This paper proposes a new multi-resource multi-stage mine production timetabling problem for optimising the open-pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is analysed based on the real-life data from an Australian iron ore mine site. The objective of the model is to maximise the throughput and minimise the total idle times of equipment at each stage. The following comprehensive mining attributes and constraints are considered: types of equipment; operating capacities of equipment; ready times of equipment; speeds of equipment; block-sequence-dependent movement times; equipment-assignment-dependent operational times; etc. The model also provides the availability and usage of equipment units at multiple operational stages such as drilling, blasting and excavating stages. The problem is formulated by mixed integer programming and solved by ILOG-CPLEX optimiser. The proposed model is validated with extensive computational experiments to improve mine production efficiency at the operational level.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper proposes a new multi-stage mine production timetabling (MMPT) model to optimise open-pit mine production operations including drilling, blasting and excavating under real-time mining constraints. The MMPT problem is formulated as a mixed integer programming model and can be optimally solved for small-size MMPT instances by IBM ILOG-CPLEX. Due to NP-hardness, an improved shifting-bottleneck-procedure algorithm based on the extended disjunctive graph is developed to solve large-size MMPT instances in an effective and efficient way. Extensive computational experiments are presented to validate the proposed algorithm that is able to efficiently obtain the near-optimal operational timetable of mining equipment units. The advantages are indicated by sensitivity analysis under various real-life scenarios. The proposed MMPT methodology is promising to be implemented as a tool for mining industry because it is straightforwardly modelled as a standard scheduling model, efficiently solved by the heuristic algorithm, and flexibly expanded by adopting additional industrial constraints.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Metaphor is a multi-stage programming language extension to an imperative, object-oriented language in the style of C# or Java. This paper discusses some issues we faced when applying multi-stage language design concepts to an imperative base language and run-time environment. The issues range from dealing with pervasive references and open code to garbage collection and implementing cross-stage persistence.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A new set of primitive extraterrestrial materials collected in the Earth's stratosphere include Chondritic Porous Aggregates (CPA's) [1]. CPAs have a complex and variable mineralogy [1-3] that include 'organic compounds' [4,5] and poorly graphitised carbon (PGC)[6]. This study presents a continuation of our detailed Analytical Electron Microscope study on carbon-rich CPA W7029*A from the JSC Cosmic Dust Collection. This CPA is an uncontaminated sample that survived atmospheric entry without appreciable alteration [7] and which contains ~44% carbonaceous material. The carbonaceous composition of selected particles was confirmed by Electron Energy Loss Spectroscopy and Selected Area Electron Diffraction (SAED). Possible carbonaceous contaminants introduced by specimen preparation techniques are easily recognised from indigenous CPA carbon particles [8] and do not bias our interpretations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In order to establish the influence of the drying air characteristics on the drying performance and fluidization quality of bovine intestine for pet food, several drying tests have been carried out in a laboratory scale heat pump assisted fluid bed dryer. Bovine intestine samples were heat pump fluidized bed dried at atmospheric pressure and at temperatures below and above the materials freezing points, equipped with a continuous monitoring system. The investigation of the drying characteristics have been conducted in the temperature range −10 to 25 ◦C and the airflow in the range 1.5–2.5 m/s. Some experiments were conducted as single temperature drying experiments and others as two stage drying experiments employing two temperatures. An Arrhenius-type equation was used to interpret the influence of the drying air temperature on the effective diffusivity, calculated with the method of slopes in terms of energy activation, and this was found to be sensitive to the temperature. The effective diffusion coefficient of moisture transfer was determined by the Fickian method using uni-dimensional moisture movement in both moisture, removal by evaporation and combined sublimation and evaporation. Correlations expressing the effective moisture diffusivity and drying temperature are reported. Bovine particles were characterized according to the Geldart classification and the minimum fluidization velocity was calculated using the Ergun Equation and generalized equation for all drying conditions at the beginning and end of the trials. Walli’s model was used to categorize stability of the fluidization at the beginning and end of the dryingv for each trial. The determined Walli’s values were positive at the beginning and end of all trials indicating stable fluidization at the beginning and end for each drying condition.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A multi-resource multi-stage scheduling methodology is developed to solve short-term open-pit mine production scheduling problems as a generic multi-resource multi-stage scheduling problem. It is modelled using essential characteristics of short-term mining production operations such as drilling, sampling, blasting and excavating under the capacity constraints of mining equipment at each processing stage. Based on an extended disjunctive graph model, a shifting-bottleneck-procedure algorithm is enhanced and applied to obtain feasible short-term open-pit mine production schedules and near-optimal solutions. The proposed methodology and its solution quality are verified and validated using a real mining case study.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We present new evidence for sector collapses of the South Soufrière Hills (SSH) edifice, Montserrat during the mid-Pleistocene. High-resolution geophysical data provide evidence for sector collapse, producing an approximately 1 km3 submarine collapse deposit to the south of SSH. Sedimentological and geochemical analyses of submarine deposits sampled by sediment cores suggest that they were formed by large multi-stage flank failures of the subaerial SSH edifice into the sea. This work identifies two distinct geochemical suites within the SSH succession on the basis of trace-element and Pb-isotope compositions. Volcaniclastic turbidites in the cores preserve these chemically heterogeneous rock suites. However, the subaerial chemostratigraphy is reversed within the submarine sediment cores. Sedimentological analysis suggests that the edifice failures produced high-concentration turbidites and that the collapses occurred in multiple stages, with an interval of at least 2 ka between the first and second failure. Detailed field and petrographical observations, coupled with SEM image analysis, shows that the SSH volcanic products preserve a complex record of magmatic activity. This activity consisted of episodic explosive eruptions of andesitic pumice, probably triggered by mafic magmatic pulses and followed by eruptions of poorly vesiculated basaltic scoria, and basaltic lava flows.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper proposes a new multi-resource multi-stage scheduling problem for optimising the open-pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is analysed based on the real-life data from an Australian iron ore mine site. The objective of the model is to maximise the throughput and minimise the total idle times of equipment at each stage. The following comprehensive mining attributes and constraints have been considered: types of equipment; operating capacities of equipment; ready times of equipment; speeds of equipment; block-sequence-dependent movement times of equipment; equipment-assignment-dependent operation times of blocks; distances between each pair of blocks; due windows of blocks; material properties of blocks; swell factors of blocks; and slope requirements of blocks. It is formulated by mixed integer programming and solved by ILOG-CPLEX optimiser. The proposed model is validated with extensive computational experiments to improve mine production efficiency at the operational level. The model also provides an intelligent decision support tool to account for the availability and usage of equipment units for drilling, blasting and excavating stages.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study proposes that technology adoption be considered as a multi-stage process constituting several distinct stages. Using the Theory of Planned Behaviour (TPB), Ettlie’s adoption stages and by employing data gathered from 162 owners of Small and Medium-sized Enterprises (SMEs), our findings show that the determinants of the intention to adopt packaged software fluctuate significantly across adoption stages.