936 resultados para Maturidade em gerenciamento de projetos
Resumo:
Changing has been addressed by projects and it had happened in a fast and disarrenged way. In consequence of the increasing on demand for projects, to get better success rate is essential manage projects adequately. The creation of an organitional structure intended to concentrate the development of process and methodologies is a great initiative to spread the projects management concepts. The purpose of this work is to apply a model to analyse the maturity level on project management of the Petrobras IT Department and indicate an Project Management Office adequated to the level found, that could be improved with the increase of the maturity level.
Resumo:
This study aimed to measure the perception of maturity project management of state boards of Rio Grande do Norte by the perception of its managers. Argues that project management has been highlighted as a critical factor for the success of any organization, because the projects are directly related to the set of activities that result in organizational innovation as products, services and processes and the improvement of project management is directly aligned with the main pillars of the New Public Management. Methodologically, this is a quantitative research of a descriptive nature in which 161 forms were applied with coordinators and subcoordinators of state departments of Rio Grande do Norte, culminating in a sampling error of less than 6% to 95% confidence according to the procedures finite sampling. The process of tabulation and analysis was done using the package Statistical Package for Social Sciences - SPSS 18.0 and worked with techniques such as mean, standard deviation, frequency distributions, cluster analysis and factor analysis. The results indicate that the levels of maturity in project management in state departments of Rio Grande do Norte is below the national average and that behavioral skills are the main problem for improving management in these departments. It was possible to detect the existence of two groups of different perceptions about the management of projects, indicating, according to the managers, there are islands of excellence in project management in some sectors of the state departments. It was also observed that there are eight factors that affect maturity in project management: Planning and Control , Development of Management Skills , Project Management Environment , Acceptance of the Subject Project Management , Stimulus to Performance , Project Evaluation and Learning , Project Management Office and Visibility of Project Managers . It concludes that the project management in state departments of Rio Grande do Norte has no satisfactory levels of maturity in project management, affecting the levels of efficiency and effectiveness of the state apparatus, which shows that some of the assumptions that guide the New Public Management are not getting the levels of excellence nailed by this management model
Resumo:
The purpose of this dissertation is to formulate guidelines for the improvement of maturity models, or the development of new ones, aiming at its application to project departments. The maturity of project management has become critical for organizations that develop projects and want to stand out in the market they serve. For this purpose, maturity models provide paths in order to guarantee that the institutionalization of project management is achieved in the best possible way. Generally, these models assess the organization, define its current situation in managing projects and propose steps to be performed in the search of more advanced levels of maturity. With the objective of contributing to the improvement of maturity models for specific cases, a bibliographical research was conducted for the preparation of a comparative analysis matrix and performed a case study for application of two maturity models (MMGP and PMMM levels 2 and 3), selected based on criteria found in the literature, in an engineering department of an oil company. The case study supported the realization of a comparative analysis of models, from which guidelines were formulated for improvement. The results showed that thedepartment is evaluated in a medium stage of maturity, recording significant progress in some dimensions assessed. They also found that the results of applying the two models are presented as complementary, although the model is highlighted by the greater depth of MMGP diagnostic, considering many variables in their levels of maturity than model PMMM (levels 2 and 3).Finally, directions have been formulated that contribute to the improvement of maturity models, taking in account the organizational environment in which this work was developed
Resumo:
This paperwork attempts to measure the project management maturity in the State Department of Taxation in Rio Grande do Norte. Project management has shown to be a critical component to any organization success, as the projects are directly related to a set of activities resulting into organizational innovations such as products, services and processes; and its improvement is directly aligned with the strategic management. Methodologically, this paperwork uses both a quantitative and qualitative approach that will be applied to the coordinators, sub-coordinators, and directors of the Regional Offices of the State Department of Taxation. In the theoretical reference it is about the public management and analyzes the strategic management in contemporary public administration. Presents the maturity in project management is by discussing the main models: CMM, Capability Maturity Model; PMMM, Project Management Maturity Model; OPM3, Organization Project Maturity Model and the Prado-MMGP, Modelo de Maturidade em Gerenciamento de Projetos. From this analysis, considering attributes as an aid in taking strategic positioning, access to the model, possibility of benchmarking and continuous improvement, the Prado-MMGP model was the most appropriate for this research process. It has been proved that the State Department of Taxation shows a very low project management maturity level. Regarding the acceptance of the maturity dimensions by the State Department, it is still in an early developmental stage, as one of the dimensions showed a poor performance while the rest showed a regular one. In contrast with similar organizations, the maturity results have shown to be below the national average. The maturity assessment enables in the institution the implementation of a plan for institutional growth with the creation of sector strategic and project management
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Modelos de maturidade e modelos de referência em gerenciamento de projetos têm sido implantados de forma crescente na área de tecnologia da informação (TI). Este artigo tem por objetivo analisar o impacto do grau de maturidade organizacional em gerenciamento de projetos e o da adoção de modelos de referência no sucesso de projetos de TI. Foi adotada a abordagem de pesquisa quantitativa, com levantamento junto a 51 profissionais da área. Os resultados apontam para correlação positiva entre o grau de maturidade organizacional em gerenciamento de projetos e a satisfação das demandas dos stakeholders (principais interessados no projeto). Também foi constatada relação estatística positiva entre a adoção do PMBoK e o sucesso de projetos de TI, no que concerne ao atendimento dos requisitos e satisfação das demandas dos stakeholders.
Resumo:
This study aimed to measure the perception of maturity project management of state boards of Rio Grande do Norte by the perception of its managers. Argues that project management has been highlighted as a critical factor for the success of any organization, because the projects are directly related to the set of activities that result in organizational innovation as products, services and processes and the improvement of project management is directly aligned with the main pillars of the New Public Management. Methodologically, this is a quantitative research of a descriptive nature in which 161 forms were applied with coordinators and subcoordinators of state departments of Rio Grande do Norte, culminating in a sampling error of less than 6% to 95% confidence according to the procedures finite sampling. The process of tabulation and analysis was done using the package Statistical Package for Social Sciences - SPSS 18.0 and worked with techniques such as mean, standard deviation, frequency distributions, cluster analysis and factor analysis. The results indicate that the levels of maturity in project management in state departments of Rio Grande do Norte is below the national average and that behavioral skills are the main problem for improving management in these departments. It was possible to detect the existence of two groups of different perceptions about the management of projects, indicating, according to the managers, there are islands of excellence in project management in some sectors of the state departments. It was also observed that there are eight factors that affect maturity in project management: Planning and Control , Development of Management Skills , Project Management Environment , Acceptance of the Subject Project Management , Stimulus to Performance , Project Evaluation and Learning , Project Management Office and Visibility of Project Managers . It concludes that the project management in state departments of Rio Grande do Norte has no satisfactory levels of maturity in project management, affecting the levels of efficiency and effectiveness of the state apparatus, which shows that some of the assumptions that guide the New Public Management are not getting the levels of excellence nailed by this management model
Resumo:
This study aimed to measure the perception of maturity project management of state boards of Rio Grande do Norte by the perception of its managers. Argues that project management has been highlighted as a critical factor for the success of any organization, because the projects are directly related to the set of activities that result in organizational innovation as products, services and processes and the improvement of project management is directly aligned with the main pillars of the New Public Management. Methodologically, this is a quantitative research of a descriptive nature in which 161 forms were applied with coordinators and subcoordinators of state departments of Rio Grande do Norte, culminating in a sampling error of less than 6% to 95% confidence according to the procedures finite sampling. The process of tabulation and analysis was done using the package Statistical Package for Social Sciences - SPSS 18.0 and worked with techniques such as mean, standard deviation, frequency distributions, cluster analysis and factor analysis. The results indicate that the levels of maturity in project management in state departments of Rio Grande do Norte is below the national average and that behavioral skills are the main problem for improving management in these departments. It was possible to detect the existence of two groups of different perceptions about the management of projects, indicating, according to the managers, there are islands of excellence in project management in some sectors of the state departments. It was also observed that there are eight factors that affect maturity in project management: Planning and Control , Development of Management Skills , Project Management Environment , Acceptance of the Subject Project Management , Stimulus to Performance , Project Evaluation and Learning , Project Management Office and Visibility of Project Managers . It concludes that the project management in state departments of Rio Grande do Norte has no satisfactory levels of maturity in project management, affecting the levels of efficiency and effectiveness of the state apparatus, which shows that some of the assumptions that guide the New Public Management are not getting the levels of excellence nailed by this management model
Resumo:
O perfil singular dos projetos de engenharia é caracterizado por diferenças geográficas e culturais, impactos no meio ambiente e pela aplicação de vultosos recursos financeiros e humanos, exercendo pressão para a eficaz gestão dos trabalhos nas organizações. Os resultados advindos do uso das melhores práticas em gerenciamento de projetos em milhares de empresas pelo mundo suscitaram boas expectativas às empresas brasileiras. Assim, a questão que orientou este estudo foi: " de que modo o grau de maturidade em gerenciamento de projetos determina o sucesso de empresas de projetos de engenharia?” O sucesso de empresas projetistas consiste na satisfação final de seus clientes por meio do alcance das principais metas estabelecidas para os projetos, sendo esse o core business dessas organizações. Dessa maneira, o objetivo geral deste trabalho foi o de analisar como o grau de maturidade na gestão de projetos leva ao sucesso as empresas de engenharia. Esta pesquisa classifica-se como descritiva, com abordagem qualitativa e quantitativa. A metodologia contemplou a utilização de surveys interseccionais e entrevistas com gerentes de projetos de três empresas de engenharia de médio porte com foco em mineração. Os resultados deste estudo situaram as empresas de engenharia no patamar de maturidade nível dois, também chamado de “conhecido”, em uma escala de cinco níveis. As análises das informações indicam que o fator-chave para o sucesso de empresas projetistas está no alinhamento estratégico dos projetos com a organização e na capacitação técnica da equipe. Tais fatores são alcançados mais facilmente à medida que as organizações adquirem maturidade no domínio de ferramentas, processos de trabalho e habilidades para gerir seus projetos.
Resumo:
Esta dissertação reúne os principais conceitos em gerenciamento de projetos. Em destaque, trata dos modelos de maturidade em gerenciamento de projetos, principalmente os derivados do modelo CMM (Capability Maturity Model), e suas respectivas certificações quando existentes. Como perspectiva teórica para a reflexão sobre o tema, foi utilizada a Teoria Institucional, com ênfase nos conceitos de legitimidade, isomorfismo e comportamento cerimonial. Para buscar a comprovação de indícios das pressões do ambiente nas organizações em busca de conformidade e legitimidade frente a um campo de atuação, em detrimento da eficiência, foi usada uma pesquisa qualitativa explanatória, através de um estudo de caso que analisou o processo de certificação de maturidade em gerenciamento de projetos, um campo fértil e ainda inexplorado, principalmente ao analisarmos a situação brasileira.
Resumo:
O estudo desenvolvido tem como objetivo apresentar uma visão geral da relevância e das relações entre os temas responsabilidade social e gerenciamento de projetos. Apresentando a justificativa para a necessidade de se segregar os dois temas na gestão dos projetos de responsabilidade social, o estudo aborda não só a questão da implantação da responsabilidade social nas empresas, como também busca medir o nível de utilização de práticas em gerenciamento nos projetos de responsabilidade social em uma empresa brasileira. O trabalho apresenta os principais conceitos que abordam o tema Responsabilidade Social Corporativa, bem como, os conceitos que tratam o tema Gerenciamento de Projetos. Como o tema Responsabilidade Social Corporativa deixou de ser para as empresas apenas uma questão de filantropia, mas de gestão organizacional e estratégica, o presente trabalho direciona para o levantamento da relevância do tema e da necessidade de se aplicar conceitos e práticas em gerenciamento de projetos de responsabilidade social. A questão explorada no estudo de caso desenvolvido é quanto a empresa estudada utiliza das práticas e metodologias de gerenciamento de projetos aplicadas aos projetos de responsabilidade social. Visando avaliar o cenário das organizações brasileiras, o trabalho abordou um estudo de caso de uma organização brasileira que desenvolve diversos projetos em responsabilidade social e tem ações de responsabilidade social definidas em sua estratégia organizacional. O resultado obtido no estudo de caso demonstrou que embora a empresa tenha iniciado o processo de transferência de conhecimento e padronização de práticas de gerenciamento de projetos, a percepção dos gestores e o resultado da pesquisa refletiram que essas práticas devem ser amadurecidas no ambiente de projetos corporativos.
Resumo:
The research aimed to evaluate the level of maturity of the project management office of the Public Ministry of the State of Rio Grande do Norte, on the model PMO Maturity Cube. It was based on a theoretical framework that includes project management, project management office and maturity of the project management office. The research was classified as to the purpose as exploratory and descriptive. According to the methods used was a case study, and how to approach is qualitative and quantitative. The research unit was the prosecutor of the State of Rio Grande do Norte, by two guys who represent all of the participants in the project management office of the institution. These subjects were chosen because they act with the office since the foundation of the same, having the knowledge necessary to deepen the research required, and experience with projects and work experience in the area. Data were collected through an adaptation of the evaluation form for the amplitude corporate developed and presented to the scientific environment for Pinto, Cota and Levin (2010). The results revealed that the level of maturity in the current strategic approach is 77%, and 97% desired; tactical approach in current is 66% and 97% desired, and the current operational approach is 78%, and 100% desired. He pointed out that several factors influence the level of maturity of the project management office of the Public Prosecutor and the recurrent related to information technology, regarding the storage and sharing of information. Concluded that the level of maturity of the project management office of the Public Ministry of the State of Rio Grande do Norte is advanced
Resumo:
The research aimed to evaluate the level of maturity of the project management office of the Public Ministry of the State of Rio Grande do Norte, on the model PMO Maturity Cube. It was based on a theoretical framework that includes project management, project management office and maturity of the project management office. The research was classified as to the purpose as exploratory and descriptive. According to the methods used was a case study, and how to approach is qualitative and quantitative. The research unit was the prosecutor of the State of Rio Grande do Norte, by two guys who represent all of the participants in the project management office of the institution. These subjects were chosen because they act with the office since the foundation of the same, having the knowledge necessary to deepen the research required, and experience with projects and work experience in the area. Data were collected through an adaptation of the evaluation form for the amplitude corporate developed and presented to the scientific environment for Pinto, Cota and Levin (2010). The results revealed that the level of maturity in the current strategic approach is 77%, and 97% desired; tactical approach in current is 66% and 97% desired, and the current operational approach is 78%, and 100% desired. He pointed out that several factors influence the level of maturity of the project management office of the Public Prosecutor and the recurrent related to information technology, regarding the storage and sharing of information. Concluded that the level of maturity of the project management office of the Public Ministry of the State of Rio Grande do Norte is advanced
Resumo:
The research aimed to evaluate the level of maturity of the project management office of the Public Ministry of the State of Rio Grande do Norte, on the model PMO Maturity Cube. It was based on a theoretical framework that includes project management, project management office and maturity of the project management office. The research was classified as to the purpose as exploratory and descriptive. According to the methods used was a case study, and how to approach is qualitative and quantitative. The research unit was the prosecutor of the State of Rio Grande do Norte, by two guys who represent all of the participants in the project management office of the institution. These subjects were chosen because they act with the office since the foundation of the same, having the knowledge necessary to deepen the research required, and experience with projects and work experience in the area. Data were collected through an adaptation of the evaluation form for the amplitude corporate developed and presented to the scientific environment for Pinto, Cota and Levin (2010). The results revealed that the level of maturity in the current strategic approach is 77%, and 97% desired; tactical approach in current is 66% and 97% desired, and the current operational approach is 78%, and 100% desired. He pointed out that several factors influence the level of maturity of the project management office of the Public Prosecutor and the recurrent related to information technology, regarding the storage and sharing of information. Concluded that the level of maturity of the project management office of the Public Ministry of the State of Rio Grande do Norte is advanced
Resumo:
o objeto de estudo desta dissertação é a aplicação da base de conhecimento para o gerenciamento de projetos em uma organização de pequeno e médio porte inserida no setor metal-mecânico, em produção de bens de capital sob encomenda, com negócios centralizados nos segmentos de laticínios, de alimentos, de química e de petroquímica da grande Porto Alegre. As questões aplicadas no gerenciamento de projetos são (i) gerenciamento da integração, (ii) do escopo, (iii) do tempo, (iv) do custo e (v) da qualidade. O estudo foi motivado a partir dos resultados de alguns projetos encerrados pela empresa. Neles, se identificou que o escopo, o custo, o prazo de entrega e a qualidade foram as questões de maiores perdas, comparadas ao desempenho dos indicadores reportados na literatura. Assim, identificou-se a existência de um gap de melhoria em gerenciamento de projetos em produtos sob encomenda. Não havia procedimentos documentados, fluxos de processos padronizados e indicadores de desempenho estabelecidos. A partir de conceitos teóricos da revisão bibliográfica,tendo como base o ProjectManagementBody of Knowledge (PMBOK-Corpo de Conhecimento do Gerenciamento de Projetos), foram aplicadas melhorias no processo de gerenciamento de projetos da empresa analisada.