997 resultados para KM practices


Relevância:

70.00% 70.00%

Publicador:

Resumo:

The acquisition and management of knowledge is the dominant source of organisational com-petitive advantage. As innovation processes in the management and procurement of construc-tion activities are becoming increasingly interactive, knowledge management (KM) has been widely recognised by construction organisations as an essential tool to be employed when dealing with growing complexity and cost of projects as well as increasing client demands. KM requires deliberate efforts by an organisation to maximise its performance through the acquisition, dissemination and leveraging of the organisation’s intellectual assets. The Hong Kong (HK) construction market has been described as one of the most open and globally competitive. This paper reports on KM practices within the HK construction industry, and through the analysis of a self-administered questionnaire survey, reveals managers’ opinions of the formal and informal KM practices that could be used to manage the flow of knowledge, and identifies the level of implementation within their organisations. The differences between managers’ perception and the actual state of implementation – as reported by the same man-agers – are statistically examined. The analysis leads to better understanding of how HK con-struction professionals currently manage organisational knowledge, and what areas for poten-tial improvement exist.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Purpose – Competitive advantage can be gained in several ways including gaining a knowledge advantage (K-Adv). This paper sets out to report on the first stage of broad study to assess the effectiveness of implementing an enterprise resource planning system (ERP) from a knowledge management (KM) perspective.

Design/methodology/approach – The study used a survey of a small but representative group to gain feedback in their experience of using the ERP system. Results are evaluated using a KM framework, the knowledge advantage (K-Adv) capability maturity model (CMM) tool that was initially developed for use by construction organisations to assess the impact of leadership and its supporting ICT infrastructure on the ability of people (by effectively creating, sharing, disseminating and using knowledge) operating in a highly dynamic business environment.

Findings – The K-Adv framework analysis for the study indicates that the ERP system was seen as a useful tool for cost management and that its deployment effectiveness is mainly dependent on human-to-human knowledge transfer about how to make the ERP system work. Also, how leaders in organisations facilitate and support people is a critical enabler of the ERP system deployment. The K-Adv CMM tool was useful in making sense of the degree of organisational maturity from a KM perspective.

Practical implications – The findings first highlight the usefulness of focusing on people-support in using the ERP adoption in this organisation's context and, second, they illustrate how a CMM tool like the K-Adv can be used to evaluate KM practices.

Originality/value – The likely effectiveness of use of an ERP is well-known. However, the originality of the paper is twofold. First, it explains effective ERP application drivers and inhibitors from a KM perspective. Second, it tests and adapts a tool that helps evaluate KM effectiveness and assists better understanding of how these practices are enacted from a cost management business unit perspective.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Both Knowledge Management (KM) and Project Management (PM) are known as crucial factors to develop competitive advantage(CA). PM Office (PMO) is recognized as a strong solution to institutionalize PM practices in organization. However, according to the literature there is a significant gap in addressing KM practices in the PMO. In other words, existing PMO maturity models has not been addressed from KM perceptive. This paper discusses undertaken investigations of both KM and PM as an initial part of PhD research on the role of knowledge in PMO

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Better management of knowledge assets has the potential to improve business processes and increase productivity. This fact has led to considerable interest in recent years in the knowledge management (KM) phenomenon, and in the main dimensions that can impact on its application in construction. However, a lack of a systematic way of assessing KM initia-tives’ contribution towards achieving organisational business objectives is evident. This paper describes the first stage of a research project intended to develop, and empirically test, a KM input-process-output framework comprising unique and well-defined theoretical constructs representing the KM process and its internal and external determinants in the context of con-struction. The paper presents the underlying principles used in operationally defining each construct through the use of extant KM literature. The KM process itself is explicitly mod-elled via a number of clearly articulated phases that ultimately lead to knowledge utilisation and capitalisation, which in turn adds value or otherwise to meeting defined business objec-tives. The main objective of the model is to reduce the impact of subjectivity in assessing the contribution made by KM practices and initiatives toward achieving performance improvements.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Knowledge management (KM) continues to receive mounting interest within the construction industry due to its potential to offer solutions for organisations seeking competitive advantage. This paper presents a KM input-process-output conceptual model comprising unique and well-defined theoretical constructs representing KM practices and their internal and external determinants in the context of construction. The paper also presents the underlying principles used in operationally defining each construct using extant KM literature, and offers a number of testable hypotheses that capture the inter-relationships between the identified constructs.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Knowledge is a commodity. It is a by-product of learning that involves the creation, sharing, processing and possible use of information in the mind of an individual. Knowledge management (KM) is, therefore, concerned with the effective implementation of such activities within the organisation. It is simply the process of leveraging organisational knowledge to deliver a long-term competitive advantage. This paper presents the results of an empirical research investigation into the interaction between different KM activities within the context of construction contracting organisations. The different KM activities include: responsiveness to the knowledge of business environment, knowledge acquisition, knowledge dissemination, and knowledge application. A questionnaire survey was administered to investigate the opinions of construction professionals regarding the intensity of activities currently implemented by their organisations to facilitate knowledge capturing, sharing and application. A total of 149 responses were then used to statistically examine the inter-relationships between the different KM activities as practised by contracting organisations in Hong Kong. The paper presents and discusses the survey findings and proposes recommendations for improving the effectiveness of current KM practices.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Management of project knowledge is a critical factor for project success. Project Management Office (PMO) is a unit within organisations to centrally facilitate, manage and control organisational project for improving the rate of project success. Due to increasing interest of developing PMO, the Project Management Maturity Model (PMMM) has been proposed to develop PMOs gradually. The PMMM contributes to evolvement of PMO from immature to mature level through addressing appropriate PM practices. Despite the importance of project knowledge, it has not been extensively investigated in project environments. In addition, the existing PMMMs not only do not address management of project knowledge, but also they recommend little criteria to assess the maturity of PMO from KM point of view. The absence of KM discussion in current PMMMs was defined as the subject of a research project in order for addressing KM practices at various maturity levels of PMO. In order to address the mentioned gap, a framework has been developed based on the current discussions of both PM and KM. The proposed framework comprises three premises: KM processes and practices, PMMM, and KM Maturity Model (KMMM). The incorporation of KMMM practices at various maturity levels of PMO is one of the significance of this framework. It proposes numbers of KM strategies, processes, and practices to address project knowledge management at various levels PMO. This framework shall be useful guidance for developing PMOs from KM perspective. In other words, it contributes to management of project knowledge, as a key for project success. The proposed framework follows the process-based approach and it could be employed alongside the current PMMMs for PMO development. This paper presents the developed framework, theoretical background, premises, proposed KM practices, and processes to be employed in Project-based Organisations and PMOs. This framework has been examined at numbers of case studies with different maturity levels. The case studies outcomes, which will be subjects for future papers, have not shown any significant contradiction yet, however, more investigations are being conducted to validate the proposed framework.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Knowledge Management (KM) is vital factor to successfully undertake projects. The temporary nature of projects necessitates employing useful KM practices to reduce any issues such as knowledge leakiness and rework. The Project Management Office (PMO) is a unit within organisations to facilitate and oversee organisational projects. Project Management Maturity Models (PMMM) show the development of PMOs from immature to mature levels. The existing PMMMs have focused on discussing Project Management (PM) practices, however, the management of project knowledge is yet to be addressed, at various levels of maturity. A research project was undertaken to investigate the mentioned gap for addressing KM practices at the existing PMMMs. Due to the exploratory and inductive nature of this research, qualitative methods using case studies were chosen as the research methodology to investigate the problem in the real world. In total, three cases selected from different industries: research; mining and government organisations, to provide broad categories for research and research questions were examined using the developed framework. This paper presents the findings from the investigation of the research organisation with the lowest level of maturity. From KM process point of view, knowledge creation and capturing are the most important processes, while knowledge transferring and reusing received less attention. In addition, it was revealed that provision of “knowledge about client” and “project management knowledge” are the most important types of knowledge that are required at this level of maturity. The results also revealed that PMOs with higher maturity level have better knowledge management, however, some improvement is needed. In addition, the importance of KM processes varies at different levels of maturity. In conclusion, the outcomes of this paper could provide powerful guidance to PMOs at lowest level of maturity from KM point of view.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The purpose of this paper is to review existing knowledge management (KM) practices within the field of asset management, identify gaps, and propose a new approach to managing knowledge for asset management. Existing approaches to KM in the field of asset management are incomplete with the focus primarily on the application of data and information systems, for example the use of an asset register. It is contended these approaches provide access to explicit knowledge and overlook the importance of tacit knowledge acquisition, sharing and application. In doing so, current KM approaches within asset management tend to neglect the significance of relational factors; whereas studies in the knowledge management field have showed that relational modes such as social capital is imperative for ef-fective KM outcomes. In this paper, we argue that incorporating a relational ap-proach to KM is more likely to contribute to the exchange of ideas and the devel-opment of creative responses necessary to improve decision-making in asset management. This conceptual paper uses extant literature to explain knowledge management antecedents and explore its outcomes in the context of asset man-agement. KM is a component in the new Integrated Strategic Asset Management (ISAM) framework developed in conjunction with asset management industry as-sociations (AAMCoG, 2012) that improves asset management performance. In this paper we use Nahapiet and Ghoshal’s (1998) model to explain antecedents of relational approach to knowledge management. Further, we develop an argument that relational knowledge management is likely to contribute to the improvement of the ISAM framework components, such as Organisational Strategic Manage-ment, Service Planning and Delivery. The main contribution of the paper is a novel and robust approach to managing knowledge that leads to the improvement of asset management outcomes.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Knowledge Management (KM) is vital factor to successfully undertake projects. The temporary nature of projects necessitates employing useful KM practices for tackling issues such as knowledge leakiness and rework. The Project Management Office (PMO) is a unit within organizations to facilitate and oversee organizational projects. Project Management Maturity Models (PMMM) shows the development of PMOs from immature to mature levels. The existing PMMMs have focused on discussing Project Management (PM) practices, however, the management of project knowledge is yet to be addressed, at various levels of maturity. This research project was undertaken to investigate the mentioned gap for addressing KM practices at the existing PMMMs. Due to the exploratory and inductive nature of this research, qualitative methods were chosen as the research methodology. In total, three cases selected from different industries: research; mining and government organizations, to provide broad categories for research and research questions were examined using the developed framework. This paper presents the partial findings of undertaken investigation of the research organisation with the lowest level of maturity. The result shows that knowledge creation and capturing are the most important processes, while knowledge transferring and reusing are not as important as the other two processes. In addition, it was revealed that provision of “knowledge about client” and “project management knowledge” are the most important types of knowledge that are required at this level of maturity. In conclusion, the outcomes of this paper shall provide powerful guidance to PMOs at lowest level of maturity from KM point of view.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Gerir o conhecimento representa uma nova responsabilidade da administração pública para que ela possa aumentar a efetividade dos serviços prestados e melhorar a sociedade a qual serve, na medida em que auxilia as organizações a enfrentar novos desafios, implantar práticas inovadoras de gestão e melhorar a qualidade dos processos, produtos e serviços públicos. Considerando que o processo de gestão do conhecimento compreende cinco etapas representadas por identificar, criar, armazenar, compartilhar e utilizar o conhecimento organizacional, o mapeamento inicial das práticas de GC já existentes na criminalística federal reveste-se de fundamental importância. Como se referem a práticas relativamente novas no contexto das organizações – notadamente nas públicas – diversos métodos de avaliação de implementação de práticas de GC foram identificados. Nesse contexto, uma vez que a perícia criminal federal apresenta-se como uma organização que pretende implementar práticas relacionadas à GC, não havendo, porém, até o momento, qualquer iniciativa institucionalizada nesse sentido, a escolha da metodologia recaiu sobre o modelo proposto pelo IPEA. Quanto à pesquisa, tendo em mente o problema e os objetivos propostos, optou-se por uma investigação descritiva, explicativa e aplicada, onde se buscou construir um amplo referencial teórico com descrição detalhada dos aspectos abordados no decorrer do estudo. Os trabalhos envolveram, ainda, pesquisa de campo, bibliográfica e estudo de caso. Os resultados permitiram concluir que a criminalística federal encontra-se em fase de iniciação em gestão do conhecimento, situação em que começa a reconhecer a importância e a necessidade de gerenciar o conhecimento originado no contexto de suas atividades e que está inserido na organização por meio de seus integrantes. Verificou-se, ainda, no decorrer da pesquisa, ações pontuais dispersas na perícia criminal federal voltadas à sistematizar as informações e conhecimentos insertos na instituição.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Public road authorities have a key responsibility in driving initiatives for reducing greenhouse gas (GHG) emissions in the road construction project lifecycle. A coherent and efficient chain of procurement processes and methods is needed to convert green policies into tangible actions that capture the potential for GHG reduction. Yet, many infrastructure clients lack developed methodologies regarding green procurement practices. Designing more efficient solutions for green procurement requires an evaluation of the current initiatives and stages of development. A mapping of the current GHG reduction initiatives in Australian public road procurement is presented in this paper. The study includes the five largest Australian state road authorities, which cover 94% of the total 817,089 km of Australian main roads (not local) and account for 96% of the total A$13 billion annual major road construction and maintenance expenditure. The state road authorities’ green procurement processes and tools are evaluated based on interviews and a review of documents. Altogether 12 people, comprising 1-3 people of each organisation, participated in the interviews and provided documents. An evaluation matrix was developed for mapping the findings across the lifecycle of road construction project delivery. The results show how Australian state road authorities drive decisions with an impact on GHG emissions on the strategic planning phase, project development phase, and project implementation phase. The road authorities demonstrate varying levels of advancement in their green procurement methodologies. Six major gaps in the current green procurement processes are identified and, respectively, six recommendations for future research and development are suggested. The greatest gaps remain in the project development phase, which has a critical role in fixing the project (GHG reduction) goals, identifying risks and opportunities, and selecting the contractor to deliver the project. Specifically, the role of mass-haul optimisation as a part of GHG minimisation was reviewed, and mass-haul management was found to be an underutilised element with GHG reduction potential.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents an overview of the seismic microzonation and the grade/level based study along with methods used for estimating hazard. The principles of seismic microzonation along with some current practices are discussed. Summary of seismic microzonation experiments carried out in India is presented. A detailed work of seismic microzonation of Bangalore has been presented as a case study. In this case study, a seismotectonic map for microzonation area has been developed covering 350 km radius around Bangalore, India using seismicity and seismotectonic parameters of the region. For seismic microzonation Bangalore Mahanagar Palike (BMP) area of 220 km2 has been selected as the study area. Seismic hazard analysis has been carried out using deterministic as well as probabilistic approaches. Synthetic ground motion at 653 locations, recurrence relation and peak ground acceleration maps at rock level have been generated. A detailed site characterization has been carried out using borehole with standard penetration test (SPT) ―N‖ values and geophysical data. The base map and 3-dimensional sub surface borehole model has been generated for study area using geographical information system (GIS). Multichannel analysis of surface wave (MASW)method has been used to generate one-dimensional shear wave velocity profile at 58 locations and two- dimensional profile at 20 locations. These shear wave velocities are used to estimate equivalent shear wave velocity in the study area at every 5m intervals up to a depth of 30m. Because of wider variation in the rock depth, equivalent shear for the soil overburden thickness alone has been estimated and mapped using ArcGIS 9.2. Based on equivalent shear wave velocity of soil overburden thickness, the study area is classified as ―site class D‖. Site response study has been carried out using geotechnical properties and synthetic ground motions with program SHAKE2000.The soil in the study area is classified as soil with moderate amplification potential. Site response results obtained using standard penetration test (SPT) ―N‖ values and shear wave velocity are compared, it is found that the results based on shear wave velocity is lower than the results based on SPT ―N‖ values. Further, predominant frequency of soil column has been estimated based on ambient noise survey measurements using instruments of L4-3D short period sensors equipped with Reftek 24 bit digital acquisition systems. Predominant frequency obtained from site response study is compared with ambient noise survey. In general, predominant frequencies in the study area vary from 3Hz to 12Hz. Due to flat terrain in the study area, the induced effect of land slide possibility is considered to be remote. However, induced effect of liquefaction hazard has been estimated and mapped. Finally, by integrating the above hazard parameters two hazard index maps have been developed using Analytic Hierarchy Process (AHP) on GIS platform. One map is based on deterministic hazard analysis and other map is based on probabilistic hazard analysis. Finally, a general guideline is proposed by bringing out the advantages and disadvantages of different approaches.