996 resultados para Orbit determination
Resumo:
Today, there is little knowledge on the attitude state of decommissioned intact objects in Earth orbit. Observational means have advanced in the past years, but are still limited with respect to an accurate estimate of motion vector orientations and magnitude. Especially for the preparation of Active Debris Removal (ADR) missions as planned by ESA’s Clean Space initiative or contingency scenarios for ESA spacecraft like ENVISAT, such knowledge is needed. ESA's “Debris Attitude Motion Measurements and Modelling” project (ESA Contract No. 40000112447), led by the Astronomical Institute of the University of Bern (AIUB), addresses this problem. The goal of the project is to achieve a good understanding of the attitude evolution and the considerable internal and external effects which occur. To characterize the attitude state of selected targets in LEO and GTO, multiple observation methods are combined. Optical observations are carried out by AIUB, Satellite Laser Ranging (SLR) is performed by the Space Research Institute of the Austrian Academy of Sciences (IWF) and radar measurements and signal level determination are provided by the Fraunhofer Institute for High Frequency Physics and Radar Techniques (FHR). The In-Orbit Tumbling Analysis tool (ιOTA) is a prototype software, currently in development by Hyperschall Technologie Göttingen GmbH (HTG) within the framework of the project. ιOTA will be a highly modular software tool to perform short-(days), medium-(months) and long-term (years) propagation of the orbit and attitude motion (six degrees-of-freedom) of spacecraft in Earth orbit. The simulation takes into account all relevant acting forces and torques, including aerodynamic drag, solar radiation pressure, gravitational influences of Earth, Sun and Moon, eddy current damping, impulse and momentum transfer from space debris or micro meteoroid impact, as well as the optional definition of particular spacecraft specific influences like tank sloshing, reaction wheel behaviour, magnetic torquer activity and thruster firing. The purpose of ιOTA is to provide high accuracy short-term simulations to support observers and potential ADR missions, as well as medium-and long-term simulations to study the significance of the particular internal and external influences on the attitude, especially damping factors and momentum transfer. The simulation will also enable the investigation of the altitude dependency of the particular external influences. ιOTA's post-processing modules will generate synthetic measurements for observers and for software validation. The validation of the software will be done by cross-calibration with observations and measurements acquired by the project partners.
Resumo:
New values for the astronomical parameters of the Earth's orbit and rotation (eccentricity, obliquity and precession) are proposed for paleoclimatic research related to the Late Miocene, the Pliocene and the Quaternary. They have been obtained from a numerical solution of the Lagrangian system of the planetary point masses and from an analytical solution of the Poisson equations of the Earth-Moon system. The analytical expansion developed in this paper allows the direct determination of the main frequencies with their phase and amplitude. Numerical and analytical comparisons with the former astronomical solution BER78 are performed so that the accuracy and the interval of time over which the new solution is valid can be estimated. The corresponding insolation values have also been computed and compared to the former ones. This analysis leads to the conclusion that the new values are expected to be reliable over the last 5 Ma in the time domain and at least over the last 10 Ma in the frequency domain.
Resumo:
Measurements of the sea surface obtained by satellite borne radar altimetry are irregularly spaced and contaminated with various modelling and correction errors. The largest source of uncertainty for low Earth orbiting satellites such as ERS-1 and Geosat may be attributed to orbital modelling errors. The empirical correction of such errors is investigated by examination of single and dual satellite crossovers, with a view to identifying the extent of any signal aliasing: either by removal of long wavelength ocean signals or introduction of additional error signals. From these studies, it was concluded that sinusoidal approximation of the dominant one cycle per revolution orbit error over arc lengths of 11,500 km did not remove a significant mesoscale ocean signal. The use of TOPEX/Poseidon dual crossovers with ERS-1 was shown to substantially improve the radial accuracy of ERS-1, except for some absorption of small TOPEX/Poseidon errors. The extraction of marine geoid information is of great interest to the oceanographic community and was the subject of the second half of this thesis. Firstly through determination of regional mean sea surfaces using Geosat data, it was demonstrated that a dataset with 70cm orbit error contamination could produce a marine geoid map which compares to better than 12cm with an accurate regional high resolution gravimetric geoid. This study was then developed into Optimal Fourier Transform Interpolation, a technique capable of analysing complete altimeter datasets for the determination of consistent global high resolution geoid maps. This method exploits the regular nature of ascending and descending data subsets thus making possible the application of fast Fourier transform algorithms. Quantitative assessment of this method was limited by the lack of global ground truth gravity data, but qualitative results indicate good signal recovery from a single 35-day cycle.
Resumo:
The time for conducting Preventive Maintenance (PM) on an asset is often determined using a predefined alarm limit based on trends of a hazard function. In this paper, the authors propose using both hazard and reliability functions to improve the accuracy of the prediction particularly when the failure characteristic of the asset whole life is modelled using different failure distributions for the different stages of the life of the asset. The proposed method is validated using simulations and case studies.