981 resultados para High Ore Mine
Resumo:
The potential for health risks to humans exposed to the asbestos minerals continues to be a public health concern. Although the production and use of the commercial amphibole asbestos minerals—grunerite (amosite) and riebeckite (crocidolite)—have been almost completely eliminated from world commerce, special opportunities for potentially significant exposures remain. Commercially viable deposits of grunerite asbestos are very rare, but it can occur as a gangue mineral in a limited part of a mine otherwise thought asbestos-free. This report describes such a situation, in which a very localized seam of grunerite asbestos was identified in an iron ore mine. The geological occurrence of the seam in the ore body is described, as well as the mineralogical character of the grunerite asbestos. The most relevant epidemiological studies of workers exposed to grunerite asbestos are used to gauge the hazards associated with the inhalation of this fibrous mineral. Both analytical transmission electron microscopy and phase-contrast optical microscopy were used to quantify the fibers present in the air during mining in the area with outcroppings of grunerite asbestos. Analytical transmission electron microscopy and continuous-scan x-ray diffraction were used to determine the type of asbestos fiber present. Knowing the level of the miner’s exposures, we carried out a risk assessment by using a model developed for the Environmental Protection Agency.
Resumo:
Includes bibliographical references.
Resumo:
In this issue...Geology, Mineral Club, Homecoming Queen, Pipestone Pass, Parachute club, Tech Band, High Ore Mine, Cheerleaders, Nitrogen Generator
Resumo:
In this paper, a generic and flexible optimisation methodology is developed to represent, model, solve and analyse the iron ore supply chain system by integrating of iron ore shipment, stockpiles and railing within a whole system. As a result, an integrated train-stockpile-ship timetable is created and optimised for improving efficiency of overall supply chain system. The proposed methodology provides better decision making on how to significantly improve rolling stock utilisation with the best cost-effectiveness ratio. Based on extensive computational experiments and analysis, insightful and quantitative advices are suggested for iron ore mine industry practitioners. The proposed methodology contributes to the sustainability of the environment by reducing pollution due to better utilisation of transportation resources and fuel.
Resumo:
This paper proposes a new multi-resource multi-stage scheduling problem for optimising the open-pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is analysed based on the real-life data from an Australian iron ore mine site. The objective of the model is to maximise the throughput and minimise the total idle times of equipment at each stage. The following comprehensive mining attributes and constraints have been considered: types of equipment; operating capacities of equipment; ready times of equipment; speeds of equipment; block-sequence-dependent movement times of equipment; equipment-assignment-dependent operation times of blocks; distances between each pair of blocks; due windows of blocks; material properties of blocks; swell factors of blocks; and slope requirements of blocks. It is formulated by mixed integer programming and solved by ILOG-CPLEX optimiser. The proposed model is validated with extensive computational experiments to improve mine production efficiency at the operational level. The model also provides an intelligent decision support tool to account for the availability and usage of equipment units for drilling, blasting and excavating stages.
Resumo:
This paper proposes a new multi-resource multi-stage mine production timetabling problem for optimising the open-pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is analysed based on the real-life data from an Australian iron ore mine site. The objective of the model is to maximise the throughput and minimise the total idle times of equipment at each stage. The following comprehensive mining attributes and constraints are considered: types of equipment; operating capacities of equipment; ready times of equipment; speeds of equipment; block-sequence-dependent movement times; equipment-assignment-dependent operational times; etc. The model also provides the availability and usage of equipment units at multiple operational stages such as drilling, blasting and excavating stages. The problem is formulated by mixed integer programming and solved by ILOG-CPLEX optimiser. The proposed model is validated with extensive computational experiments to improve mine production efficiency at the operational level.
Resumo:
分析了潘洛铁矿露天矿滑坡灾害发生发展的特征,得出该滑坡是一个动态的、多层次的复合型滑坡;找出了影响该边坡稳定的主要因素是大气降雨和采矿切割坡脚;根据这些影响因素和滑坡发展变化规律,提出了科学合理的滑坡治理方案,即动态的综合治理方案.经现场实施后,通过滑坡监测数据表明,该滑坡得到了彻底根治.
Resumo:
Environmental samples were collected at three surface water sites between 5/21/2011 and 11/21/2014 along the Upper Boulder River near Boulder Montana. The sites were located at Bernice (within the mountain block), near the High Ore drainage (near the mountain block/basin transition), and at the USGS Gauging Station near Boulder, Montana (within the basin). The parameters measured in the field were SC, temperature, and alkalinity with occasional pH measurements. We collected samples for anions, cations, and stable isotopes in the catchment. We identified endmembers by sampling snow and groundwater and determined from available data an approximate endmember for rain, snow, and groundwater. We used temporal and spatial variations of water chemistry and isotopes to generate an endmember mixing model. Groundwater was found to always be an important contributor to river flow and could increase by nearly an order of magnitude during large snowmelt events. This resulted in groundwater comprising ~20% of total river flow during snowmelt at all sites. At peak snowmelt we observed that near surface water contributions to the river were from a mixture of rain and snow. Soil water, though not sampled, was hypothesized to be an important part of the hydrologic story. If so, the endmember contributions determined in this study may be different. Groundwater may have the highest variation depending on water chemistry of shallow soil water.
Resumo:
Several major iron deposits occur in the Quadrilatero Ferrifero (QF), southeastern region of Brazil, where metamorphosed and heterogeneously deformed banded iron formation (BIF) of the Caue Formation, regionally called itabirite, was transformed into high- (Fe >64%) and lowgrade (30%
Resumo:
Calculated phase relations in the system MnOSi02-C02-02 were used to propose a thermodynamic explanation for the thermal metamorphism of rhodochrosite beds lying between chert strata. The metamorphic MnOS i 0 2 minerals are arranged in order quartz(chert), rhodonite. tephroite and manganosite-hausmannite-pyrochroite rhodonite across the ore bed. The calculation covered temperatures up to 1000 K and pressures up to 5 kb. The zoning was interpreted as the result of a continuous rise in metamorphic temperature. The equilibrium partner of rhodochrosite changed from rhodonite through manganosite. Across the ore bed there are gradients in the chemical potential of MnO and SiO2 but fugacities of volatlle components such as C02. 02 and H20 were probably uniform at any given time and location during formation of the zones. Assuming that the total pressure and the fugacity of C02 were at 1.4 kb and 1.0 1 b. respectively. rhodonite. tephroite and manganosite would have formed at 472. 478 and 629 K.
Resumo:
A former silver mine in Tynagh, Co. Galway, Ireland is one of the most contaminated mine sites in Europe with maximum concentrations of Zn, As, Pb, Mn, Ni, Cu, and Cd far exceeding guideline values for water and sediment. The aims of this research were to 1) further assess the contamination, particularly metals, in surface water and sediment around the site, and 2) determine if the contamination has increased 10 years after the Environmental Protection Agency Ireland (EPAI) identified off-site contamination. Site pH is alkaline to neutral because CaCO3-rich sediment and rock material buffer the exposed acid generating sulphide-rich ore. When this study was compared to the previous EPAI study conducted 10 years earlier, it appeared that further weathering of exposed surface sediment had increased concentrations of As and other potentially toxic elements. Water samples from the tailings ponds and adjacent Barnacullia Stream had concentrations of Al, Cd, Mn, Zn and Pb above guideline values. Lead and Zn concentrations from the tailings pond sediment were 16 and 5 times higher, respectively, than concentrations reported 10 years earlier. Pb and Zn levels in most sediment samples exceeded the Expert Group (EGS) guidelines of 1000 and 5000 mg/kg, respectively. Arsenic concentrations were as high as 6238 mg/kg in the tailings ponds sediment, which is 62 and 862 times greater than the EGS and Canadian Soil Quality Guidelines (CSQG), respectively. Cadmium, Cu, Fe, Mn, Pb and Zn concentrations in water and sediment were above guideline values downstream of the site. Additionally, Fe, Mn and organic matter (OM) were strongly correlated and correlated to Zn, Pb, As, Cd, Cu and Ni in stream sediment. Therefore, the nearby Barnacullia Stream is also a significant pathway for contaminant transport to downstream areas. Further rehabilitation of the site may decrease the contamination around the area.
Resumo:
This paper presents the classification of 110 copper ore samples from Sossego Mine, based on X-ray diffraction and cluster analysis. The comparison based on the position and the intensity of the diffracted peaks allowed the distinction of seven ore types, whose differences refer to the proportion of major minerals: quartz, feldspar, actinolite, iron oxides, mica and chlorite. There was a strong correlation between the grouping and the location of the samples in Sequeirinho and Sossego orebodies. This relationship is due to different types and intensities of hydrothermal alteration prevailing in each body, which reflect the mineralogical composition and thus the X-ray diffractograms of samples.
Resumo:
The Butte-Highland mine is situated at the head of Basin Creek, in the Highland mining district, Silver Bow County, about 14 miles south of Butte. The tunnel portal and present surface plant are at an elevation of about 7350 feet above sea level, facing westward across the head of Basin Creek valley. The "ghost" mining town of Highland lies a mile to the east, near the forks of Fish Creek. Access to the mine is obtained at present from Beaudine's siding, 12 miles west. The property may also be reached, with difficulty, over poor roads from Limekiln hill, or from Moose Creek.
Resumo:
The Golden Messenger Mine which is approximately twenty-three miles northeast of Helena, Montana, near York, on Trout Creek, has long presented several problems of both theoretical and practical interest.