929 resultados para Process Monitoring
Resumo:
The observing failure and feedback instability might happen when the partial sensors of a satellite attitude control system (SACS) go wrong. A fault diagnosis and isolation (FDI) method based on a fault observer is introduced to detect and isolate the fault sensor at first. Based on the FDI result, the object system state-space equation is transformed and divided into a corresponsive triangular canonical form to decouple the normal subsystem from the fault subsystem. And then the KX fault-tolerant observers of the system in different modes are designed and embedded into online monitoring. The outputs of all KX fault-tolerant observers are selected by the control switch process. That can make sense that the SACS is part-observed and in stable when the partial sensors break down. Simulation results demonstrate the effectiveness and superiority of the proposed method.
Resumo:
Precise identification of the time when a change in a hospital outcome has occurred enables clinical experts to search for a potential special cause more effectively. In this paper, we develop change point estimation methods for survival time of a clinical procedure in the presence of patient mix in a Bayesian framework. We apply Bayesian hierarchical models to formulate the change point where there exists a step change in the mean survival time of patients who underwent cardiac surgery. The data are right censored since the monitoring is conducted over a limited follow-up period. We capture the effect of risk factors prior to the surgery using a Weibull accelerated failure time regression model. Markov Chain Monte Carlo is used to obtain posterior distributions of the change point parameters including location and magnitude of changes and also corresponding probabilistic intervals and inferences. The performance of the Bayesian estimator is investigated through simulations and the result shows that precise estimates can be obtained when they are used in conjunction with the risk-adjusted survival time CUSUM control charts for different magnitude scenarios. The proposed estimator shows a better performance where a longer follow-up period, censoring time, is applied. In comparison with the alternative built-in CUSUM estimator, more accurate and precise estimates are obtained by the Bayesian estimator. These superiorities are enhanced when probability quantification, flexibility and generalizability of the Bayesian change point detection model are also considered.
Resumo:
Public participate in the planning and design of major public infrastructure and construction (PIC) projects is crucial to their success, as the interests of different stakeholders can be systematically captured and built into the finalised scheme. However, public participation may not always yield a mutually acceptable solution, especially when the interests of stakeholders are diverse and conflicting. Confrontations and disputes can arise unless the concerns or needs of the community are carefully analysed and addressed. The aim of the paper is to propose a systematic method of analysing stakeholder concerns relating to PIC projects by examining the degree of consensus and/or conflict involved. The results of a questionnaire survey and a series of interviews with different entities are provided, which indicate the existence of a significant divergence of views among stakeholder groups and that conflicts arise when there is a mismatch between peoples’ perception concerning money and happiness on the one hand and development and damages on the other. Policy and decision-makers should strive to resolve at least the majority of conflicts that arise throughout the lifecycle of major PIC projects so as to maximise their chance of success.
Resumo:
The emergence of semantic technologies to deal with the underlying meaning of things, instead of a purely syntactical representation, has led to new developments in various fields, including business process modeling. Inspired by artificial intelligence research, technologies for semantic Web services have been proposed and extended to process modeling. However, the applicablility of semantic Web services for semantic business processes is limited because business processes encompass wider requirements of business than Web services. In particular, processes are concerned with the composition of tasks, that is, in which order activities are carried out, regardless of their implementation details; resources assigned to carry out tasks, such as machinery, people, and goods; data exchange; and security and compliance concerns.
Resumo:
In this chapter I explore the ways process drama can enrich and enliven the assessment regime of a middle school beginner language program. The chapter draws on five months’ language teaching which I did to collect data during my doctoral research. I taught a secondary co-educational class of 12-13 year olds (first year secondary school) for their German lessons while the teacher who had invited me in observed the lessons. Throughout the project there was an emphasis on student participation through questionnaire, discussion and interview...
Resumo:
All processes are modeled, all process metrics defined, all process support systems are set up; yet still, processes are not running smoothly and departmental silos are more present than ever. Both practitioners and academics tell the same story. A successful business process management (BPM) implementation goes beyond using the right methods and putting the right systems in place. In fact, an important success factor for BPM is establishing the right organizational culture, that is, a culture that supports the achievement and maintenance of efficient and effective business processes.
Resumo:
Sustainability has emerged as a primary context for engineering education in the 21st Century, particularly the sub-discipline of chemical engineering. However, there is confusion over how to go about integrating sustainability knowledge and skills systemically within bachelor degrees. This paper addresses this challenge, using a case study of an Australian chemical engineering degree to highlight important practical considerations for embedding sustainability at the core of the curriculum. The paper begins with context for considering a systematic process for rapid curriculum renewal. The authors then summarise a 2-year federally funded project, which comprised piloting a model for rapid curriculum renewal led by the chemical engineering staff. Model elements contributing to the renewal of this engineering degree and described in this paper include: industry outreach; staff professional development; attribute identification and alignment; program mapping; and curriculum and teaching resource development. Personal reflections on the progress and process of rapid curriculum renewal in sustainability by the authors and participating engineering staff will be presented as a means to discuss and identify methodological improvements, as well as highlight barriers to project implementation. It is hoped that this paper will provide an example of a formalised methodology on which program reform and curriculum renewal for sustainability can be built upon in other higher education institutions.
Resumo:
This year marks the completion of data collection for year three (Wave 3) of the CAUSEE study. This report uses data from the first three years and focuses on the process of learning and adaptation in the business creation process. Most start-ups need to change their business model, their product, their marketing plan, their market or something else about the business to be successful. PayPal changed their product at least five times, moving from handheld security, to enterprise apps, to consumer apps, to a digital wallet, to payments between handhelds before finally stumbling on the model that made the a multi-billion dollar company revolving around email-based payments. PayPal is not alone and anecdotes abounds of start-ups changing direction: Sysmantec started as an artificial intelligence company, Apple started selling plans to build computers and Microsoft tried to peddle compilers before licensing an operating system out of New Mexico. To what extent do Australian new ventures change and adapt as their ideas and business develop? As a longitudinal study, CAUSEE was designed specifically to observe development in the venture creation process. In this research briefing paper, we compare development over time of randomly sampled Nascent Firms (NF) and Young Firms(YF), concentrating on the surviving cases. We also compare NFs with YFs at each yearly interval. The 'high potential' over sample is not used in this report.
Resumo:
A 4-cylinder Ford 2701C test engine was used in this study to explore the impact of ethanol fumigation on gaseous and particle emission concentrations. The fumigation technique delivered vaporised ethanol into the intake manifold of the engine, using an injector, a pump and pressure regulator, a heat exchanger for vaporising ethanol and a separate fuel tank and lines. Gaseous (Nitric oxide (NO), Carbon monoxide (CO) and hydrocarbons (HC)) and particulate emissions (particle mass (PM2.5) and particle number) testing was conducted at intermediate speed (1700 rpm) using 4 load settings with ethanol substitution percentages ranging from 10-40 % (by energy). With ethanol fumigation, NO and PM2.5 emissions were reduced, whereas CO and HC emissions increased considerably and particle number emissions increased at most test settings. It was found that ethanol fumigation reduced the excess air factor for the engine and this led to increased emissions of CO and HC, but decreased emissions of NO. PM2.5 emissions were reduced with ethanol fumigation, as ethanol has a very low “sooting” tendency. This is due to the higher hydrogen-to-carbon ratio of this fuel, and also because ethanol does not contain aromatics, both of which are known soot precursors. The use of a diesel oxidation catalyst (as an after-treatment device) is recommended to achieve a reduction in the four pollutants that are currently regulated for compression ignition engines. The increase in particle number emissions with ethanol fumigation was due to the formation of volatile (organic) particles; consequently, using a diesel oxidation catalyst will also assist in reducing particle number emissions.
Resumo:
Analysing the condition of an asset is a big challenge as there can be many aspects which can contribute to the overall functional reliability of the asset that have to be considered. In this paper we propose a two-step functional and causal relationship diagram (FCRD) to address this problem. In the first step, the FCRD is designed to facilitate the analysis of the condition of an asset by evaluating the interdependence (functional and causal) relationships between different components of the asset with the help of a relationship diagram. This is followed by the advanced FCRD (AFCRD) which refines the information from the FCRD into a comprehensive and manageable format. This new two-step methodology for asset condition monitoring is tested and validated for the case of a water treatment plant. © IMechE 2012.
Resumo:
Retrofit projects are different from newly-built projects in many respects. A retrofit project involves an existing building, which imposes constraints on the owners, designers, operators and constructors throughout the project process. Retrofit projects are risky, complex, less predictable and difficult to be well planned, which need greater coordination. For office building retrofit project, further restrictions will apply as these buildings often locate in CBD areas and most have to remain operational during the progression of project work. Issues such as site space, material storage and handling, noise and dust, need to be considered and well addressed. In this context, waste management is even more challenging with small spaces for waste handling, uncertainties in waste control, and impact of waste management activities on project delivery and building occupants. Current literatures on waste management in office building retrofit projects focus on increasing waste recovery rate based on project planning, monitoring and stakeholders’ collaboration. However, previous research has not produced knowledge of understanding the particular retrofit processes and their impact on waste generation and management. This paper discusses the interim results of a continuing research on new strategies for waste management in office building retrofit projects. Firstly based on the literature review, it summarizes the unique characteristics of office building retrofit projects and their influence on waste management. An assumption on waste management strategies is formed. Semi-structured interviews were conducted towards industry practitioners and findings are then presented in the paper. The assumption of the research was validated in the interviews from the opinions and experiences of the respondents. Finally the research develops a process model for waste management in office building retrofit projects. It introduces two different waste management strategies. For the dismantling phase, waste is generated fast along with the work progress, so integrated planning for project delivery and waste generation is needed in order to organize prompt handling and treatment. For the fit-out phase, the work is similar as new construction. Factors which are particularly linked to generating waste on site need to be controlled and monitored. Continuing research in this space will help improve the practice of waste management in office building retrofit projects. The new strategies will help promote the practicality of project waste planning and management and stakeholders’ capability of coordinating waste management and project delivery.
Resumo:
The importance of actively managing and analyzing business processes is acknowledged more than ever in organizations nowadays. Business processes form an essential part of an organization and their ap-plication areas are manifold. Most organizations keep records of various activities that have been carried out for auditing purposes, but they are rarely used for analysis purposes. This paper describes the design and implementation of a process analysis tool that replays, analyzes and visualizes a variety of performance metrics using a process definition and its execution logs. Performing performance analysis on existing and planned process models offers a great way for organizations to detect bottlenecks within their processes and allow them to make more effective process improvement decisions. Our technique is applied to processes modeled in the YAWL language. Execution logs of process instances are compared against the corresponding YAWL process model and replayed in a robust manner, taking into account any noise in the logs. Finally, performance characteristics, obtained from replaying the log in the model, are projected onto the model.
Resumo:
Problems associated with processing whole sugarcane crop can be minimised by removing impurities during the clarification stage. As a first step, it is important to understand the colloidal chemistry of juice particles on a molecular level to assist development strategies for effective clarification performance. This paper presents the composition and surface characteristics of colloidal particles originating from various juice types by using scanning electron microscopy with energy-dispersive X-ray spectroscopy (SEM-EDX), X-ray photoelectron spectroscopy (XPS) and zeta potential measurements. The composition and surface characteristics of colloidal juice particles are reported. The results indicate that there are three types of colloidal particles present viz., an aluminosilicate compound, silica and iron oxide, with the latter two being abundant. Proteins, polysaccharides and organic acids were identified on the surface of particles in juice. The overall particle charge varies from –2 mV to –6 mV. In comparison to juice expressed from burnt cane, the zeta potential values were more negative with juice particles originating from whole crop. This in part explains why these juices are difficult to clarify.
Resumo:
Many governments world-wide are increasingly encouraging the involvement of interested individuals, groups and organisations in their publicinfrastructure and construction (PIC) projects as a means of improving the openness, transparency and accountability of the decision-making process and help improve the projects’ long-term viability and benefits to the community. In China, however, the current participatory mechanism at the project level exists only as part of the environmental impact assessment (EIA) process. With an increasing demand for PIC projects and social equality in China, this suggests a need to bring the participatory process into line with international practice. The aim of this paper, therefore, is to identify the weaknesses of EIA-basedpublicparticipation in China and the means by which it may be improved for the whole lifecycle of PIC schemes. To do this, the results of a series of interviews with a diverse group of experts is reported which analyse the nature and extent of existing problems of publicparticipation in EIA and suggestions for improvement. These indicate that the current level of participation in PIC projects is quite limited, particularly in the crucial earlier stages, primarily due to traditional culture and values, uneven progress in the adoption of participatory mechanisms, the risk of not meeting targets and lack of confidence in public competence. Finally, aprocess flowchart is proposed to guide construction practitioners and the community in general.