved responsiveness, is important because of the increasing rate of changes in the business environment within which they operate. Achieving operational flexibility is also important because it has a significant correlation with a project effectiveness and hence a firm’s turnover. It is essential for academics and practitioners to recognize that the attainment of operational flexibility involves different types namely: (i) Modification (ii) new product development and (iii) demand management requires different configurations of predictors (i.e., resources, capabilities and strategies). Construction firms should consider these relationships and implement appropriate management practices for developing and configuring the right kind of resources, capabilities and strategies towards achieving different operational flexibility types.
Resumo:
Today a number of studies are published on how organizational strategy is developed and how organizations contribute to local and regional development through the realization of these strategies. There are also many articles dealing with the success of a project by identifying the criteria and the factors that influence them. This article introduces the project-oriented strategic planning process that reveals how projects contribute to local and regional development and demonstrates the relationship between this approach and the regional competitiveness model as well as the KRAFT concept. There is a lot of research that focuses on sustainability in business. These studies argue that sustainability is very important to the success of a business in the future. The Project Excellence Model that analyses project success does not contain the sustainability criteria; the GPM P5 standard consists of sustainability components related either to the organizational level. To fill this gap a Project Sustainability Excellence Model (PSEM) was developed. The model was tested by interviews with managers of Hungarian for-profit and non-profit organizations. This paper introduces the PSEM and highlights the most important elements of the empirical analysis.
Resumo:
En la actualidad, las buenas prácticas del Project Management Institute, Inc. (PMI®) son utilizadas en muchas organizaciones para la estructuración, ejecución y cierre de diversos proyectos; las buenas prácticas recogidas por este Instituto han servido de base para que las empresas logren conseguir los objetivos estratégicos con una correcta gestión de los programas y proyectos que se vayan a emprender -- El sector de la construcción no es ajeno a la aplicación de estos estándares, más aún cuando el común denominador son los sobrecostos, la prolongación del cronograma y la variación del alcance, que finalmente terminan afectado la rentabilidad de los proyectos y redundan en la rentabilidad de la empresa -- Mabego S.A.S., es una empresa nueva dedicada a la estructuración, ejecución y venta de proyectos inmobiliarios, cuyo centro de operación es la ciudad de Pasto-Departamento de Nariño, el objetivo principal de la empresa es penetrar el mercado inmobiliario local, teniendo como fortalezas la experiencia y conocimiento aportado por los socios -- Con el presente trabajo se analizan los cuarenta y siete (47) procesos dentro de los grupos de inicio, planeación, ejecución, monitoreo y control, además de cierre establecidos en las diez (10) áreas del conocimiento que establece el PMI® en la guía de los fundamentos para la dirección de proyectos (Guía del PMBOK® - Project Management Body of Knowledge) quinta edición; se crea una metodología de acuerdo a las necesidades de la organización; para conseguirlo se analizaron cada uno de los procesos establecidos en el PMI® y como resultado se presenta la estandarización por medio de formatos y procedimientos que ayudan a la empresa a cumplir con los objetivos específicos de cada uno de sus proyectos -- La pertinencia del trabajo radica en la necesidad de la empresa Mabego S.A.S., de formalizar los procedimientos dentro de la misma, esto debido a que se pretende lograr una correcta estructuración, ejecución y liquidación de los proyectos, además, se aplicó una metodología definida con el objetivo de estandarizar los procesos internos y así lograr un posicionamiento en el sector de la construcción por medio del reconocimiento del cliente en la entrega a tiempo y con la calidad propuesta en los documentos de venta del proyecto
Resumo:
This study analyzes the manifestation of the dimensions of Entrepreneurial Orientation (EO) and Project Management Systems (PMS). We used a qualitative approach to conduct exploratory research through a study in literature and a pilot case in a software company. Data was collected from semi structured interviews, documents, and records on file, then triangulated and treated with content analysis. The model proposed for the relationship between the types of PMS (ad hoc, Classic PM, innovation, entrepreneurship/intrapreneurship) and the dimensions of EO (innovativeness, risk-taking, proactiveness, competitive aggressiveness, and autonomy), was partially corroborated by empirical studies. New studies are suggested to validate the applicability and setup of the model.
Resumo:
Software development is a discipline that is almost as old as the history of computers. With the advent of the Internet and all of its related technologies, software development has been on high demand. But, and especially in SME (small and medium enterprise), this was not accompanied with a comparable effort to develop a set of sustainable and standardized activities of project management, which lead to increasing inefficiencies and costs. Given the actual economic situation, it makes sense to engage in an effort to reduce said inefficiencies and rising costs. For that end, this work will analyze the current state of software development’s project management processes on a Portuguese SME, along with its problems and inefficiencies in an effort to create a standardized model to manage software development, with special attention given to critical success factors in an agile software development environment, while using the best practices in process modeling. This work also aims to create guidelines to correctly integrate these changes in the existing IS structure of a company.
Resumo:
Tuotekehityksestä ja sen johtamisesta on tullut erittäin tärkeä osa tietoliikenneteollisuutta. Jatkuva teknologinen kehitys ja lyhentyneet tuotteiden elinkaaret ovat saaneet yritykset panostamaan tuotekehitysprosesseihin ja johtamiseen. Erityisesti nopeatempoiset ja lyhytkestoiset projektit onkin koettu ongelmallisiksi. Diplomityön tavoitteena oli tutkia teoriassa uusien tuotteiden tuotekehitystä, tuotekehitysprosesseja sekä projektijohtamista. Käytännön osuudessa oli tavoitteena kehittää kokeellinen tuotekehitysmalli nopeatempoisten ja lyhytkestoisten tuotekehitysprojektien tarpeisiin muuttuvissa ja epävarmoissa olosuhteissa. Tavoitteena oli myös käyttää ja analysoida kehitettyä kokeellista tuotekehitysmallia lyhytkestoisen tuotekehitysprojektin yhteydessä. Työn tuloksena saatiin ohjelmistotuote vaadituilla ominaisuuksilla vaaditussa ajassa ja todettiin projektissa käytetyn kokeellisen tuotekehitysmallin osoittautuneen toimivaksi. Jatkotutkimuksia tarvitaan selvittämään mallin sopivuutta ja sen kehityskohteita erilaisten tuotekehitysprojektien kohdalla.
Resumo:
Stora Enso has research centres in Finland, Sweden and Germany. The research centres use PIMS as a research project invoicing and monitoring system. Possible reorganization and new financing model for R&D functions have been considered and the project management system should be developed to support the new operation model. The objective of this thesis is to find a model for R&D project management, and to present the project management system of Stora Enso, and to discuss if the current system could be developed to respond to the new needs or should it be replaced with another system. The theoretical part of the study describes challenges in R&D project management, and presents different project characteristics, and methods for managing R&D project portfolio. It is also described how the project management system can support project monitoring and controlling, and how inter-project learning can be enhanced. The empirical part of the study presents the current project management system of Stora Enso and how the system should be developed to support Stora Enso’s R&D functions better. In conclusion, it is stated that there is no relevant reason to replace PIMS with another system, because PIMS can be developed to support R&D project management better with a hybrid system. It is also suggested that the new financing model should not be implemented before more comprehensive analysis of its effects is conducted.
Resumo:
The main aim of this study was to develop the project management framework model which would serve as the new model to follow for upcoming projects at the Lappeenranta cement plant. The other goal was to execute the SNCR (selective non catalytic reduction) project successfully so that the nitrogen oxides emissions are below the stated emission limit when the new emission limit comes into effect beginning in July, 2008. Nitrogen oxides, project management aspects, SNCR and the invested system are explained in the theory part. In the practical part of the study, the SNCR project in the Lappeenranta cement plant was executed and the findings were documented. In order to reach the aim of this study, a framework of project management was made. The framework is based on the executed SNCR project, previous projects in the cement plant and on the available literature relating to the subject matter. The developed project turned out to be successful.
Resumo:
After decades of mergers and acquisitions and successive technology trends such as CRM, ERP and DW, the data in enterprise systems is scattered and inconsistent. Global organizations face the challenge of addressing local uses of shared business entities, such as customer and material, and at the same time have a consistent, unique, and consolidate view of financial indicators. In addition, current enterprise systems do not accommodate the pace of organizational changes and immense efforts are required to maintain data. When it comes to systems integration, ERPs are considered “closed” and expensive. Data structures are complex and the “out-of-the-box” integration options offered are not based on industry standards. Therefore expensive and time-consuming projects are undertaken in order to have required data flowing according to business processes needs. Master Data Management (MDM) emerges as one discipline focused on ensuring long-term data consistency. Presented as a technology-enabled business discipline, it emphasizes business process and governance to model and maintain the data related to key business entities. There are immense technical and organizational challenges to accomplish the “single version of the truth” MDM mantra. Adding one central repository of master data might prove unfeasible in a few scenarios, thus an incremental approach is recommended, starting from areas most critically affected by data issues. This research aims at understanding the current literature on MDM and contrasting it with views from professionals. The data collected from interviews revealed details on the complexities of data structures and data management practices in global organizations, reinforcing the call for more in-depth research on organizational aspects of MDM. The most difficult piece of master data to manage is the “local” part, the attributes related to the sourcing and storing of materials in one particular warehouse in The Netherlands or a complex set of pricing rules for a subsidiary of a customer in Brazil. From a practical perspective, this research evaluates one MDM solution under development at a Finnish IT solution-provider. By means of applying an existing assessment method, the research attempts at providing the company with one possible tool to evaluate its product from a vendor-agnostics perspective.