814 resultados para Angling Management Organization
Resumo:
Building project management requires effective coordination and collaboration between multiple project members. It can be achieved through real time communication flow between all. In present scenario, it can be achieved through adoption of Information and Communication Technologies (ICT). Construction industry primarily comprises small and medium enterprises (SMEs). Also, ICT adoption has been slow in the industry.---------- Research is required to assess the factors that affect ICT adoption at the three levels of industry, organization and people, with focus on SMEs. This paper discusses a component of the research undertaken to study these factors and issues in the context of Indian construction industry. A questionnaire survey was conducted and through quantitative data analysis the extent of adoption of formal Project Management processes, ICT adoption for these processes and factors including perception based factors affecting ICT adoption were studied. Results of data analysis includes identification of issues that require action at the three study levels.---------- The results can be generalized for other countries with due considerations, specifically for countries where the construction industry is similar to Indian construction industry in terms of working methodologies or for large countries.
Resumo:
The aim of the study is to identify the opportunities and challenges a local government public asset manager is most likely to deal with when adopting the appropriate Public Asset Management Framework especially in developing countries. In order to achieve its aim, this study employs a Case Study in Indonesia for collecting all data i.e. interviews, document analysis and observations at South Sulawesi Province, Indonesia. The study concludes that there are significant opportunities and challenges that local governments in developing countries, especially Indonesia, might be required to manage if apply public asset management framework appropriately. The opportunities are more effective and efficient local government, accountable and auditable local government organization, increase local government portfolio, reflect up to date information for decision makers in local government, and improve the quality of public services. On the other hand, there are also challenges. Those challenges are local governments has no clear legal and institutional framework to support the asset management application, non-profit principle of public assets, cross jurisdictions and applications in public asset management, the complexity of public organization objectives, and data availability required for managing public property. The study only covers the condition of developing countries where Indonesia as an example, which could not represent exactly the whole local governments’ condition in the world. Further study to develop an asset management system applicable for all local governments in developing countries is urgently needed. Findings from this study will provide useful input for the policy maker, scholars and asset management practitioners to develop an asset management framework for more efficient and effective local governments.
Resumo:
The purpose of this paper is to emphasis the significance of public asset management in Indonesia that is by identifying opportunities and challenges of Indonesian local governments in adopting current practice of Public Asset Management System. A Case Study, in South Sulawesi Provincial government was used as the approach to achieve the research objective. The case study involved two data collection techniques i.e. interviews followed by study on documents. The result of the study indicates there are some significant opportunities and challenges that Indonesian local government might deal with in adopting current practice of public asset management. There are opportunities that can lead to more effective and efficient local government, accountable and auditable local government organization, increase local government portfolio, and improve the quality of public services. The challenges include no clear institutional and legal framework to support the asset management application, non-profit principle of public assets, cross jurisdictions in public asset management, complexity of local government objectives, and unavailability of data for managing public property. The study only covers condition of South Sulawesi Province, which could not represent exactly the whole local governments’ condition in Indonesia. Findings from this study provide useful input for the policy makers, scholars and asset management practitioners in Indonesia to establish a public asset management framework that suitable for Indonesia.
Resumo:
Purpose – Building project management requires real time flow of information between all the project team members or the supply chain members. In the present scenario, when project participants are geographically separated, adoption of Information Communication Technology (ICT) enables such effective communication. But strategic adoption of ICT requires that all the supply chain members follow the accepted methods of communication or the communication protocols. The majority of the construction organizations are small and medium enterprises (SMEs). This research, therefore, proposes to focus on developing IT-enhanced communication protocols for building project management by SMEs. Design/methodology/approach – The research adopts a sequential mixed methods approach, where data collection and analysis are conducted in both the quantitative and qualitative phases of research. Findings – The protocols are proposed as a “Strategic Model for Enhancing ICT Diffusion in Building Projects”. The framework for the model is discussed at three levels of study, i.e industry, organization, and people. Practical implications – While the research was conducted in an Indian context, the research outcome is envisaged to be widely applicable in other countries with due considerations. Originality/value – The developed framework has implications for national level bodies and academic institutions, organizations, people or project managers and is applicable at the international level after due considerations.
Resumo:
An Asset Management (AM) life-cycle constitutes a set of processes that align with the development, operation and maintenance of assets, in order to meet the desired requirements and objectives of the stake holders of the business. The scope of AM is often broad within an organization due to the interactions between its internal elements such as human resources, finance, technology, engineering operation, information technology and management, as well as external elements such as governance and environment. Due to the complexity of the AM processes, it has been proposed that in order to optimize asset management activities, process modelling initiatives should be adopted. Although organisations adopt AM principles and carry out AM initiatives, most do not document or model their AM processes, let alone enacting their processes (semi-) automatically using a computer-supported system. There is currently a lack of knowledge describing how to model AM processes through a methodical and suitable manner so that the processes are streamlines and optimized and are ready for deployment in a computerised way. This research aims to overcome this deficiency by developing an approach that will aid organisations in constructing AM process models quickly and systematically whilst using the most appropriate techniques, such as workflow technology. Currently, there is a wealth of information within the individual domains of AM and workflow. Both fields are gaining significant popularity in many industries thus fuelling the need for research in exploring the possible benefits of their cross-disciplinary applications. This research is thus inspired to investigate these two domains to exploit the application of workflow to modelling and execution of AM processes. Specifically, it will investigate appropriate methodologies in applying workflow techniques to AM frameworks. One of the benefits of applying workflow models to AM processes is to adapt and enable both ad-hoc and evolutionary changes over time. In addition, this can automate an AM process as well as to support the coordination and collaboration of people that are involved in carrying out the process. A workflow management system (WFMS) can be used to support the design and enactment (i.e. execution) of processes and cope with changes that occur to the process during the enactment. So far few literatures can be found in documenting a systematic approach to modelling the characteristics of AM processes. In order to obtain a workflow model for AM processes commonalities and differences between different AM processes need to be identified. This is the fundamental step in developing a conscientious workflow model for AM processes. Therefore, the first stage of this research focuses on identifying the characteristics of AM processes, especially AM decision making processes. The second stage is to review a number of contemporary workflow techniques and choose a suitable technique for application to AM decision making processes. The third stage is to develop an intermediate ameliorated AM decision process definition that improves the current process description and is ready for modelling using the workflow language selected in the previous stage. All these lead to the fourth stage where a workflow model for an AM decision making process is developed. The process model is then deployed (semi-) automatically in a state-of-the-art WFMS demonstrating the benefits of applying workflow technology to the domain of AM. Given that the information in the AM decision making process is captured at an abstract level within the scope of this work, the deployed process model can be used as an executable guideline for carrying out an AM decision process in practice. Moreover, it can be used as a vanilla system that, once being incorporated with rich information from a specific AM decision making process (e.g. in the case of a building construction or a power plant maintenance), is able to support the automation of such a process in a more elaborated way.
Resumo:
This project discusses a component of the research study conducted to provide construction organizations with a generic benchmarking framework to assess their extent of information communication technology (ICT) adoption for building project management processes. It defines benchmarking and discusses objectives of the required benchmarking framework and development of the framework. The study focuses on ICT adoption by small and medium enterprises (SMEs) in the construction industry and with respect to SMEs it is important to understand processes, their indicators, and measures in the local context. Structure of the suggested benchmarking framework has been derived after extensive literature survey and a questionnaire survey conducted in the Indian construction industry. The suggested benchmarking process is an iterative process divided into four stages. It can be implemented at organization and industry levels for rating the construction organizations for ICT adoption and performance measurement. The framework has a generic structure and can be generalized and applied for other countries with due considerations.
Resumo:
Establishing the core principals of “entrepreneurial management” within an organization describes a certain strategic choice that affects a company in six dimensions, according to Stevenson (1983). Our aim is to empirically measure entrepreneurial management (it’s existence and degree) and to link this measured strategic choice (for or against) entrepreneurial management with firm performance. Our argument here is that companies that follow core principals of entrepreneurial management should outperform other more administrative firms in certain measures of strategic performance. This paper builds on an empirical investigation published by Brown, Davidson & Wiklund (2001), who have developed and tested a reliable measurement instrument for Stevenson’s definition of “entrepreneurial management” (Stevenson 1983, Stevenson & Jarillo 1990). In the first part of our paper we aim to replicate and to some extent improve this study. In the second part we link the measured degree of “entrepreneurial management” with firm performance. To our knowledge, even so Stevenson’s definition of entrepreneurial management is commonly acknowledged and Brown et al. (2001) developed a reliable instrument to empirically capture this behavioral approach to management, the construct of entrepreneurial management never before has been linked to firm performance in an empirical study. Since most papers on corporate entrepreneurship and firm performance are based on Covin & Slevin’s (1991) or Miller’s (1983) concept of entrepreneurial orientation, we contribute to the literature on corporate entrepreneurship in a novel way, given the fact that the entrepreneurial management dimensions measured in our study can theoretically and empirically be clearly distinguished from the construct of entrepreneurial orientation as defined by Covin & Selvin (1991).
Resumo:
Sustainable practices are more than ever on the radar screen of organizations, triggered by a growing demand of the wider population towards approaches and practices that can be considered "green" or "sustainable". Our specific intent with this call for action is to immerse deeper into the role of business processes, and specifically the contributions that the management of these processes can play in leveraging the transformative power of information systems (IS) in order to create environmentally sustainable organizations. Our key premise is that business and information technology (IT) managers need to engage in a process-focused discussion to enable a common, comprehensive understanding of process, and the process-centered opportunities for making these processes, and ultimately the organization as a process-centric entity, "green". Based on a business process lifecycle model, we propose possible avenues for future research.
Resumo:
Change management research has largely ignored the effects of organizational change management history in shaping employee attitudes and behavior. This article develops and tests a model of the effects of poor change management history (PCMH) on employee attitudes (trust, job satisfaction, turnover intentions, change cynicism, and openness to change) and actual turnover. We found that PCMH, through PCMH beliefs, led to lower trust, job satisfaction and openness to change, and higher cynicism and turnover intentions. Also, PCMH beliefs predicted employee turnover over 2 years.
Resumo:
Objective: To determine whether primary care management of chronic heart failure (CHF) differed between rural and urban areas in Australia. Design: A cross-sectional survey stratified by Rural, Remote and Metropolitan Areas (RRMA) classification. The primary source of data was the Cardiac Awareness Survey and Evaluation (CASE) study. Setting: Secondary analysis of data obtained from 341 Australian general practitioners and 23 845 adults aged 60 years or more in 1998. Main outcome measures: CHF determined by criteria recommended by the World Health Organization, diagnostic practices, use of pharmacotherapy, and CHF-related hospital admissions in the 12 months before the study. Results: There was a significantly higher prevalence of CHF among general practice patients in large and small rural towns (16.1%) compared with capital city and metropolitan areas (12.4%) (P < 0.001). Echocardiography was used less often for diagnosis in rural towns compared with metropolitan areas (52.0% v 67.3%, P < 0.001). Rates of specialist referral were also significantly lower in rural towns than in metropolitan areas (59.1% v 69.6%, P < 0.001), as were prescribing rates of angiotensin-converting enzyme inhibitors (51.4% v 60.1%, P < 0.001). There was no geographical variation in prescribing rates of β-blockers (12.6% [rural] v 11.8% [metropolitan], P = 0.32). Overall, few survey participants received recommended “evidence-based practice” diagnosis and management for CHF (metropolitan, 4.6%; rural, 3.9%; and remote areas, 3.7%). Conclusions: This study found a higher prevalence of CHF, and significantly lower use of recommended diagnostic methods and pharmacological treatment among patients in rural areas.
Resumo:
In this research we examined, by means of case studies, the mechanisms by which relationships can be managed and by which communication and cooperation can be enhanced in developing sustainable supply chains. The research was predicated on the contention that the development of a sustainable supply chain depends, in part, on the transfer of knowledge and capabilities from the larger players in the supply chain. A sustainable supply chain requires proactive relationship management and the development of an appropriate organisational culture, and trust. By legitimising individuals’ expectations of the type of culture which is appropriate to their company and empowering employees to address mismatches that may occur, a situation can be created whereby the collaborating organisations develop their competences symbiotically and so facilitate a sustainable supply chain. Effective supply chain management enhances organisation performance and competitiveness through the management of operations across organisational boundaries. Relational contracting approaches facilitate the exchange of information and knowledge and build capacity in the supply chain, thus enhancing its sustainability. Relationship management also provides the conditions necessary for the development of collaborative and cooperative relationships However, often subcontractors and suppliers are not empowered to attend project meetings or to have direct communication with project based staff. With this being a common phenomenon in the construction industry, one might ask: what are the barriers to implementation of relationship management through the supply chain? In other words, the problem addressed in this research is the engagement of the supply chain through relationship management.
Resumo:
Both Knowledge Management (KM) and Project Management (PM) are known as crucial factors to develop competitive advantage(CA). PM Office (PMO) is recognized as a strong solution to institutionalize PM practices in organization. However, according to the literature there is a significant gap in addressing KM practices in the PMO. In other words, existing PMO maturity models has not been addressed from KM perceptive. This paper discusses undertaken investigations of both KM and PM as an initial part of PhD research on the role of knowledge in PMO
Resumo:
This paper reviews diversity in knowledge management (KM) from a cultural perspective; it argues that culturally embedded theories and practices influence the practice of knowledge management. It further presents and analyses several case studies and in particular a case study of the Islamic culture focusing on its traditional approach to both Islamic knowledge and management. The analysis of this case reveals the cultural challenges that emerge in the process of applying essentially Western management theories within an Islamic culture with particular reference to knowledge management theories. The paper concludes that the concept of knowledge management must take into account the diversity of national culture in which the organization exists and that the concept of knowledge management will benefit from a diversity perspective rather than a universality perspective.
Resumo:
Humankind has been dealing with all kinds of disasters since the dawn of time. The risk and impact of disasters producing mass casualties worldwide is increasing, due partly to global warming as well as to increased population growth, increased density and the aging population. China, as a country with a large population, vast territory, and complex climatic and geographical conditions, has been plagued by all kinds of disasters. Disaster health management has traditionally been a relatively arcane discipline within public health. However, SARS, Avian Influenza, and earthquakes and floods, along with the need to be better prepared for the Olympic Games in China has brought disasters, their management and their potential for large scale health consequences on populations to the attention of the public, the government and the international community alike. As a result significant improvements were made to the disaster management policy framework, as well as changes to systems and structures to incorporate an improved disaster management focus. This involved the upgrade of the Centres for Disease Control and Prevention (CDC) throughout China to monitor and better control the health consequences particularly of infectious disease outbreaks. However, as can be seen in the Southern China Snow Storm and Wenchuan Earthquake in 2008, there remains a lack of integrated disaster management and efficient medical rescue, which has been costly in terms of economics and health for China. In the context of a very large and complex country, there is a need to better understand whether these changes have resulted in effective management of the health impacts of such incidents. To date, the health consequences of disasters, particularly in China, have not been a major focus of study. The main aim of this study is to analyse and evaluate disaster health management policy in China and in particular, its ability to effectively manage the health consequences of disasters. Flood has been selected for this study as it is a common and significant disaster type in China and throughout the world. This information will then be used to guide conceptual understanding of the health consequences of floods. A secondary aim of the study is to compare disaster health management in China and Australia as these countries differ in their length of experience in having a formalised policy response. The final aim of the study is to determine the extent to which Walt and Gilson’s (1994) model of policy explains how disaster management policy in China was developed and implemented after SARS in 2003 to the present day. This study has utilised a case study methodology. A document analysis and literature search of Chinese and English sources was undertaken to analyse and produce a chronology of disaster health management policy in China. Additionally, three detailed case studies of flood health management in China were undertaken along with three case studies in Australia in order to examine the policy response and any health consequences stemming from the floods. A total of 30 key international disaster health management experts were surveyed to identify fundamental elements and principles of a successful policy framework for disaster health management. Key policy ingredients were identified from the literature, the case-studies and the survey of experts. Walt and Gilson (1994)’s policy model that focuses on the actors, content, context and process of policy was found to be a useful model for analysing disaster health management policy development and implementation in China. This thesis is divided into four parts. Part 1 is a brief overview of the issues and context to set the scene. Part 2 examines the conceptual and operational context including the international literature, government documents and the operational environment for disaster health management in China. Part 3 examines primary sources of information to inform the analysis. This involves two key studies: • A comparative analysis of the management of floods in China and Australia • A survey of international experts in the field of disaster management so as to inform the evaluation of the policy framework in existence in China and the criteria upon which the expression of that policy could be evaluated Part 4 describes the key outcomes of this research which include: • A conceptual framework for describing the health consequences of floods • A conceptual framework for disaster health management • An evaluation of the disaster health management policy and its implementation in China. The research outcomes clearly identified that the most significant improvements are to be derived from improvements in the generic management of disasters, rather than the health aspects alone. Thus, the key findings and recommendations tend to focus on generic issues. The key findings of this research include the following: • The health consequences of floods may be described in terms of time as ‘immediate’, ‘medium term’ and ‘long term’ and also in relation to causation as ‘direct’ and ‘indirect’ consequences of the flood. These two aspects form a matrix which in turn guides management responses. • Disaster health management in China requires a more comprehensive response throughout the cycle of prevention, preparedness, response and recovery but it also requires a more concentrated effort on policy implementation to ensure the translation of the policy framework into effective incident management. • The policy framework in China is largely of international standard with a sound legislative base. In addition the development of the Centres for Disease Control and Prevention has provided the basis for a systematic approach to health consequence management. However, the key weaknesses in the current system include: o The lack of a key central structure to provide the infrastructure with vital support for policy development, implementation and evaluation. o The lack of well-prepared local response teams similar to local government based volunteer groups in Australia. • The system lacks structures to coordinate government action at the local level. The result of this is a poorly coordinated local response and lack of clarity regarding the point at which escalation of the response to higher levels of government is advisable. These result in higher levels of risk and negative health impacts. The key recommendations arising from this study are: 1. Disaster health management policy in China should be enhanced by incorporating disaster management considerations into policy development, and by requiring a disaster management risk analysis and disaster management impact statement for development proposals. 2. China should transform existing organizations to establish a central organisation similar to the Federal Emergency Management Agency (FEMA) in the USA or the Emergency Management Australia (EMA) in Australia. This organization would be responsible for leading nationwide preparedness through planning, standards development, education and incident evaluation and to provide operational support to the national and local government bodies in the event of a major incident. 3. China should review national and local plans to reflect consistency in planning, and to emphasize the advantages of the integrated planning process. 4. Enhance community resilience through community education and the development of a local volunteer organization. China should develop a national strategy which sets direction and standards in regard to education and training, and requires system testing through exercises. Other initiatives may include the development of a local volunteer capability with appropriate training to assist professional response agencies such as police and fire services in a major incident. An existing organisation such as the Communist Party may be an appropriate structure to provide this response in a cost effective manner. 5. Continue development of professional emergency services, particularly ambulance, to ensure an effective infrastructure is in place to support the emergency response in disasters. 6. Funding for disaster health management should be enhanced, not only from government, but also from other sources such as donations and insurance. It is necessary to provide a more transparent mechanism to ensure the funding is disseminated according to the needs of the people affected. 7. Emphasis should be placed on prevention and preparedness, especially on effective disaster warnings. 8. China should develop local disaster health management infrastructure utilising existing resources wherever possible. Strategies for enhancing local infrastructure could include the identification of local resources (including military resources) which could be made available to support disaster responses. It should develop operational procedures to access those resources. Implementation of these recommendations should better position China to reduce the significant health consequences experienced each year from major incidents such as floods and to provide an increased level of confidence to the community about the country’s capacity to manage such events.
Resumo:
The safety risk management process describes the systematic application of management policies, procedures and practices to the activities of communicating, consulting, establishing the context, and identifying, analysing, evaluating, treating, monitoring and reviewing risk. This process is undertaken to provide assurances that the risks of a particular unmanned aircraft system activity have been managed to an acceptable level. The safety risk management process and its outcomes form part of the documented safety case necessary to obtain approvals for unmanned aircraft system operations. It also guides the development of an organisation’s operations manual and is a primary component of an organisation’s safety management system. The aim of this chapter is to provide existing risk practitioners with a high level introduction to some of the unique issues and challenges in the application of the safety risk management process to unmanned aircraft systems. The scope is limited to safety risks associated with the operation of unmanned aircraft in the civil airspace system and over inhabited areas. The structure of the chapter is based on the safety risk management process as defined by the international risk management standard ISO 31000:2009 and draws on aviation safety resources provided by International Civil Aviation Organization, the Federal Aviation Administration and U.S. Department of Defense. References to relevant aviation safety regulations, programs of research and fielded systems are also provided.