Determination of preventive maintenance lead time using hybrid analysis
Data(s) |
2005
|
---|---|
Resumo |
The time for conducting Preventive Maintenance (PM) on an asset is often determined using a predefined alarm limit based on trends of a hazard function. In this paper, the authors propose using both hazard and reliability functions to improve the accuracy of the prediction particularly when the failure characteristic of the asset whole life is modelled using different failure distributions for the different stages of the life of the asset. The proposed method is validated using simulations and case studies. |
Formato |
application/pdf |
Identificador | |
Publicador |
Wanfangdata (北京万方数据股份有限公司 ) |
Relação |
http://eprints.qut.edu.au/23150/1/c23150.pdf http://gjsbgcygl.periodicals.net.cn/default.html Ma, Lin, Mathew, Joseph, Sun, Yong, & Zhang, Sheng (2005) Determination of preventive maintenance lead time using hybrid analysis. International Journal of Plant Engineering and Management (国际设备工程与管理), 10(1), pp. 13-18. |
Direitos |
Copyright 2005 Wanfangdata (北京万方数据股份有限公司) |
Fonte |
Faculty of Built Environment and Engineering |
Palavras-Chave | #091399 Mechanical Engineering not elsewhere classified #099999 Engineering not elsewhere classified #Preventive Maintenance, Reliability, Hazard |
Tipo |
Journal Article |