Update : New Jersey Zinc/Mobil Chemical Superfund Site, DePue, Illinois = U ltimos acontecimientos : Sitio Superfund New Jersey Zinc/Mobil Chemical, Depue, Illinois.


Autoria(s): Viacom International.; Exxon Mobil Corporation.; Horsehead Industries.; Illinois. Environmental Protection Agency. Office of Community Relations.
Data(s)

28/12/2024

Resumo

The potentially responsible parties (PRPs) have removed the beaver dams and have collected the sediment samples they need for treatability studies. The treatability studies will establish the correct silt fence to minimize releases of sediment during the actual dredging to occur this fall. The studies will also determine the types and amounts of materials (lime, kiln dust, fly ash, etc.) required to stabilize the sediment, chemically tie up the metals and insure the sediment mixture will bear the weight of the cap on the Interim Storage Cell where the sediment will be placed. The Illinois Environmental Protection Agency (Illinois EPA) anticipates work to be completed by late fall or early winter 2004, if lake and river levels that affect the South Ditch are at their normal seasonal levels.

In English and Spanish.

"Versio n en espan ol al reve s."

"The PRPs for this site are Horsehead Industries, Inc., Exxon Mobil Corporation and Viacom International Inc."

"July 2004."

Caption title.

Includes bibliographical references (p. 5-6).

The potentially responsible parties (PRPs) have removed the beaver dams and have collected the sediment samples they need for treatability studies. The treatability studies will establish the correct silt fence to minimize releases of sediment during the actual dredging to occur this fall. The studies will also determine the types and amounts of materials (lime, kiln dust, fly ash, etc.) required to stabilize the sediment, chemically tie up the metals and insure the sediment mixture will bear the weight of the cap on the Interim Storage Cell where the sediment will be placed. The Illinois Environmental Protection Agency (Illinois EPA) anticipates work to be completed by late fall or early winter 2004, if lake and river levels that affect the South Ditch are at their normal seasonal levels.

Mode of access: Internet.

Formato

con

Identificador

http://hdl.handle.net/2027/uiug.30112055143660

Idioma(s)

eng

Publicador

Springfield, Ill. : Illinois Environmental Protection Agency, Office of Community Relations,

Direitos

Items in this record are available as Creative Commons Attribution. View access and use profile at http://www.hathitrust.org/access_use#cc-by-4.0. Please see individual items for rights and use statements.

Palavras-Chave #New Jersey Zinc/Mobil Chemical Superfund Project #Soil pollution #Factory and trade waste #Soil remediation #Hazardous waste site remediation #Metal wastes #Silt #Sediments (Geology) #Sediments (Geology)
Tipo

text