992 resultados para Chile Project


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Safety Effectiveness Indicators (SEI) Project has used extensive research to determine what safety effectiveness measures can be developed by industry, for industry use to improve its safety performance. These indicators can measure how effectively the 13 safety management tasks1 (SMTs) selected for this workbook are undertaken. Currently, positive performance indicators (PPIs) are only able to measure the number of activities undertaken. They do not provide information on whether each activity is being undertaken effectively, and therefore do not provide data which can be used by industry to target areas of focus and improvement. The initial workbook contained six SMTs, and was piloted on various construction sites during August 2008. The workbook was refined through feedback from the pilot, and 13 SMTs were used in a field trial during the months of October, November and December 2008. The project team also carried out 12 focus groups in Brisbane, Canberra, Sydney and Melbourne during April, May and June 2008, and developed an initial format of this workbook through these groups and team workshops. Simplification of the language was a recurring theme, and we have attempted to do this throughout the project. The challenge has been to ensure we keep the descriptions short, to the point and relevant to all companies, without making them too specific. The majority of the construction industry participants also requested an alteration to the scale used, so a ‘Yes’/‘No’/’Not applicable’ format is used in this workbook. This workbook, based on industry feedback, is for use on site by various construction companies and contains 13 SMTs. However, you are invited to personalise the SEI tools to better suit your individual company and workplaces.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Effective knowledge transfer can prevent the reinvention of systems and ideas as well as the repetition of errors. Doing so will save substantial time, as well as contribute to better performance of projects and project-based organisations (PBOs). Despite the importance of knowledge, PBOs face serious barriers to the effective transfer of knowledge, while their characteristics, such as unique and innovative approaches taken during every project, mean they have much to gain from knowledge transfer. As each new project starts, there is the strong potential to reinvent the process, rather than utilise learning from previous projects. In fact, rework is one of the primary factors contributing to construction industry's poor performance and productivity. Current literature has identified several barriers to knowledge transfer in organisational settings in general, and not specifically PBOs. However, PBOs significantly differ from other types of organisations. PBOs operate mainly on temporary projects, where time is a crucial factor and people are more mobile than in other organisational settings. The aim of this research is to identify the key barriers that prevent effective knowledge transfer for PBOs, exclusively. Interviews with project managers and senior managers of PBOs complement the analysis of the literature and provide professional expertise. This research is crucial to gaining a better understanding of obstacles that hinder knowledge transfer in projects. The main contribution of this research is exclusive for PBO, list of key barriers that organisation and project managers need to consider to ensure effective knowledge transfer and better project management.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The research on project learning has recognised the significance of knowledge transfer in project based organisations (PBOs). Effective knowledge transfer across projects avoids reinventions, enhances knowledge creation and saves lots of time that is crucial in project environment. In order to facilitate knowledge transfer, many PBOs have invested lots of financial and human resources to implement IT-based knowledge repository. However, some empirical studies found that employees would rather turn for knowledge to colleagues despite their ready access to IT-based knowledge repository. Therefore, it is apparent that social networks play a pivotal role in the knowledge transfer across projects. Some scholars attempt to explore the effect of network structure on knowledge transfer and performance, however, focused only on egocentric networks and the groups’ internal social networks. It has been found that the project’s external social network is also critical, in that the team members can not handle critical situations and accomplish the projects on time without the assistance and knowledge from external sources. To date, the influence of the structure of a project team’s internal and external social networks on project performance, and the interrelation between both networks are barely known. In order to obtain such knowledge, this paper explores the interrelation between the structure of a project team’s internal and external social networks, and their effect on the project team’s performance. Data is gathered through survey questionnaire distributed online to respondents. Collected data is analysed applying social network analysis (SNA) tools and SPSS. The theoretical contribution of this paper is the knowledge of the interrelation between the structure of a project team’s internal and external social networks and their influence on the project team’s performance. The practical contribution lies in the guideline to be proposed for constructing the structure of project team’s internal and external social networks.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Semester 1 2007, a Monitoring Student Engagement study, conducted as part of the Enhancing Transition at Queensland University of Technology (ET@QUT) Project and extending earlier work in the Project by Arora (2006), aimed at mapping the processes and resources used at that time to identify, monitor and manage students in their first year who were at risk of leaving QUT (Shaw, 2007). This identified a lack of documentation of the processes and resources used and revealed an ad-hoc rather than holistic and systematic approach to monitoring student engagement. One of Shaw’s recommendations was to: “To introduce a centralised case management approach to student engagement” (p. 14). That provided the genesis for the Student Success Project that is being reported on here. The aim of the Student Success Project is to trial, evaluate and ultimately establish holistic and systematic ways of helping students who appear to be at-risk of failing or withdrawing from a unit to persist and succeed. Students are profiled as being at-risk if they are absent from more than 2 tutorials in a row without contacting their tutor or if they fail to submit their first assignment. A Project Officer makes personal contact with these students to suggest ways they can get further assistance depending on their situation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document reports on the Innovations Working Group that met at the 10th International Conference “Models in Developing Mathematics Education” from the 11-17th September 2009 in Dresden, Saxony. It briefly describes the over arching and consistent themes that emerged from the numerous papers presented. The authors and titles of each of the papers presented will be listed in Table 2.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Exercise for Health program is a telephone-delivered exercise intervention for women with breast cancer (BC) living in regional Queensland. The effect of the program is being evaluated in the context of a randomised controlled trial. Consenting, newly diagnosed BC patients, treated in one of 8 regional Queensland hospitals, were randomly allocated to telephone-based exercise counselling (EC) or usual care (UC) at 6-weeks post-surgery. EC participants received an exercise workbook and 16 calls from an exercise physiologist over 8 months. Physical activity levels (PA) (Active Australia & CHAMPS), quality-of-life (FACTB+4), upper-body function (DASH) and fatigue (FACIT-Fatigue) were assessed at baseline (4-6 weeks post-surgery), 6- and 12-months post-surgery. Preliminary analyses of available 6-month data were conducted using t-tests and repeated measures ANCOVAs. Participating women (n=143; EC n=73, UC n=70) were aged 53±9 years and 30% met PA guidelines at baseline. Up to two thirds of the women received adjuvant therapy during the first 6 months following surgery. Greater improvements (mean change+SD) occurred for the EC vs UC group in weekly sessions of walking (1.83±4.3 vs -0.5±5.5, p=0.029) moderate-vigorous PA (5.0±6.5 vs -1.1±6.1, p=0.005) and strength training (1.9±2.9 vs -0.5±4.2 p<0.001), and in upper-body function, reflected by lower log-transformed disability scores (-0.34±0.44 vs -0.17±0.28, p=0.038). More EC than UC participants met PA guidelines at 6 months (46.3% vs 32.7%). Preliminary findings from this ongoing trial suggest that the telephone is a feasible and effective medium for delivering exercise counselling to newly diagnosed BC patients living in regional areas.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Campus Kindergarten is a community-based centre for early childhood education and care located on campus at the University of Queensland (UQ) in Brisbane, Australia. Being located within this diverse community has presented many opportunities for Campus Kindergarten. It is creating and embracing possibilities that has formed the basis for ongoing projects for children and teachers involving research and investigation. In 2002 Campus Kindergarten embarked on a collaborative project with the Art Museum bringing together these two departments within the university community.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is increasing agreement that understanding complexity is important for project management because of difficulties associated with decision-making and goal attainment which appear to stem from complexity. However the current operational definitions of complex projects, based upon size and budget, have been challenged and questions have been raised about how complexity can be measured in a robust manner that takes account of structural, dynamic and interaction elements. Thematic analysis of data from 25 in-depth interviews of project managers involved with complex projects, together with an exploration of the literature reveals a wide range of factors that may contribute to project complexity. We argue that these factors contributing to project complexity may define in terms of dimensions, or source characteristics, which are in turn subject to a range of severity factors. In addition to investigating definitions and models of complexity from the literature and in the field, this study also explores the problematic issues of ‘measuring’ or assessing complexity. A research agenda is proposed to further the investigation of phenomena reported in this initial study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Successful project delivery of construction projects depends on many factors. With regard to the construction of a facility, selecting a competent contractor for the job is paramount. As such, various approaches have been advanced to facilitate tender award decisions. Essentially, this type of decision involves the prediction of a bidderÕs performance based on information available at the tender stage. A neural network based prediction model was developed and presented in this paper. Project data for the study were obtained from the Hong Kong Housing Department. Information from the tender reports was used as input variables and performance records of the successful bidder during construction were used as output variables. It was found that the networks for the prediction of performance scores for Works gave the highest hit rate. In addition, the two most sensitive input variables toward such prediction are ‘‘Difference between Estimate’’ and ‘‘Difference between the next closest bid’’. Both input variables are price related, thus suggesting the importance of tender sufficiency for the assurance of quality production.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report is the primary output of Project 4: Copyright and Intellectual Property, the aim of which was to produce a report considering how greater access to and use of government information could be achieved within the scope of the current copyright law. In our submission for Project 4, we undertook to address: •the policy rationales underlying copyright and how they apply in the context of materials owned, held and used by government; • the recommendations of the Copyright Law Review Committee (CLRC) in its 2005 report on Crown copyright; • the legislative and regulatory barriers to information sharing in key domains, including where legal impediments such as copyright have been relied upon (whether rightly or wrongly) to justify a refusal to provide access to government data; • copyright licensing models appropriate to government materials and examples of licensing initiatives in Australia and other relevant jurisdictions; and • issues specific to the galleries, libraries, archives and museums (“GLAM”) sector, including management of copyright in legacy materials and “orphan” works. In addressing these areas, we analysed the submissions received in response to the Government 2.0 Taskforce Issues Paper, consulted with members of the Task Force as well as several key stakeholders and considered the comments posted on the Task Force’s blog. This Project Report sets out our findings on the above issues. It puts forward recommendations for consideration by the Government 2.0 Task Force on steps that can be taken to ensure that copyright and intellectual property promote access to and use of government information.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the past decade, scholars have proposed a range of terms to describe the relationship between practice and research in the creative arts, including increasingly nuanced definitions of practice-based research, practice-led research and practice-as-research. In this paper, I consider the efficacy of creative practice as method. I use the example of The Ex/Centric Fixations Project – a project in which I have embedded creative practice in a research project, rather than embedding research in a creative project. The Ex/Centric Fixations project investigates the way spectators interpret human experiences – especially human experiences of difference, marginalisation or discrimination – depicted onstage. In particular, it investigates the way postmodern performance writing strategies, and the presence of performing bodied to which the experience depicted can be attached, impacts on interpretations. It is part of a broader research project which examines the performativity of spectatorship, and intervenes in emergent debates about performance, ethics and spectatorship in the context of debate about whether live performance is a privileged site for the emergence of an ethical face-to-face encounter with the Other. Using the metaphor of the Mobius strip, I examines the way practice – as a method, rather than an output – has informed, influenced and problematised the broader research project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction projects can involve a diverse range of stakeholders and the success of the project depends very much on fulfilling their needs and expectations. It is important, therefore, to identify and recognize project stakeholders and develop a rigorous stakeholder management process. However, limited research has investigated the impact of stakeholders on construction projects in developing countries. A stakeholder impact analysis (SIA), based on an approach developed by Olander (2007), was adopted to investigate the stakeholders' impact on state-owned civil engineering projects in Vietnam. This involved the analysis of a questionnaire survey of 57 project managers to determine the relative importance of different stakeholders. The results show the client to have the highest level of impact on the projects, followed by project managers and the senior management of state-owned engineering firms. The SIA also provides suggestions to project managers in developing and evaluating the stakeholder management process.