999 resultados para Project valuation
Resumo:
This study is part of the STRIP study, which is a long-term, randomized controlled trial, designed to decrease the exposure of children in the intervention group (n=540) to known risk factors of atherosclerosis. The main focus of the intervention was the quality of dietary fat. The control group (n=522) did not receive any individualized counselling. Food consumption was evaluated with food records, and blood samples were drawn and growth was measured regularly for all participating children from 13 months to 9 years. A subsample of 66 children participated in a dental health survey. The number of studies on children’s carbohydrate intake, especially fibre intake, is insufficient. The current international recommendations for fibre intake in children are based on average assumptions and data extrapolated from intakes in adults and intake recommendations for adults. Finnish nutrition recommendations lack strict recommendations for dietary fibre in children. Due to fibre’s high bulk volume, excessive dietary fibre is considered to decrease energy density and hence it may have an adverse effect on growth. If fats are reduced from the diet, the low-fat diet may become high in sucrose. Therefore, especially in the STRIP study, it is important to determine the use of fibre and sucrose in children and possible associations with growth and nutrition as well as dental health. The results of the present study indicate that a high fibre intake does not displace energy or disturb growth in children and that children with high fibre intake have better quality of diet than those with low fibre intake. Additionally, dietary fibre intake associated inversely with serum cholesterol concentration. Other carbohydrates also affected serum lipid levels as well, since total carbohydrates, sucrose, and fructose increased serum triglyceride concentration. Total carbohydrate intake reduced HDL cholesterol concentration only in children with apoE3 or apoE4 phenotype. Over the period from the 1970s to the 1990s the dental health of children in Finland has substantially improved despite an increase in sucrose intake. The improvement was thought to be due to improved dental hygiene and the use of fluorine. However, during the past twenty years improvement in dental health has stopped. The present study showed that high long-term sugar intake increases risk of caries in children. High intake of sugar had also negative effects on the diet of children, because it worsens dietary quality by displacing essential nutrients. Furthermore, the quality of dietary fat was worse in children with high sucrose intake. In this study the children’s high sucrose intake was not associated with overweight, but interestingly, it associated inversely with growth.
Resumo:
Abstrakti
Resumo:
O objetivo do trabalho foi testar o modelo WEPP (Water Erosion Prediction Project), através de comparações entre volume de enxurrada e perda de solo observados experimentalmente, provenientes dos segmentos de estradas florestais submetidas à chuva natural com inclinações de 1 e 7% e comprimentos de rampa de 20 e 40 m, e aqueles preditos pelo aplicativo, visando o desenvolvimento de um modelo brasileiro de predição de erosão em estradas florestais. Na determinação da quantidade do material erodido foram instalados tambores coletores, com capacidade de 209,25 litros, localizados na parte inferior das estradas, onde foram inseridas tubulações de PVC de 2 polegadas para coleta dos sedimentos provenientes da estrada propriamente dita. Nos tambores coletores foram feitos orifícios nivelados e perfeitamente iguais, posicionados a 0,65 m do fundo do primeiro e a 0,60 m do fundo do segundo, que funcionaram como um divisor Geib. Nas parcelas de 20 e 40 m de comprimento foram feitos cinco e sete orifícios, respectivamente, no primeiro e segundo tambores. O terceiro tambor foi utilizado para coletar o excedente da enxurrada proveniente do segundo tambor. Os tambores foram ligados em série, através de cano PVC de 2 polegadas. Os dados de volume e intensidade de precipitação diária foram obtidos com a instalação de pluviômetro e pluviógrafo no local. O período de coleta de dados foi de um ano, concentrando-se na época das chuvas. Posteriormente, os arquivos de clima, precipitação, solo, inclinação e comprimento do segmento foram introduzidos e adaptados ao modelo de predição de erosão WEPP com o propósito de testá-lo, visando a confecção de um modelo apropriado às condições brasileiras.
Resumo:
This research focuses on the link between quantitative sustainability disclosure and information asymmetry. It builds upon previous research which links information asymmetry with voluntary disclosure. Stakeholders from the financial services sector claim that sustainability disclosure needs to be more numerical and comparable between companies. This research covers 111 firms from Denmark, Finland, the Netherlands and Sweden from non-service industries and studies how quantitative their sustainability disclosure is, and whether or not there is a negative relation with information asymmetry. The results support the hypotheses, where two out of three information asymmetry proxies have a significant negative relation with quantitative disclosure. Size is supported as a moderating factor. Quantitativity also proves to have a significant link with third party sustainability ratings. The direct link between quantitativity and cost of capital is not however supported.
Resumo:
In this report, we summarize results of our part of the ÄLYKOP-project on customer value creation in the intersection of the health care, ICT, forest and energy industries. The research directs to describe how industry transformation and convergence create new possibilities, business opportunities and even new industries.The report consists of findings which are presented former in academic publications. The publication discusses on customer value, service provision and resource basis of the novel concepts through multiple theorethical frameworks. The report is divided into three maim sections which are theoretical background, discussion on health care industry and evaluations regarding novel smart home concepts. Transaction cost economics and Resource- Based view on the firm provides the theoretical basis to analyze the prescribed phenomena. The health care industry analysis describes the most important changes in the demand conditions of health care services, and explores the features that are likely to open new business opportunities for a solution provider. The third part of the report on the smart home business provides illustrations few potential concepts that can be considered to provide solutions to economical problems which arise from aging of population. The results provide several recommendations for the smart home platform developers in public and private sectors. By the analysis, public organizations dominate service provision and private markets are emergent state at present. We argue that public-private partnerships are nececssary for creating key suppliers. Indeed, paying attion on appropriate regulation, service specifications and technology standards would foster diffusion of new services. The dynamics of the service provision networks is driven by need for new capabiltities which are required for adapting business concepts to new competitive situation. Finally, the smart home framework revealed links between conventionally distant business areas such as health care and energy distribution. The platform integrates functionalities different for purposes which however apply same resource basis.
Resumo:
The aim of this study is to develop a suitable project control procedure for a target company that can be used in engineering, procurement, and construction or con-struction management contracts. This procedure contains suitable project control software and a model for the use of the software in practice. This study is divided into two main sections. Theoretical part deals with project management, focusing on cost and time dimensions in projects. Empirical part deals with the development of the project control procedure for the target compa-ny. This development takes place in two parts. In the first part, semi-structured interviews are used to find out the company’s employees’ demands and desires for the project control software which will then be used in the developed procedure. These demands and desires are compared to available software in the market and the most suitable one will be chosen. Interview results show that important factors are cost tracking, integration with other software, English language availability, references, helpdesk, and no need for regular updates. The most suitable one is CMPro5 cost control software. The chosen software is used in a pilot project, where its functions and use are analyzed. Project control procedure which will be used in the future is developed based on these procedures. The five steps in developed procedure include employment of a cost engineer, whose task is to maintain the procedure in the target company.
Resumo:
This thesis focuses on integration in project business, i.e. how projectbased companies organize their product and process structures when they deliver industrial solutions to their customers. The customers that invest in these solutions run their businesses in different geographical, political and economical environments, which should be acknowledged by the supplier when providing solutions comprising of larger and more complex scopes than previously supplied to these customers. This means that the suppliers are increasing their supply range by taking over some of the activities in the value chain that have traditionally been handled by the customer. In order to be able to provide the functioning solutions, including more engineering hours, technical equipment and a wider project network, a change is needed in the mindset in order to be able to carry out and take the required responsibility that these new approaches bring. For the supplier it is important to be able to integrate technical products, systems and services, but the supplier also needs to have the capabilities to integrate the cross-functional organizations and departments in the project network, the knowledge and information between and within these organizations and departments, along with inputs from the customer into the product and process structures during the lifecycle of the project under development. Hence, the main objective of this thesis is to explore the challenges of integration that industrial projects meet, and based on that, to suggest a concept of how to manage integration in project business by making use of integration mechanisms. Integration is considered the essential process for accomplishing an industrial project, whereas the accomplishment of the industrial project is considered to be the result of the integration. The thesis consists of an extended summary and four papers, that are based on three studies in which integration mechanisms for value creation in industrial project networks and the management of integration in project business have been explored. The research is based on an inductive approach where in particular the design, commissioning and operations functions of industrial projects have been studied, addressing entire project life-cycles. The studies have been conducted in the shipbuilding and power generation industries where the scopes of supply consist of stand-alone equipment, equipment and engineering, and turnkey solutions. These industrial solutions include demanding efforts in engineering and organization. Addressing the calls for more studies on the evolving value chains of integrated solutions, mechanisms for inter- and intra-organizational integration and subsequent value creation in project networks have been explored. The research results in thirteen integration mechanisms and a typology for integration is proposed. Managing integration consists of integrating the project network (the supplier and the sub-suppliers) and the customer (the customer’s business purpose, operations environment and the end-user) into the project by making use of integration mechanisms. The findings bring new insight into research on industrial project business by proposing integration of technology and engineering related elements with elements related to customer oriented business performance in contemporary project environments. Thirteen mechanisms for combining products and the processes needed to deliver projects are described and categorized according to the impact that they have on the management of knowledge and information. These mechanisms directly relate to the performance of the supplier, and consequently to the functioning of the solution that the project provides. This thesis offers ways to promote integration of knowledge and information during the lifecycle of industrial projects, enhancing the development towards innovative solutions in project business.
Resumo:
The management of port-related supply chains is challenging due to the complex and heterogeneous operations of the ports with several actors and processes. That is why the importance of information sharing is emphasised in the ports. However, the information exchange between different port-related actors is often cumbersome and it still involves a lot of manual work and paper. Major ports and port-related actors usually have advanced information systems in daily use but these systems are seldom interoperable with each other, which prevents economies of scale to be reached. Smaller ports and companies might not be equipped with electronic data transmission at all. This is the final report of the Mobile port (MOPO) project, which has sought ways to improve the management and control of port-related sea and inland traffic with the aid of ICT technologies. The project has studied port community systems (PCS) used worldwide, evaluated the suitability of a PCS for the Finnish port operating environment and created a pilot solution of a Finnish PCS in the port of HaminaKotka. Further, the dry port concept and its influences on the transportation system have been explored. The Mobile Port project comprised of several literature reviews, interviews of over 50 port-related logistics and/or ICT professionals, two different kinds of simulation models as well as designing and implementing of the pilot solution of the Finnish PCS. The results of these multiple studies are summarised in this report. Furthermore, recommendations for future actions and the topics for further studies are addressed in the report. The study revealed that the information sharing in a typical Finnish port-related supply chain contains several bottlenecks that cause delays in shipments and waste resources. The study showed that many of these bottlenecks could be solved by building a port community system for the Finnish port community. Almost 30 different kinds of potential services or service entities of a Finnish PCS were found out during the study. The basic requirements, structure, interfaces and operation model of the Finnish PCS were also defined in the study. On the basis of the results of the study, a pilot solution of the Finnish PCS was implemented in the port of HaminaKotka. The pilot solution includes a Portconnect portal for the Finnish port community system (available at https://www.portconnect.fi) and two pilot applications, which are a service for handling the information flows concerning the movements of railway wagons and a service for handling the information flows between Finnish ports and Finland-Russian border. The study also showed that port community systems can be used to improve the environmental aspects of logistics in two different ways: 1) PCSs can bring direct environmental benefits and 2) PCSs can be used as an environmental tool in a port community. On the basis of the study, the development of the Finnish port community system should be continued by surveying other potential applications for the Finnish PCS. It is also important to study if there is need and resources to extend the Finnish PCS to operate in several ports or even on a national level. In the long run, it could be reasonable to clarify whether there would be possibilities to connect the Finnish PCS as a part of Baltic Sea wide, European-wide or even worldwide maritime and port-related network in order to get the best benefit from the system
Resumo:
The thesis combines valuation and behavioral economics literature, which is not common among the Finnish management accounting research. Furthermore, the valuation is studied in biotechnology context and those type of studies are rather rare as well. The thesis studies the valuation in the Finnish biotechnology industry. The concepts of behavioral finance are employed in the empirical part of the study to explore decision-makers’ behavior in valuation processes. The main interest of this study is to explore how subjectivity of a decision-maker affects the valuation in the biotechnology industry. The valuation is studied from two perspectives. First, what is the best valuation model for biotechnology companies suggested by the valuation literature? Second, how the valuation in biotechnology industry is done in practice and how the decision-makers subjectivity affects the valuation? The literature review aims at seeking the best valuation model. The real options were found to be the most suitable valuation model for biotechnology companies, especially in the early stages of product development. The real option’s ability to take the value of the inherent options into account results in theoretically most correct valuations. The only disadvantage is the model’s complexity when compared to other models, such as discounted cash flow models. The empirical part of the study consists of a case study, which examines the valuation practices of the Finnish biotechnology companies. When it comes to the valuation models used in practice, it was found that the companies were using rather simple valuation models, which was due to two reasons. First, the interviewees did not believe in the valuation models and second, they were familiar neither with the most sophisticated models nor with all the theoretical aspects of the models they were using. The material for the study was collected with theme interviews. Four CEO’s of highly successful Finnish biotechnology companies. Strong signs of the decision-makers’ subjectivity in valuation were observed. Most obvious were the signs of framing. Furthermore, herding, excessive optimism, and overconfidence were present. All the behavioral concepts observed most likely have a severe effect on the valuation. As a result, the valuation can easily become overly optimistic, which leads to overvalued investments and to continuation of already unprofitable projects. Framing had the strongest evidence. If the product being valued is framed successfully, the risk of overvaluation is high, thus a strong belief can justify almost any value.
Resumo:
This thesis discusses adaption of new project management tool at ABB Oy Motors and Generators business unit, Synchronous Machines profit centre. Thesis studies project modeling in general and buries in the Gate Model used at ABB Synchronous Machines. It is essential to understand Gate Model because this new project management tool, called Project Master Document, is created on the base of the existing project model. Thesis also analyzes goals and structure of Project Master Document in order to ease implementation of this new tool. Project Master Document aims to improved customer order fulfillment by clearing order handover interface. Office process, especially responsibilities and target dates, become also clearer after Master Document implementation. The document is built to be frame for whole order fulfillment process including check points for each gate of project model and updated memos from all project meetings. Furthermore, project progress will be clearly stated by status markings and visualized with colors.
Resumo:
This Master´s thesis illustrates how growing a business ties up the company´s working capital and what the cost of committed capital. In order to manage a company´s working capital in rapid business growth phase, the thesis suggests that by monitoring and managing the operating and cash conversion cycles of customers´ projects, a company can find ways to secure the required amount of capital. The research method of this thesis was based on literature reviews and case study research. The theoretical review presents the concepts of working capital and provides the background for understanding how to improve working capital management. The company in subject is a global small and medium-sized enterprise that manufactures pumps and valves for demanding process conditions. The company is expanding, which creates lots of challenges. This thesis concentrates to the company´s working capital management and its efficiency through the supply chain and value chain perspective. The main elements of working capital management are inventory management, accounts receivable management and accounts payable management. Prepayments also play a significant role, particularly in project-based businesses. Developing companies´ working capital management requires knowledge from different kind of key operations´ in the company, like purchasing, production, sales, logistics and financing. The perspective to develop and describe working capital management is an operational. After literature reviews the thesis present pilot projects that formed the basis of a model to monitor working capital in the case company. Based on analysis and pilot projects, the thesis introduces a rough model for monitoring capital commitments in short time period. With the model the company can more efficiently monitor and manage their customer projects.
Resumo:
According to several surveys and observations, the percentage of successfully conducted IT projects without over-budgeting and delays in time schedule are extremely low. Many projects also are evaluated as failures in terms of delivered functionality. Nuldén (1996) compares IT projects with bad movies; after watching for 2 hours, one still tries to finish it even though one understands that it is a complete waste of time. The argument for that is 'I've already invested too much time to terminate it now'. The same happens with IT projects: sometimes the company continues wasting money on these projects for a long time, even though there are no expected benefits from these projects. Eventually these projects are terminated anyway, but until this moment, the company spends a lot. The situation described above is a consequence of “escalation of commitment” - project continuation even after a manager receives negative feedback of the project’s success probability. According to Keil and Mähring (2010), even though escalation can occur in any type of project, it is more common among complex technological projects, such as IT projects. Escalation of commitment very often results in runaway projects. In order to avoid it, managers use de-escalation strategies, which allow the resources to be used in more effective. These strategies lead to project termination or turning around, which stops the flow of wasted investments. Numbers of researches explore escalation of commitment phenomena based on experiments and business cases. Moreover, during the last decade several frameworks were proposed for de-escalation strategy. However, there is no evidence of successful implementation of the de-escalation of commitment strategy in the literature. In addition, despite that fact that IT project management methodologies are widely used in the companies, none of them cover the topic of escalation of commitment risks. At the same time, there are no researches proposing the way to implement de-escalation of commitment strategy into the existing project management methodology The research is focused on a single case of large ERP implementation project by the consulting company. Hence, the main deliverables of the study include suggestions of improvement in de-escalation methods and techniques in the project and in the company. Moreover, the way to implement these methods into existing project management methodology and into the company general policies is found.