A hybrid method for large-scale short-term scheduling of make-and-pack production processes
| Data(s) |
16/07/2014
|
|---|---|
| Resumo |
Due to the ongoing trend towards increased product variety, fast-moving consumer goods such as food and beverages, pharmaceuticals, and chemicals are typically manufactured through so-called make-and-pack processes. These processes consist of a make stage, a pack stage, and intermediate storage facilities that decouple these two stages. In operations scheduling, complex technological constraints must be considered, e.g., non-identical parallel processing units, sequence-dependent changeovers, batch splitting, no-wait restrictions, material transfer times, minimum storage times, and finite storage capacity. The short-term scheduling problem is to compute a production schedule such that a given demand for products is fulfilled, all technological constraints are met, and the production makespan is minimised. A production schedule typically comprises 500–1500 operations. Due to the problem size and complexity of the technological constraints, the performance of known mixed-integer linear programming (MILP) formulations and heuristic approaches is often insufficient. We present a hybrid method consisting of three phases. First, the set of operations is divided into several subsets. Second, these subsets are iteratively scheduled using a generic and flexible MILP formulation. Third, a novel critical path-based improvement procedure is applied to the resulting schedule. We develop several strategies for the integration of the MILP model into this heuristic framework. Using these strategies, high-quality feasible solutions to large-scale instances can be obtained within reasonable CPU times using standard optimisation software. We have applied the proposed hybrid method to a set of industrial problem instances and found that the method outperforms state-of-the-art methods. |
| Formato |
application/pdf |
| Identificador |
http://boris.unibe.ch/53020/1/BauTra14.pdf Baumann, Philipp; Trautmann, Norbert (2014). A hybrid method for large-scale short-term scheduling of make-and-pack production processes. European journal of operational research, 236(2), pp. 718-735. Elsevier 10.1016/j.ejor.2013.12.040 <http://dx.doi.org/10.1016/j.ejor.2013.12.040> doi:10.7892/boris.53020 info:doi:10.1016/j.ejor.2013.12.040 urn:issn:0377-2217 |
| Idioma(s) |
eng |
| Publicador |
Elsevier |
| Relação |
http://boris.unibe.ch/53020/ |
| Direitos |
info:eu-repo/semantics/openAccess |
| Fonte |
Baumann, Philipp; Trautmann, Norbert (2014). A hybrid method for large-scale short-term scheduling of make-and-pack production processes. European journal of operational research, 236(2), pp. 718-735. Elsevier 10.1016/j.ejor.2013.12.040 <http://dx.doi.org/10.1016/j.ejor.2013.12.040> |
| Palavras-Chave | #650 Management & public relations |
| Tipo |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion PeerReviewed |