999 resultados para Anthracite Coal Strike, Pa., 1902.


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Prior ultraviolet irradiation of coal results in catalysing the subsequent thermal decomposition and ignition of coal. Mechanically, it is shown that ultraviolet radiation brings about the catalysis by acting on the inorganic components of coal.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In open-cut strip mining, waste material is placed in-pit to minimise operational mine costs. Slope failures in these spoil piles pose a significant safety risk to personnel, along with a financial risk from loss of equipment and scheduling delays. It has been observed that most spoil pile failures occur when the pit has been previously filled with water and then subsequently dewatered. The failures are often initiated at the base of spoil piles where the material can undergo significant slaking (disintegration) over time due to overburden pressure and water saturation. It is important to understand how the mechanical properties of base spoil material are affected by slaking when designing safe spoil pile slope angles, heights, and dewatering rates. In this study, fresh spoil material collected from a coal mine in Brown Basin Coalfield of Queensland, Australia was subjected to high overburden pressure (0 – 900 kPa) under saturated condition and maintained over a period of time (0 – 6 months) allowing the material to slake. To create the above conditions, laboratory designed pressure chambers were used. Once a spoil sample was slaked under certain overburden pressure over a period of time, it was tested for classification, permeability, and strength properties. Results of this testing program suggested that the slaking of saturated coal mine spoil increase with overburden pressure and the time duration over which the overburden pressure was maintained. Further, it was observed that shear strength and permeability of spoil decreased with increase in spoil slaking.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project was an initiation to investigate slaking induced properties detrition of spoil pile materials with overburden pressure and time. The changes in the material properties over time are important parameters that control the behaviour and performance of the piles. The time dependent mechanical and hydraulic properties reported together with mineralogical changes. One chamber designed to apply slaking in the laboratory and geotechnical investigation conducted to fulfil the objective of this project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study analyses British military planning and actions during the Suez Crisis in 1956. It seeks to find military reasons for the change of concepts during the planning and compares these reasons with the tactical doctrines of the time. The thesis takes extensive advantage of military documents preserved in the National Archives, London. In order to expand the understanding of the exchange of views during the planning process, the private papers of high ranking military officials have also been consulted. French military documents preserved in the Service Historique de la Defence, Paris, have provided an important point of comparison. The Suez Crisis caught the British armed forces in the middle of a transition phase. The main objective of the armed forces was to establish a credible deterrence against the Soviet Union. However, due to overseas commitments the Middle East playing a paramount role because of its economic importance the armed forces were compelled to also prepare for Limited War and the Cold War. The armed forces were not fully prepared to meet this demand. The Middle Eastern garrison was being re-organised after the withdrawal from the Canal Base and the concept for a strategic reserve was unimplemented. The tactical doctrines of the time were based on experiences from the Second World War. As a result, the British view of amphibious operations and the subsequent campaigns emphasised careful planning, mastery of the sea and the air, sufficient superiority in numbers and firepower, centralised command and extensive administrative preparations. The British military had realized that Nasser could nationalise the Suez Canal and prepared an outline plan to meet this contingency. Although the plan was nothing more than a concept, it was accepted as a basis for further planning when the Canal was nationalised at the end of July. This plan was short-lived. The nominated Task Force Commanders shifted the landing site from Port Said to Alexandria because it enabled faster expansion of the bridgehead. In addition, further operations towards Cairo the hub of Nasser s power would be easier to conduct. The operational concept can be described as being traditional and was in accordance with the amphibious warfare doctrine. This plan was completely changed at the beginning of September. Apparently, General Charles Keightley, the Commander-in-Chief, and the Chairman of the Chiefs of Staff Committee developed the idea of prolonged aerial operations. The essence of the concept was to break the Egyptian will to resist by attacking the oil facilities, the transportation system and the armed forces. This victory through air concept would be supported by carefully planned psychological operations. This concept was in accordance with the Royal Air Force doctrine, which promoted a bomber offensive against selected target categories. General Keightley s plan was accepted despite suspicions at every planning level. The Joint Planning Staff and the Task Force Commanders opposed the concept from the beginning to the end because of its unpredictability. There was no information that suggested the bombing would persuade the Egyptians to submit. This problem was worsened by the fact that British intelligence was unable to provide reliable strategic information. The Task Force Commanders, who were responsible for the tactical plans, were not able to change Keightley s mind, but the concept was expanded to include a traditional amphibious assault on Port Said due to their resistance. The bombing campaign was never tested as the Royal Air Force was denied authorisation to destroy the transportation and oil targets. The Chiefs of Staff and General Keightley were too slow to realise that the execution of the plan depended on the determination of the Prime Minister. However, poor health, a lack of American and domestic support and the indecisiveness of the military had ruined Eden s resolve. In the end, a very traditional amphibious assault, which was bound to succeed at the tactical level but fail at the strategic level, was launched against Port Said.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This article contributes an original integrated model of an open-pit coal mine for supporting energy-efficient decisions. Mixed integer linear programming is used to formulate a general integrated model of the operational energy consumption of four common open-pit coal mining subsystems: excavation and haulage, stockpiles, processing plants and belt conveyors. Mines are represented as connected instances of the four subsystems, in a flow sheet manner, which are then fitted to data provided by the mine operators. Solving the integrated model ensures the subsystems’ operations are synchronised and whole-of-mine energy efficiency is encouraged. An investigation on a case study of an open-pit coal mine is conducted to validate the proposed methodology. Opportunities are presented for using the model to aid energy-efficient decision-making at various levels of a mine, and future work to improve the approach is described.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The phase-out of Mulesing by 2010 means the Australian wool industry requires immediate and viable alternatives for the control and prevention of blowfly strike, an economically important parasitic disease of sheep. In this review we have analysed previous research aimed toward the development of a vaccine against blowfly strike and the reasons why the approaches taken were unsuccessful at the time. Close scrutiny has provided new insight into this host-parasite interaction and identified new opportunities for the development of a vaccine. Here we propose that addressing immunosuppression together with the induction of cellular immunity is likely to result in an anti-blowfly strike vaccine, as opposed to the use of "standard" approaches aimed at inducing humoral immunity.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Geatches v Anglo Coal (Moranbah North Management Pty Ltd [2014] QSC 106, a dispute arose in the context of an assessment of costs as to the meaning to be attributed to particular terms of settlement and discharge signed by the parties. The court was required to consider the implications of those documents, and of a subsequent consent order intended to reflect the agreed settlement. Recovery of costs - terms of settlement and discharge exclude recovery of costs against one party and require other party to pay costs of claim against it - whether only subsequent consent order should be construed - implications where costs were common and mixed costs - whether costs should be apportioned

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objective To test strategies for the application of dicyclanil and mid-season crutching to maximise protection of unmulesed sheep against breech strike. Procedure Three hundred and eighty unmulesed Merino weaners were randomly allocated to four groups either left untreated or treated by different strategies with 50 g/L dicyclanil. Treatments included breech treatment alone and breech plus body treatment, with two application times, immediately after shearing and 6 weeks after crutching or shearing. To assess protection, larval implants with newly hatched Lucilia cuprina larvae were applied to 10 different sheep from each group at 3, 4, 5 and 6 months after crutching and shearing and assessed for the development of strike at 48 hours. The concentration of dicyclanil was measured in wool samples clipped from the breeches of the test sheep. Results All dicyclanil treatments gave significant reduction in strike in comparison to controls up until 4 months after crutching but protection in the sheep treated immediately after shearing had waned at 5 months. Treating at 6 weeks after crutching provided significant reduction (P < 0.05) in strike for 6 months. Results for strike incidence immediately after shearing and concentration of dicyclanil in the breech wool also suggested improvements in protection by delaying treatment for 6 weeks. Conclusion In most environments it should be possible to protect unmulesed sheep against breech strike with a carefully planned integrated control program incorporating strategically timed crutching, shearing and dicyclanil application. Delaying treatment with dicyclanil to at least 6 weeks after shearing or crutching increased the protection provided in comparison to treatment immediately after shearing.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The coal seam gas (CSG) industry is globally of potentially great importance economically. This study exemplifies the complex relationship between land use and management, groundwater impact and associated water treatment especially in relation to Queensland where a significant increase in the amount of gas extracted over the past 6 years has occurred. In order to effectively manage the environmental impact of the CSG industry it is necessary to appropriately understand the nature of the gas deposits, methods for gas collection, the physicochemical composition of the by-product associated water and the technologies available for water remediation. Australia is mainly considered arid and semi-arid and thus there is a need to not only beneficially reuse water resources but also protect existing ground water reservoirs such as the Great Artesian Basin (GAB). This paper focussed primarily on the Surat Basin located in Queensland and northern New South Wales. The mechanism for CSG formation, relation to local geological features, extraction approach and the potential impact/benefits of associated water was discussed. An outline of the current legislative requirements on physical and chemical properties of associated water in the Surat Basin was also provided, as well as the current treatment technologies used by the major CSG companies. This review was of significance in relation to the formulation of the most appropriate and cost effective management of associated water, while simultaneously preserving existing water resources and the environment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study aimed to assess the effect of tea tree oil based formulations against two major ectoparasitic diseases in the sheep industry, flystrike and louse infestation, and to provide data to assist the assessment of the commercial feasibility of development of tea tree oil based ectoparasiticides. The results demonstrate insecticidal effects against both sheep lice and blowflies and repellent effects against adult flies and maggots. Dipping sheep in a Tea Tree Oil based formulation appeared to completely eradicate lice and suggests its potential use in sheep dipping formulations. Repellent and insecticidal effects against sheep blowflies, together with previously reported anti-microbial and wound healing properties, suggest significant benefits from the inclusion of tea tree oil in flystrike and wound treatment formulations. These effects occurred at concentrations of Tea Tree Oil that suggest the commercial viability of development of Tea Tree Oil based formulations for sheep parasite control and wound treatment and a potential new market for Tea Tree Oil.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Digital Image

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Coal seam gas (CSG) is a growing industry in Queensland and represents a potential major employer and deliverer of financial prosperity for years to come. CSG is a natural gas composed primarily of methane and is found trapped underground in coal beds. During the gas extraction process, significant volumes of associated water are also produced. This associated water could be a valuable resource, however, the associated water comprises of various salt constituents that make it problematic for beneficial use. Consequently, there is a need to implement various water treatment strategies to purify the associated water to comply with Queensland’s strict guidelines and to mitigate environmental risks. The resultant brine is also of importance as ultimately it also has to be dealt with in an economical manner. In some ways it can be considered that the CSG industry does not face a water problem, as this has inherent value to society, but rather has a “salt issue” to solve. This study analyzes the options involved in both the water treatment and salt recovery processes. A brief overview of the constituents present in Queensland CS water is made to illustrate the challenges involved and a range of treatment technologies discussed. Water treatment technologies examined include clarification (ballasted flocculation, dissolved air flotation, electrocoagulation), membrane filtration (ultrafiltration), ion exchange softening and desalination (ion exchange, reverse osmosis desalination and capacitance deionization). In terms of brine management we highlighted reinjection, brine concentration ponds, membrane techniques (membrane distillation, forward osmosis), thermal methods, electrodialysis, electrodialysis reversal, bipolar membrane electrodialysis, wind assisted intensive evaporation, membrane crystallization, eutectic freeze crystallization and vapor compression. As an entirety this investigation is designed to be an important tool in developing CS water treatment management strategies for effective management in Queensland and worldwide.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this study, a bench scale forward osmosis (FO) process was operated using two commonly available FO membranes in different orientations in order to examine the removal of foulants in the coal seam gas (CSG) associated water, the water flux and fouling behaviours of the process were also investigated. After 48 h of fouling simulation experiment, the water flux declined by approximately 55 and 35% of its initial level in the TFC-PRO and CTA-PRO modes (support layer facing the feed), respectively, while the flux decline in the TFC-FO and CTA-FO modes (active layer facing the feed) was insignificant. The flux decline in PRO modes was caused by the compounding effects of internal concentration polarisation and membrane fouling. However, the declined flux was completely recovered to its initial level following the hydraulic cleaning using deionised water. Dissolved organic carbon (DOC), adenosine tri-phosphate (ATP) and major inorganic scalants (Ca, Mg and silica) in the CSG feed were effectively removed by using the FO process. The results of this study suggest that the FO process shows promising potential to be employed as an effective pre-treatment for membrane purification of CSG associated water.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A study of the thermal decomposition and ignition of coal as functions of pelletizing pressure and dwell time has revealed that: (1) ignition and thermal behaviour are related to the apparent density of the pelletized coal; (2) for a given apparent density of pelletized coal, the ignition temperature is related to the rate constants of thermal decomposition. Isothermal decomposition in air at 550 °C has been shown to fit the Avrami-Erofeev equation for three-dimensional growth of nuclei.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

"88000 Ztr. Kohlen im Werte von 120000 Mark"