872 resultados para Critical Path Method (CPM)
Resumo:
Purpose Traditional construction planning relies upon the critical path method (CPM) and bar charts. Both of these methods suffer from visualization and timing issues that could be addressed by 4D technology specifically geared to meet the needs of the construction industry. This paper proposed a new construction planning approach based on simulation by using a game engine. Design/methodology/approach A 4D automatic simulation tool was developed and a case study was carried out. The proposed tool was used to simulate and optimize the plans for the installation of a temporary platform for piling in a civil construction project in Hong Kong. The tool simulated the result of the construction process with three variables: 1) equipment, 2) site layout and 3) schedule. Through this, the construction team was able to repeatedly simulate a range of options. Findings The results indicate that the proposed approach can provide a user-friendly 4D simulation platform for the construction industry. The simulation can also identify the solution being sought by the construction team. The paper also identifies directions for further development of the 4D technology as an aid in construction planning and decision-making. Research limitations/implications The tests on the tool are limited to a single case study and further research is needed to test the use of game engines for construction planning in different construction projects to verify its effectiveness. Future research could also explore the use of alternative game engines and compare their performance and results. Originality/value The authors proposed the use of game engine to simulate the construction process based on resources, working space and construction schedule. The developed tool can be used by end-users without simulation experience.
Resumo:
A pert-type system, a combination of the program evaluation and review technique (PERT) and the critical path method (CPM), might be used by the hospitality industry to improve planning and control of complex functions. The author discusses this management science technique and how it can assist.
Resumo:
为了克服传统装配线的不足,在基于功能对象的产品族建模基础上,提出了主干线和装配模块相结合的可重构装配系统开放式组织结构。这种分形相似的组织结构具有能力柔性、鲁棒性、功能扩展能力等特点,并能通过模块的局部调整快速响应市场的需求。利用网络法,针对鲁棒性和增容性问题,提出了相应的重构优化算法。
Resumo:
The BaMoO4 nanopowders were prepared by the Complex Polymerization Method (CPM). The structure properties of the BaMoO4 powders were characterized by FTIR transmittance spectra, X-ray diffraction (XRD), Raman spectra, photoluminescence spectra (PL) and high-resolution scanning electron microscopy (HR-SEM). The XRD, FTIR and Raman data showed that BaMoO4 at 300 degrees C was disordered. At 400 degrees C and higher temperature, BaMoO4 crystalline scheelite-type phases could be identified, without the presence of additional phases, according to the XRD, FTIR and Raman data. The calculated average crystallite sizes, calculated by XRD, around 40 nm, showed the tendency to increase with the temperature. The crystallite sizes, obtained by HR-SEM, were around of 40-50 nm. The sample that presented the highest intensity of the red emission band was the one heat treated at 400 degrees C for 2 h, and the sample that displayed the 'highest intensity of the green emission band was the one heat treated at 700 degrees C for 2 h. The CPM was shown to be a low cost route for the production of BaMoO4 nanopowders, with the advantages of lower temperature, smaller time and reduced cost. The optical properties observed for BaMoO4 nanopowders suggested that this material is a highly promising candidate for photoluminescent applications. (C) 2005 Elsevier B.V. All rights reserved.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Includes index.
Resumo:
Includes index.
Resumo:
This paper presents a Dubins model based strategy to determine the optimal path of a Miniature Air Vehicle (MAV), constrained by a bounded turning rate, that would enable it to fly along a given straight line, starting from an arbitrary initial position and orientation. The method is then extended to meet the same objective in the presence of wind which has a magnitude comparable to the speed of the MAV. We use a modification of the Dubins' path method to obtain the complete optimal solution to this problem in all its generality.
Resumo:
Systems design involves the determination of interdependent variables. Thus the precedence ordering for the tasks of determining these variables involves circuits. Circuits require planning decisions abut how to iterate and where to use estimates. Conventional planning techniques, such as critical path, do not deal with these problems. Techniques are shown in this paper which acknowledge these circuits in the design of systems. These techniques can be used to develop an effective engineering plan, showing where estimates are to be used, how design iterations and reviews are handled, and how information flows during the design work.
Resumo:
Due to the ongoing trend towards increased product variety, fast-moving consumer goods such as food and beverages, pharmaceuticals, and chemicals are typically manufactured through so-called make-and-pack processes. These processes consist of a make stage, a pack stage, and intermediate storage facilities that decouple these two stages. In operations scheduling, complex technological constraints must be considered, e.g., non-identical parallel processing units, sequence-dependent changeovers, batch splitting, no-wait restrictions, material transfer times, minimum storage times, and finite storage capacity. The short-term scheduling problem is to compute a production schedule such that a given demand for products is fulfilled, all technological constraints are met, and the production makespan is minimised. A production schedule typically comprises 500–1500 operations. Due to the problem size and complexity of the technological constraints, the performance of known mixed-integer linear programming (MILP) formulations and heuristic approaches is often insufficient. We present a hybrid method consisting of three phases. First, the set of operations is divided into several subsets. Second, these subsets are iteratively scheduled using a generic and flexible MILP formulation. Third, a novel critical path-based improvement procedure is applied to the resulting schedule. We develop several strategies for the integration of the MILP model into this heuristic framework. Using these strategies, high-quality feasible solutions to large-scale instances can be obtained within reasonable CPU times using standard optimisation software. We have applied the proposed hybrid method to a set of industrial problem instances and found that the method outperforms state-of-the-art methods.
Resumo:
Engineering changes (ECs) are essential in complex product development, and their management is a crucial discipline for engineering industries. Numerous methods have been developed to support EC management (ECM), of which the change prediction method (CPM) is one of the most established. This article contributes a requirements-based benchmarking approach to assess and improve existing methods. The CPM is selected to be improved. First, based on a comprehensive literature survey and insights from industrial case studies, a set of 25 requirements for change management methods are developed. Second, these requirements are used as benchmarking criteria to assess the CPM in comparison to seven other promising methods. Third, the best-in-class solutions for each requirement are investigated to draw improvement suggestions for the CPM. Finally, an enhanced ECM method which implements these improvements is presented. © 2013 © 2013 The Author(s). Published by Taylor & Francis.
Resumo:
In 1990, Juan Antonio Ramírez made known his iconological paranoiac method to the academic world. It is a system devised to study Dalí´s work, born of happy matrimony between the catalonian artist´s critical paranoiac method and the first iconographic school of Warburg and Panofsky. What, at first sight, seemed to be an extravagant methodology with little academic credibility, turned out to be, by going forward in time, an effective research method when analyzing Dali´s initial works. It is no wonder that, at the beginning of XXI century, this hybridization between Dalí´s and Panofsky’s methods, were regarded as a strange and nonsensical idea. Nevertheless, twenty years after, blatant examples have been noted, which endorse the advantages of this new system for “iconographic” study. As usual, this new contribution by Juan Antonio Ramirez to art history methodology is called upon to have a successful future survival, in forthcoming generations. This article, attempts to analyze this method, inquiring into the validity, effectiveness and practical utility.