999 resultados para Buick Motor Company
Resumo:
We have studied the motor abilities and associative learning capabilities of adult mice placed in different enriched environments. Three-month-old animals were maintained for a month alone (AL), alone in a physically enriched environment (PHY), and, finally, in groups in the absence (SO) or presence (SOPHY) of an enriched environment. The animals' capabilities were subsequently checked in the rotarod test, and for classical and instrumental learning. The PHY and SOPHY groups presented better performances in the rotarod test and in the acquisition of the instrumental learning task. In contrast, no significant differences between groups were observed for classical eyeblink conditioning. The four groups presented similar increases in the strength of field EPSPs (fEPSPs) evoked at the hippocampal CA3-CA1 synapse across classical conditioning sessions, with no significant differences between groups. These trained animals were pulse-injected with bromodeoxyuridine (BrdU) to determine hippocampal neurogenesis. No significant differences were found in the number of NeuN/BrdU double-labeled neurons. We repeated the same BrdU study in one-month-old mice raised for an additional month in the above-mentioned four different environments. These animals were not submitted to rotarod or conditioned tests. Non-trained PHY and SOPHY groups presented more neurogenesis than the other two groups. Thus, neurogenesis seems to be related to physical enrichment at early ages, but not to learning acquisition in adult mice.
Resumo:
In humans, action errors and perceptual novelty elicit activity in a shared frontostriatal brain network, allowing them to adapt their ongoing behavior to such unexpected action outcomes. Healthy and pathologic aging reduces the integrity of white matter pathways that connect individual hubs of such networks and can impair the associated cognitive functions. Here, we investigated whether structural disconnection within this network because of small-vessel disease impairs the neural processes that subserve motor slowing after errors and novelty (post-error slowing, PES; post-novel slowing, PNS). Participants with intact frontostriatal circuitry showed increased right-lateralized beta-band (12-24 Hz) synchrony between frontocentral and frontolateral electrode sites in the electroencephalogram after errors and novelty, indexing increased neural communication. Importantly, this synchrony correlated with PES and PNS across participants. Furthermore, such synchrony was reduced in participants with frontostriatal white matter damage, in line with reduced PES and PNS. The results demonstrate that behavioral change after errors and novelty result from coordinated neural activity across a frontostriatal brain network and that such cognitive control is impaired by reduced white matter integrity.
Resumo:
INTRODUCTION: Cerebral palsy (CP) is the most common physical disability in childhood. It is a disorder resulting from sensory and motor impairments due to perinatal brain injury, with lifetime consequences that range from poor adaptive and social function to communication and emotional disturbances. Infants with CP have a fundamental disadvantage in recovering motor function: they do not receive accurate sensory feedback from their movements, leading to developmental disregard. Constraint-induced movement therapy (CIMT) is one of the few effective neurorehabilitative strategies shown to improve upper extremity motor function in adults and older children with CP, potentially overcoming developmental disregard. METHODS AND ANALYSIS: This study is a randomised controlled trial of children 12-24 months corrected age studying the effectiveness of CIMT combined with motor and sensory-motor interventions. The study population will comprise 72 children with CP and 144 typically developing children for a total of N=216 children. All children with CP, regardless of group allocation will continue with their standard of care occupational and physical therapy throughout the study. The research material collected will be in the form of data from high-density array event-related potential scan, standardised assessment scores and motion analysis scores. ETHICS AND DISSEMINATION: The study protocol was approved by the Institutional Review Board. The findings of the trial will be disseminated through peer-reviewed journals and scientific conferences. TRIAL REGISTRATION NUMBER: NCT02567630.
Resumo:
We report an experiment where participants observed an attack on their virtual body as experienced in an immersive virtual reality (IVR) system. Participants sat by a table with their right hand resting upon it. In IVR, they saw a virtual table that was registered with the real one, and they had a virtual body that substituted their real body seen from a first person perspective. The virtual right hand was collocated with their real right hand. Event-related brain potentials were recorded in two conditions, one where the participant"s virtual hand was attacked with a knife and a control condition where the knife only struck the virtual table. Significantly greater P450 potentials were obtained in the attack condition confirming our expectations that participants had a strong illusion of the virtual hand being their own, which was also strongly supported by questionnaire responses. Higher levels of subjective virtual hand ownership correlated with larger P450 amplitudes. Mu-rhythm event-related desynchronization in the motor cortex and readiness potential (C3-C4) negativity were clearly observed when the virtual hand was threatened as would be expected, if the real hand was threatened and the participant tried to avoid harm. Our results support the idea that event-related potentials may provide a promising non-subjective measure of virtual embodiment. They also support previous experiments on pain observation and are placed into context of similar experiments and studies of body perception and body ownership within cognitive neuroscience.
Resumo:
We report an experiment where participants observed an attack on their virtual body as experienced in an immersive virtual reality (IVR) system. Participants sat by a table with their right hand resting upon it. In IVR, they saw a virtual table that was registered with the real one, and they had a virtual body that substituted their real body seen from a first person perspective. The virtual right hand was collocated with their real right hand. Event-related brain potentials were recorded in two conditions, one where the participant"s virtual hand was attacked with a knife and a control condition where the knife only struck the virtual table. Significantly greater P450 potentials were obtained in the attack condition confirming our expectations that participants had a strong illusion of the virtual hand being their own, which was also strongly supported by questionnaire responses. Higher levels of subjective virtual hand ownership correlated with larger P450 amplitudes. Mu-rhythm event-related desynchronization in the motor cortex and readiness potential (C3-C4) negativity were clearly observed when the virtual hand was threatened as would be expected, if the real hand was threatened and the participant tried to avoid harm. Our results support the idea that event-related potentials may provide a promising non-subjective measure of virtual embodiment. They also support previous experiments on pain observation and are placed into context of similar experiments and studies of body perception and body ownership within cognitive neuroscience.
Resumo:
The work aims to analyze the possibilities of utilizing old crane driving AC induction motors in modern pulse-width-modulated variable frequency drives. Bearing currents and voltage stresses are the two main problems associated with modern IGBT inverters, and they may cause premature failure of an old induction motor. The origins of these two problems are studied. An analysis of the mechanism of bearing failure is proposed. Certain types of bearing currents are considered in detail. The most effective and economical means are chosen for bearing currents mitigation. Transient phenomena of cables and mechanism of over voltages occurring at motor terminals are studied in the work. The weakest places of the stator winding insulation system are shown and recommendations are given considering the mitigation of voltage stresses. Only the most appropriate and cost effective preventative methods are chosen for old motor drives. Rewinding of old motors is also considered.
Resumo:
Bodily injury claims have the greatest impact on the claim costs of motor insurance companies. The disability severity of motor claims is assessed in numerous European countries by means of score systems. In this paper a zero inflated generalized Poisson regression model is implemented to estimate the disability severity score of victims in-volved in motor accidents on Spanish roads. We show that the injury severity estimates may be automatically converted into financial terms by insurers at any point of the claim handling process. As such, the methodology described may be used by motor insurers operating in the Spanish market to monitor the size of bodily injury claims. By using insurance data, various applications are presented in which the score estimate of disability severity is of value to insurers, either for computing the claim compensation or for claim reserve purposes.
Resumo:
Data transmission between an electric motor and a frequency converter is required in variablespeed electric drives because of sensors installed at the motor. Sensor information can be used for various useful applications to improve the system reliability and its properties. Traditionally, the communication medium is implemented by an additional cabling. However, the costs of the traditional method may be an obstacle to the wider application of data transmission between a motor and a frequency converter. In any case, a power cable is always installed between a motor and a frequency converter for power supply, and hence it may be applied as a communication medium for sensor level data. This thesis considers power line communication (PLC) in inverter-fed motor power cables. The motor cable is studied as a communication channel in the frequency band of 100 kHz−30 MHz. The communication channel and noise characteristics are described. All the individual components included in a variable-speed electric drive are presented in detail. A channel model is developed, and it is verified by measurements. A theoretical channel information capacity analysis is carried out to estimate the opportunities of a communication medium. Suitable communication and forward error correction (FEC) methods are suggested. A general method to implement a broadband and Ethernet-based communication medium between a motor and a frequency converter is proposed. A coupling interface is also developed that allows to install the communication device safely to a three-phase inverter-fed motor power cable. Practical tests are carried out, and the results are analyzed. Possible applications for the proposed method are presented. A speed feedback motor control application is verified in detail by simulations and laboratory tests because of restrictions for the delay in the feedback loop caused by PLC. Other possible applications are discussed at a more general level.
Resumo:
The objective of this study was to examine how the customers of Larox Flowsys value environmental issues and how environmental issues affect their purchasing behaviour. A comparison between Larox peristaltic pumps and competing pump brands and types was also made in order to find out whether LPP pumps possess some more environmentally beneficial features that other pumps do not have. Finally, if the answers to the first two research questions show that a need for a new marketing message does exist, then the final stage is to select the most appropriate environmental arguments for Larox Flowsys. The empirical data in the study was collected from several different sources, but the main sources were the customer interviews and the outsourced market research. The data was analysed mainly by using content analysis, but theme formation and quantification were also utilized. The results showed that the customers do not consider environmental issues as a main purchasing criterion, but they may well be the criterion that differentiates the product from competing ones. The comparison proved that LPP pumps do possess some significant environmental benefits over competing pumps and therefore, the prerequisite for the use of environmental arguments exists. The final stage in the study was to select the proper environmental arguments for Larox Flowsys.
Resumo:
The objective of the thesis is to enhance the understanding about the management of the front end phases of the innovation process in a networked environment. The thesis approaches the front end of innovation from three perspectives, including the strategy, processes and systems of innovation. The purpose of the use of different perspectives in the thesis is that of providing an extensive systemic view of the front end, and uncovering the complex nature of innovation management. The context of the research is the networked operating environment of firms. The unit of analysis is the firm itself or its innovation processes, which means that this research approaches the innovation networks from the point of view of a firm. The strategy perspective of the thesis emphasises the importance of purposeful innovation management, the innovation strategy of firms. The role of innovation processes is critical in carrying out innovation strategies in practice, supporting the development of organizational routines for innovation, and driving the strategic renewal of companies. The primary focus of the thesis from systems perspective is on idea management systems, which are defined as a part of innovation management systems, and defined for this thesis as any working combination of methodology and tools (manual or IT-supported) that enhance the management of innovations within their early phases. The main contribution of the thesis are the managerial frameworks developed for managing the front end of innovation, which purposefully “wire” the front end of innovation into the strategy and business processes of a firm. The thesis contributes to modern innovation management by connecting the internal and external collaboration networks as foundational elements for successful management of the early phases of innovation processes in a dynamic environment. The innovation capability of a firm is largely defined by its ability to rely on and make use of internal and external collaboration already during the front end activities, which by definition include opportunity identification and analysis, idea generation, profileration and selection, and concept definition. More specifically, coordination of the interfaces between these activities, and between the internal and external innovation environments of a firm is emphasised. The role of information systems, in particular idea management systems, is to support and delineate the innovation-oriented behaviour and interaction of individuals and organizations during front end activities. The findings and frameworks developed in the thesis can be used by companies for purposeful promotion of their front end processes. The thesis provides a systemic strategy framework for managing the front end of innovation – not as a separate process, but as an elemental bundle ofactivities that is closely linked to the overall innovation process and strategy of a firm in a distributed environment. The theoretical contribution of the thesis relies on the advancement of the open innovation paradigm in the strategic context of a firm within its internal and external innovation environments. This thesis applies the constructive research approach and case study methodology to provide theoretically significant results, which are also practically beneficial.
Resumo:
Sales configurators are essential tools for companies that offer complicated case specifically crafted products for customers. Most sophisticated of them are able to design an entire end product on the fly according to given constraints, calculate price for the offer and move the order into production. This thesis covers a sales configurator acquisition project in a large industrial company that offers cranes for its customers. The study spans the preliminary stages of a large-scale software purchase project starting from the specification of problem domain and ending up presenting the most viable software solution that fulfils the requirements for the new system. The project consists of mapping usage environment, use cases, and collecting requirements that are expected from the new system. The collected requirements involve fitting the new sales system into enterprise application infrastructure, mitigating the risks involved in the project and specifying new features to the application whilst preserving all of the admired features of the old sales system currently used in the company. The collected requirements were presented to a number of different sales software vendors who were asked to provide solution suggestions that would fulfil all the demands. All of the received solution proposals were exposed to an evaluation to determine the most feasible solutions, and the construction of evaluation criteria itself was a part of the study. The final outcome of this study is a short-list of the most feasible sales configurator solutions together with a description of how software purchase process in large enterprises work, and which aspects should be paid attention in large projects of similar kind.
Resumo:
The purpose of this Thesis was to study what is the present situation of Business Intelligence of the company unit. This means how efficiently unit uses possibilities of modern information management systems. The aim was to resolve how operative informa-tion management of unit’s tender process could be improved by modern information technology applications. This makes it possible that tender processes could be faster and more efficiency. At the beginning it was essential to acquaint oneself with written literature of Business Intelligence. Based on Business Intelligence theory is was relatively easy but challenging to search and discern how tender business could be improved by methods of Busi-ness Intelligence. The empirical phase of this study was executed as qualitative research method. This phase includes theme and natural interviews on the company. Problems and challenges of tender process were clarified in a part an empirical phase. Group of challenges were founded when studying information management of company unit. Based on theory and interviews, group of improvements were listed which company could possible do in the future when developing its operative processes.
Resumo:
The bachelor’s thesis concentrates on the innovativeness in the construction industry. The purpose of the thesis is to define the innovation as a concept reflected on a context of the construction industry. The second objective is to examine how the construction companies could foster and increase the innovativeness. The third objective was to find out tools, methods and phases of the front-end of the innovation process. The construction industry is often considered as a traditional and an old-fashioned manufacturing industry. The innovation or the innovativeness rarely linked to the construction industry. Productivity is a common problem in the construction industry. The construction industry needs to increase the productivity to compete in a globalized world. The productivity can be increased by the innovation. The thesis based on a literature review. The findings from the literature include a description of the innovation as a concept, the innovative culture and the innovation process as a context of the construction industry. The phases of the front-end of the innovation process were explained. Customers centered approach was taken into account in the innovation process. The required tools and methods for managing the front-end of the innovation process were illustrated. The thesis ensures the importance of the innovation facing challenges of the construction industry. Managing the front-end of the innovation is the most important aspect to stand out from the less innovative companies. To take a full advantage of the innovation companies cannot fear of changes. The innovation process requires a full support of the top management of the company. Taking into consideration a theoretical aspect of the thesis a further research is required to respond practical needs of the company. Tools and methods should be considered according the company’s needs and activities. Company’s existing state and culture should be examined before implementing the front-end of the innovation process to ensure the functionality.