954 resultados para public infrastructure
Resumo:
Major maintenance; health, safety, loss of use; and Americans with Disabilities Act deficiencies at the Capitol Complex and statewide for twelve agencies and divisions participating in the Vertical Infrastructure Program in collaboration with the Governor's Vertical Infrastructure Advisory Committee, including the Department of Administrative Services; the Department of Commerce, Alcoholic Beverages Division; the Department of Corrections; the Department of Cultural Affairs; the Department of Education, including Iowa Public Television and Iowa Vocational Rehabilitation Services; the Department of Human Services; Iowa Law Enforcement Academy; the Department of Public Safety; Terrace Hill; Iowa Veterans Home and Iowa Workforce Development. The advisory committee meets on a monthly basis to review the progress of the work and to make recommendations on procedures and priorities. Additional information on major maintenance projects is available in the advisory committee's Tenth Annual Report to the Governor, dated December 15, 2008.
Resumo:
Major maintenance; health, safety, loss of use; and Americans with Disabilities Act deficiencies at the Capitol Complex and statewide for twelve agencies and divisions participating in the Vertical Infrastructure Program in collaboration with the Governor's Vertical Infrastructure Advisory Committee, including the Department of Administrative Services; the Department of Commerce, Alcoholic Beverages Division; the Department of Corrections; the Department of Cultural Affairs; the Department of Education, including Iowa Public Television and Iowa Vocational Rehabilitation Services; the Department of Human Services; Iowa Law Enforcement Academy; the Department of Public Safety; Terrace Hill; Iowa Veterans Home and Iowa Workforce Development. The advisory committee meets on a monthly basis to review the progress of the work and to make recommendations on procedures and priorities. Additional information on major maintenance projects is available in the advisory committee's Tenth Annual Report to the Governor, dated December 15, 2008.
Resumo:
AIM: To provide insight into cancer registration coverage, data access and use in Europe. This contributes to data and infrastructure harmonisation and will foster a more prominent role of cancer registries (CRs) within public health, clinical policy and cancer research, whether within or outside the European Research Area. METHODS: During 2010-12 an extensive survey of cancer registration practices and data use was conducted among 161 population-based CRs across Europe. Responding registries (66%) operated in 33 countries, including 23 with national coverage. RESULTS: Population-based oncological surveillance started during the 1940-50s in the northwest of Europe and from the 1970s to 1990s in other regions. The European Union (EU) protection regulations affected data access, especially in Germany and France, but less in the Netherlands or Belgium. Regular reports were produced by CRs on incidence rates (95%), survival (60%) and stage for selected tumours (80%). Evaluation of cancer control and quality of care remained modest except in a few dedicated CRs. Variables evaluated were support of clinical audits, monitoring adherence to clinical guidelines, improvement of cancer care and evaluation of mass cancer screening. Evaluation of diagnostic imaging tools was only occasional. CONCLUSION: Most population-based CRs are well equipped for strengthening cancer surveillance across Europe. Data quality and intensity of use depend on the role the cancer registry plays in the politico, oncomedical and public health setting within the country. Standard registration methodology could therefore not be translated to equivalent advances in cancer prevention and mass screening, quality of care, translational research of prognosis and survivorship across Europe. Further European collaboration remains essential to ensure access to data and comparability of the results.
Resumo:
This paper analyzes the impact of infrastructure investment on Spanish economic growth between 1850 and 1935. Using new infrastructure data and VAR techniques, this paper shows that the growth impact of local-scope infrastructure investment was positive, but returns to investment in large nation-wide networks were not significantly different from zero. Two complementary explanations are suggested for the last result. On the one hand, public intervention and the application of non-efficiency investment criteria were very intense in large network construction. On the other hand, returns to new investment in large networks might have decreased dramatically once the basic links were constructed.
Resumo:
Reliance on private partners to help provide infrastructure investment and service delivery is increasing in the United States. Numerous studies have examined the determinants of the degree of private participation in infrastructure projects as governed by contract type. We depart from this simple public/private dichotomy by examining a rich set of contractual arrangements. We utilize both municipal and state-level data on 472 projects of various types completed between 1985 and 2008. Our estimates indicate that infrastructure characteristics, particularly those that reflect stand alone versus network characteristics, are key factors influencing the extent of private participation. Fiscal variables, such as a jurisdiction’s relative debt level, and basic controls, such as population and locality of government, increase the degree of private participation, while a greater tax burden reduces private participation.
Resumo:
PPPS: Problem: Public-private-partnerships in transport infrastructure characteristically increase user-fees. Purpose: We aim to identify the network effects of the use of PPPs and increased user tolls in road infrastructure. Methods: We study the increases in user tolls on motorways due to the use of PPPs in the US. Results and conclusions: Among other things, the monetization of motorways is associated with an increase in toll levels that has consequences for their users, and also for the rest of the sections of the network.
Resumo:
The main objective of this master’s thesis is to provide a comprehensive view to cloud computing and SaaS, and analyze how well CADM, a unit of Capgemini Finland Ltd., would fit to the cloud-based SaaS business. Another objective for this thesis is to investigate how public clouds would fit for CADM as a delivery model, if they would provide SaaS applications to their customers. This master’s thesis is executed by investigating characteristics of cloud computing and SaaS especially from application provider point of view. This is done by exploring what kinds of researches and analysis there have been done regarding these two phenomena during past few years. Then CADM’s current business model and operations are analyzed from SaaS’s and public cloud’s perspective. This analyzing part is conducted by using SWOT analysis which is widely used analytical tool when observing company’s strategic position and when figuring out possibilities how to improve company’s operations. The conducted analysis and observations reveals that CADM should pursue SaaS business as it could provide remarkable advantages and strengthen their position in current markets. However, pure SaaS model would not be the optimal solution for CADM because they do not have own product which could be transformed to SaaS model, and they lack of Infrastructure Management ability. Also public cloud would not be the most suitable delivery model for them if providing SaaS services. The main observation of this thesis is that CADM should adopt the SaaS model via Capgemini Immediate offering.
Resumo:
The investments have always been considered as an essential backbone and so-called ‘locomotive’ for the competitive economies. However, in various countries, the state has been put under tight budget constraints for the investments in capital intensive projects. In response to this situation, the cooperation between public and private sector has grown based on public-private mechanism. The promotion of favorable arrangement for collaboration between public and private sectors for the provision of policies, services, and infrastructure in Russia can help to address the problems of dry ports development that neither municipalities nor the private sector can solve alone. Especially, the stimulation of public-private collaboration is significant under the exposure to externalities that affect the magnitude of the risks during all phases of project realization. In these circumstances, the risk in the projects also is becoming increasingly a part of joint research and risk management practice, which is viewed as a key approach, aiming to take active actions on existing global and specific factors of uncertainties. Meanwhile, a relatively little progress has been made on the inclusion of the resilience aspects into the planning process of a dry ports construction that would instruct the capacity planner, on how to mitigate the occurrence of disruptions that may lead to million dollars of losses due to the deviation of the future cash flows from the expected financial flows on the project. The current experience shows that the existing methodological base is developed fragmentary within separate steps of supply chain risk management (SCRM) processes: risk identification, risk evaluation, risk mitigation, risk monitoring and control phases. The lack of the systematic approach hinders the solution of the problem of risk management processes of dry port implementation. Therefore, management of various risks during the investments phases of dry port projects still presents a considerable challenge from the practical and theoretical points of view. In this regard, the given research became a logical continuation of fundamental research, existing in the financial models and theories (e.g., capital asset pricing model and real option theory), as well as provided a complementation for the portfolio theory. The goal of the current study is in the design of methods and models for the facilitation of dry port implementation through the mechanism of public-private partnership on the national market that implies the necessity to mitigate, first and foremost, the shortage of the investments and consequences of risks. The problem of the research was formulated on the ground of the identified contradictions. They rose as a continuation of the trade-off between the opportunities that the investors can gain from the development of terminal business in Russia (i.e. dry port implementation) and risks. As a rule, the higher the investment risk, the greater should be their expected return. However, investors have a different tolerance for the risks. That is why it would be advisable to find an optimum investment. In the given study, the optimum relates to the search for the efficient portfolio, which can provide satisfaction to the investor, depending on its degree of risk aversion. There are many theories and methods in finance, concerning investment choices. Nevertheless, the appropriateness and effectiveness of particular methods should be considered with the allowance of the specifics of the investment projects. For example, the investments in dry ports imply not only the lump sum of financial inflows, but also the long-term payback periods. As a result, capital intensity and longevity of their construction determine the necessity from investors to ensure the return on investment (profitability), along with the rapid return on investment (liquidity), without precluding the fact that the stochastic nature of the project environment is hardly described by the formula-based approach. The current theoretical base for the economic appraisals of the dry port projects more often perceives net present value (NPV) as a technique superior to other decision-making criteria. For example, the portfolio theory, which considers different risk preference of an investor and structures of utility, defines net present value as a better criterion of project appraisal than discounted payback period (DPP). Meanwhile, in business practice, the DPP is more popular. Knowing that the NPV is based on the assumptions of certainty of project life, it cannot be an accurate appraisal approach alone to determine whether or not the project should be accepted for the approval in the environment that is not without of uncertainties. In order to reflect the period or the project’s useful life that is exposed to risks due to changes in political, operational, and financial factors, the second capital budgeting criterion – discounted payback period is profoundly important, particularly for the Russian environment. Those statements represent contradictions that exist in the theory and practice of the applied science. Therefore, it would be desirable to relax the assumptions of portfolio theory and regard DPP as not fewer relevant appraisal approach for the assessment of the investment and risk measure. At the same time, the rationality of the use of both project performance criteria depends on the methods and models, with the help of which these appraisal approaches are calculated in feasibility studies. The deterministic methods cannot ensure the required precision of the results, while the stochastic models guarantee the sufficient level of the accuracy and reliability of the obtained results, providing that the risks are properly identified, evaluated, and mitigated. Otherwise, the project performance indicators may not be confirmed during the phase of project realization. For instance, the economic and political instability can result in the undoing of hard-earned gains, leading to the need for the attraction of the additional finances for the project. The sources of the alternative investments, as well as supportive mitigation strategies, can be studied during the initial phases of project development. During this period, the effectiveness of the investments undertakings can also be improved by the inclusion of the various investors, e.g. Russian Railways’ enterprises and other private companies in the dry port projects. However, the evaluation of the effectiveness of the participation of different investors in the project lack the methods and models that would permit doing the particular feasibility study, foreseeing the quantitative characteristics of risks and their mitigation strategies, which can meet the tolerance of the investors to the risks. For this reason, the research proposes a combination of Monte Carlo method, discounted cash flow technique, the theory of real options, and portfolio theory via a system dynamics simulation approach. The use of this methodology allows for comprehensive risk management process of dry port development to cover all aspects of risk identification, risk evaluation, risk mitigation, risk monitoring, and control phases. A designed system dynamics model can be recommended for the decision-makers on the dry port projects that are financed via a public-private partnership. It permits investors to make a decision appraisal based on random variables of net present value and discounted payback period, depending on different risks factors, e.g. revenue risks, land acquisition risks, traffic volume risks, construction hazards, and political risks. In this case, the statistical mean is used for the explication of the expected value of the DPP and NPV; the standard deviation is proposed as a characteristic of risks, while the elasticity coefficient is applied for rating of risks. Additionally, the risk of failure of project investments and guaranteed recoupment of capital investment can be considered with the help of the model. On the whole, the application of these modern methods of simulation creates preconditions for the controlling of the process of dry port development, i.e. making managerial changes and identifying the most stable parameters that contribute to the optimal alternative scenarios of the project realization in the uncertain environment. System dynamics model allows analyzing the interactions in the most complex mechanism of risk management process of the dry ports development and making proposals for the improvement of the effectiveness of the investments via an estimation of different risk management strategies. For the comparison and ranking of these alternatives in their order of preference to the investor, the proposed indicators of the efficiency of the investments, concerning the NPV, DPP, and coefficient of variation, can be used. Thus, rational investors, who averse to taking increased risks unless they are compensated by the commensurate increase in the expected utility of a risky prospect of dry port development, can be guided by the deduced marginal utility of investments. It is computed on the ground of the results from the system dynamics model. In conclusion, the outlined theoretical and practical implications for the management of risks, which are the key characteristics of public-private partnerships, can help analysts and planning managers in budget decision-making, substantially alleviating the effect from various risks and avoiding unnecessary cost overruns in dry port projects.
Resumo:
Cette recherche porte sur le financement public de l’enseignement supérieur au Pérou et ses impacts dans une perspective longitudinale couvant la période 1993-2003. Cette période est importante parce qu’elle a été témoin, dans ce pays, de changements majeurs aux plans du financement public et de la configuration du système d’enseignement supérieur. La recherche consiste principalement dans des analyses secondaires de données pertinentes publiées par des organismes nationaux et internationaux. Les analyses sont structurées à partir d’un schéma d’inputs et outputs. On considère comme inputs les ressources financières et les ressources humaines, lesquelles comprennent les professeurs et les étudiants, et comme outputs les taux de diplomation (efficacité interne) et la demande de diplômés par le marché du travail (efficacité externe). La théorie de la dépendance de ressources sert de cadre pour interpréter les rapports entre le financement public et ses incidences sur les réponses institutionnels et ses conséquences. Dans la période retenue, le financement du secteur public a décru de 32% en raison d’un désengagement progressif de l’État. Une conséquence majeure de la diminution du financement public a été la croissance rapide du secteur privé de l’enseignement supérieur. En effet, alors qu’en 1993 il y avait 24 institutions privées d’enseignement supérieur, il y en avait, en 2003, 46 institutions. La baisse du financement public et la croissance du secteur privé d’enseignement supérieur ont eu des incidences sur la sélectivité des étudiants, sur le statut des professeurs, sur l’implication des universités en recherche et sur les taux de diplomation. Le taux de sélectivité dans le secteur public a augmenté entre 1993 et 2003, alors que ce taux a diminué, dans la même période, dans le secteur privé. Ainsi, le secteur public répond à la diminution du financement en restreignant l’accès à l’enseignement supérieur. Le secteur privé, par contre, diminue sa sélectivité compensant ainsi l’augmentation de la sélectivité dans le secteur public et, par le fait même, augmente sa part de marché. Également, tant dans le secteur public que dans le secteur privé, les professeurs sont engagés principalement sur une base temporaire, ce qui se traduit, particulièrement dans le secteur privé, dans un moindre engagement institutionnel. Enfin, les universités publiques et privées du Pérou font peu de recherche, car elles favorisent, pour balancer leurs budgets, la consultation et les contrats au détriment de la recherche fondamentale. Paradoxalement, alors que, dans le secteur privé, les taux de sélectivité des étudiants diminuent, leurs taux de diplomation augmentent plus que dans le secteur public. Enfin, les formations avec plus d’étudiants inscrits, tant dans le secteur public que privé, sont les moins coûteuses en infrastructure et équipements. Dès lors, la pertinence de la production universitaire devient problématique. Cette recherche révèle que les organisations universitaires, face à un environnement où les ressources financières deviennent de plus en plus rares, développent des stratégies de survie qui peuvent avoir des incidences sur la qualité et la pertinence de l’enseignement supérieur.
Resumo:
In the UK, public expenditure on transport infrastructure is nearly £6 billion for the past few years. Over £500 million per year were spent on bridge assessment and strengthening and reducing the backlog of road requiring maintenance. A further £200 million a year will be spent on keeping the safe operation of the network and efficiently through day to day maintenance, lighting and signing . The Department of Transport is planning to extend private sector experience in road management and operation by introducing Design, Build, Finance and Operate (DBFO) This paper investigates the different ways of financing road transport infrastructure including road pricing, private finance in transport infrastructure, the role of the private sector, Design, Build, Finance and Operate (DBFO) schemes, the benefits and problems of such schemes. The paper considers planning gain as a means of financing transport infrastructure with examples of developers to fund link road building and improvements to the local planning system
Resumo:
There is a lack of knowledge base in relation to experiences gained and lessons learnt from previously executed National Health Service (NHS) infrastructure projects in the UK. This is in part a feature of one-off construction projects, which typify healthcare infrastructure, and in part due to the absence of a suitable method for conveying such information. The complexity of infrastructure delivery process in the NHS makes the construction of healthcare buildings a formidable task. This is particularly the case for the NHS trusts who have little or no experience of construction projects. To facilitate understanding a most important aspect of the delivery process, which is the preparation of a capital investment proposal; steps taken in developing the business case for an NHS healthcare facility are examined. The context for such examination is provided by the planning process of a healthcare project, studied retrospectively. The process is analysed using a social science based method called ‘building stories’, developed at the University of California-Berkeley. By applying this method, stories or narratives are constructed around the data captured on the case study. The findings indicate that the business case process may be used to justify, rather than identify, trusts’ requirements. The study is useful for UK public sector clients as well as consultants and professionals who aim to participate in the delivery of healthcare infrastructure projects in the UK.
Resumo:
Background - Green infrastructure is a strategic network of green spaces designed to deliver ecosystem services to human communities. Green infrastructure is a convenient concept for urban policy makers, but the term is used too-generically and with limited understanding of the relative values or benefits of different types of green space and how these complement one another. At a finer scale/more practical level– little consideration is given to the composition of the plant-communities, yet this is what ultimately defines extent of service provision. This paper calls for greater attention to be paid to urban plantings with respect to ecosystem service delivery and for plant science to engage more-fully in identifying those plants that promote various services. Scope - Many urban plantings are designed based on aesthetics alone, with limited thought on how plant choice/composition provides other ecosystem services. Research is beginning to demonstrate, however, that landscape plants provide a range of important services, such as helping mitigate floods and alleviating heat islands, but that not all species are equally effective. The paper reviews a number of important services and demonstrates how genotype choice radically affects service delivery. Conclusions – Although research is in its infancy, data is being generated that relates plant traits to specific services; thereby helping identify genotypes that optimise service delivery. The urban environment, however, will become exceedingly bland if future planting is simply restricted to monocultures of a few ‘functional’ genotypes. Therefore, further information is required on how to design plant communities where the plants identified:- a/ provide more than a single benefit (multi-functionality) b/ complement each other in maximising the range of benefits that can be delivered in one location and c/ continue to maintain public acceptance through diversity. The identification/development of functional landscape plants is an exciting and potentially high impact arena for plant science.
Resumo:
Gross domestic product (GDP) is generally considered as the most important index and comprehensive measure of the size of economy. This paper investigates empirically the relationship between transport infrastructure (focus on highways) and GDP growth based on a production function approach. The physical stocks of transport infrastructure were used instead of monetary data to measure public capital together with several other variables (labor and private capital) that were hypothesized to affect economic growth. Then we explore a number of subsequent studies that use panel data covering the period between 1992 and 2004. An investigation was done to compare developed countries and developing countries. Results indicate that physical units are positively and significantly related to economic growth. Furthermore there was an interesting finding that the output elasticity with respect to physical units for developed countries is higher than developing countries.
Resumo:
In this paper we investigate how attitudes to health and exercise in connection with cycling influence the estimation of values of travel time savings in different kinds of bicycle environments (mixed traffic, bicycle lane in the road way, bicycle path next to the road, and bicycle path not in connection with the road). The results, based on two Swedish stated choice studies, suggest that the values of travel time savings are lower when cycling in better conditions. Surprisingly, the respondents do not consider cycling on a path next to the road worse than cycling on a path not in connection to the road, indicating that they do not take traffic noise and air pollution into account in their decision to cycle. No difference can be found between cycling on a road way (mixed traffic) and cycling in a bicycle lane in the road way. The results also indicate that respondents that include health aspects in their choice to cycle have lower value of travel time savings for cycling than respondents that state that health aspects are of less importance, at least when cycling on a bicycle path. The appraisals of travel time savings regarding cycling also differ a lot depending on the respondents’ alternative travel mode. The individuals who stated that they will take the car if they do not cycle have a much higher valuation of travel time savings than the persons stating public transport as the main alternative to cycling.