981 resultados para Soil acidity--New Jersey--Camden County--Maps.
Resumo:
The potentially responsible parties (PRPs) have removed the beaver dams and have collected the sediment samples they need for treatability studies. The treatability studies will establish the correct silt fence to minimize releases of sediment during the actual dredging to occur this fall. The studies will also determine the types and amounts of materials (lime, kiln dust, fly ash, etc.) required to stabilize the sediment, chemically tie up the metals and insure the sediment mixture will bear the weight of the cap on the Interim Storage Cell where the sediment will be placed. The Illinois Environmental Protection Agency (Illinois EPA) anticipates work to be completed by late fall or early winter 2004, if lake and river levels that affect the South Ditch are at their normal seasonal levels.
Resumo:
"September 2003."
Resumo:
Mode of access: Internet.
Resumo:
Vols. for 1867-1915 include report of the state director of the United New Jersey Railroad and Canal Company issued through 1878 under its earlier names: 1867-71, Delaware and Raritan Canal and Camden and Amboy Railroad and Transportation Companies (which continues the reports of the State Directors); 1873-78, United Rail Road and Canal Company of New Jersey.
Resumo:
Scale ca. 1:650,000.
Resumo:
Scale 1:500,000; 1 in. equals approx. 8 miles.
Resumo:
Scale 1:500,000; 1 in. equals approx. 8 miles.
Resumo:
Scale 1:500,000; 1 in. equals approx. 8 miles.
Resumo:
Shows stages and operations undertaken in revising the New Jersey state base map.
Resumo:
Scales vary.
Resumo:
Panel title.
Resumo:
Scale ca. 1:538,560; 1 in. represents approx. 8.5 miles.
Resumo:
Scale ca. 1:538,560; 1 in. represents approx. 8.5 miles.
Resumo:
Scale ca. 1:130,000.
Resumo:
Scale ca. 1:130,000.