793 resultados para information security management system


Relevância:

100.00% 100.00%

Publicador:

Resumo:

A knowledge management tool developed by the GIS Center for to support project reporting tools, project publications, and a project data portal for materials related to the WAWASH Program.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The popularization of software to mitigate Information Security threats can produce an exaggerated notion about its full effectiveness in the elimination of any threat. This situation can result reckless users behavior, increasing vulnerability. Based on behavioral theories, a theoretical model and hypotheses were developed to understand the extent to which human perception of threat, stress, control and disgruntlement can induce responsible behavior. A self-administered questionnaire was created and validated. The data were collected in Brazil, and complementary results regarding similar studies conducted in USA were found. The results show that there is influence of information security orientations provided by organizations in the perception about severity of the threat. The relationship between threat, effort, control and disgruntlement, and the responsible behavior towards information security was verified through linear regression. The contributions also involve relatively new concepts in the field and a new research instrument.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this article is to analyze the theoretical model proposed by [Jabbour CJC, Santos FCA. Relationships between human resource dimensions and environmental management in companies: proposal of a model. Journal of Cleaner Production 2008;16(1):5 1-8.] based on the data collected in four Brazilian companies. This model investigates how the phases of the environmental management system can be linked to human resource practices in order to attain continuous improvement of a company`s environmental performance. Our aim is to contribute to a field, which has little empirical evidence. Although the interaction between the phases of the environmental management system and human resource practices is recommended by the specialized literature [Daily BE Huang S. Achieving sustainability through attention to human resource factors in environmental management. International Journal of Operations and Production Management 2001:21(12):1539-52.], the results indicate that most of the theoretical assumptions could not be confirmed in these Brazilian companies. (C) 2008 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a proposal for a Quality Management System for a generic GNSS Surveying Company as an alternative for management and service quality improvements. As a result of the increased demand for GNSS measurements, a large number of new or restructured companies were established to operate in that market. Considering that GNSS surveying is a new process, some changes must be performed in order to accommodate the old surveying techniques and the old fashioned management to the new reality. This requires a new management model that must be based on a well-described procedure sequence aiming at the Total Management Quality for the company. The proposed Quality Management System was based on the requirements of the Quality System ISO 9000:2000, applied to the whole company, focusing on the productive process of GNSS surveying work.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this study is to characterize how Portuguese Small and Medium Enterprises (SMEs) view the Occupational Health and Safety Management Systems (OHSMSs) certification process, after receiving the Quality Management System (QMS) certification. References were based on the ISO 9001 standard for a QMS and OHSAS 18001 for OHSMS. The method used to evaluate the implemented systems, was by form of questionnaire. Those questioned had to have a certified quality management system, an implemented OHSMS and be a SME. The questionnaire was sent to 300 SMEs; 46 responses were received and validated. Of them, only 12 SMEs had the OHSMS certificate according to OHSAS 18001. Within those 12 companies that participated: 7 SMEs are from the industrial sector; 3 belong to the electricity/telecommunications sector and 2 SMEs are from the trade/services activity sector. The size of the sample was small, but corresponds to Portuguese reality. Moreover, 34 SMEs did not have the OHSMS certificate. The questionnaire requested the main reasons for SMEs to opt for non-certification and it was related with high costs, while the main reasons to certificate were, among others, needed to eliminate or minimize risks to workers. The main benefits that Portuguese SMEs have gained from the referred certifications have been, improved working conditions, ensuring compliance with legislation and better internal communication about risks and hazards. Also presented are the main difficulties in achieving an OHSMS certification including high certification costs, difficulties motivating personnel, difficulties in changing the company’s culture and increased bureaucracy.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

It is known the power of ideas is tremendous. But there are employees in many companies who have good ideas but not put them into practice. On the other hand, there are many others who have good ideas and are encouraged to contribute their ideas for innovation in the company. This study attempts to identify factors that contribute to success in managing ideas and consequent business innovation. The method used was the case study applied to two companies. During the investigation, factors considered essential for the success of an idea management program were identified, of which we highlight, among others, evidences the results, involvement of the top management, establishment of goals and objectives; recognition; dissemination of good results. Companies with these implemented systems, capture the best ideas from their collaborators and apply them internally. This study intends to contribute to business innovation in enterprises through creation and idea management, mainly through collecting the best ideas of their own employees. The results of this study can be used to help improving deployed suggestions systems, as well as, all managers who wish to implement suggestions systems/ideas management systems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper proposes an implementation, based on a multi-agent system, of a management system for automated negotiation of electricity allocation for charging electric vehicles (EVs) and simulates its performance. The widespread existence of charging infrastructures capable of autonomous operation is recognised as a major driver towards the mass adoption of EVs by mobility consumers. Eventually, conflicting requirements from both power grid and EV owners require automated middleman aggregator agents to intermediate all operations, for example, bidding and negotiation, between these parts. Multi-agent systems are designed to provide distributed, modular, coordinated and collaborative management systems; therefore, they seem suitable to address the management of such complex charging infrastructures. Our solution consists in the implementation of virtual agents to be integrated into the management software of a charging infrastructure. We start by modelling the multi-agent architecture using a federated, hierarchical layers setup and as well as the agents' behaviours and interactions. Each of these layers comprises several components, for example, data bases, decision-making and auction mechanisms. The implementation of multi-agent platform and auctions rules, and of models for battery dynamics, is also addressed. Four scenarios were predefined to assess the management system performance under real usage conditions, considering different types of profiles for EVs owners', different infrastructure configurations and usage and different loads on the utility grid (where real data from the concession holder of the Portuguese electricity transmission grid is used). Simulations carried with the four scenarios validate the performance of the modelled system while complying with all the requirements. Although all of these have been performed for one charging station alone, a multi-agent design may in the future be used for the higher level problem of distributing energy among charging stations. Copyright (c) 2014 John Wiley & Sons, Ltd.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Os dispositivos móveis são pessoais, intransmissíveis e cada vez mais utilizados, tornando-se assim numa boa ferramenta para a realização de um conjunto de serviços na indústria hoteleira. Entre esses serviços que necessitam da identificação pessoal, encontram-se a possibilidade do cliente reservar um quarto ou utilizar o serviço de quartos. Atualmente é muito utilizado, nos locais de alojamento, um smart card que possibilite ao cliente ter acesso a alguns dos serviços disponíveis. O objetivo deste documento é apresentar uma alternativa ao sistema de cartões, utilizando para o efeito, dispositivos móveis. De modo a garantir a segurança e uma utilização semelhante ao sistema de cartões existentes foi utilizada a tecnologia NFC (Near Field Communication) que, ao permitir o modo de emulação de cartão, facilita a transação do sistema de smart card existente, para o da utilização de dispositivos móveis na realização das mesmas funções. Mais concretamente, será abordada a utilização de smartphones para o processo de abertura de portas. Para que exista uma melhor compreensão e para que haja um conhecimento das suas capacidades e limites foram estudados casos de uso da tecnologia NFC. Este documento apresenta ainda os processos de desenvolvimento de uma aplicação nativa para o sistema operativo Android, cujo objetivo é proporcionar ao cliente de um local de alojamento um novo modo de acesso ao quarto, utilizando a tecnologia NFC. Para além desta funcionalidade a aplicação permite ainda ao utilizador fazer reservas, fazer o check-in, fazer o check-out entre outras. Posteriormente serão apresentadas as conclusões e possíveis trabalhos futuros.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With the introduction of the electrics cars into the market new technologies regarding the battery are being developed and new problems to be solved, one of them the battery management system because each type of cell requires a specific way of handling. This research is done using the active research method to find out the actual problem on this subject and features a BMS should have, understand how they work and how to develop them applied to the purpose on this work. Once the features the BMS should have are clarified, it’s possible to develop a BMS for an electric racing car. The decisions are made taking into consideration the nature of the vehicle being developed. After the project done it’s clear to see that what was developed was not only the BMS itself but all the other factors around it, such as CAN communication, safety control, diagnostics and so on.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Os modelos de maturidade são instrumentos facilitadores da gestão das organizações, incluindo a gestão da sua função sistemas de informação, não sendo exceção as organizações hospitalares. Neste artigo apresenta-se uma investigação inicial que visa o desenvolvimento de um abrangente modelo de maturidade para a gestão dos sistemas de informação hospitalares. O desenvolvimento deste modelo justifica-se porque os modelos de maturidade atuais no domínio da gestão dos sistemas informação hospitalares ainda se encontram numa fase embrionária de desenvolvimento, sobretudo porque são pouco detalhados, não disponibilizam ferramentas para determinação da maturidade e não apresentam as características dos estágios de maturidade estruturadas por diferentes fatores de influência.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Desde que existe informação, há necessidade de criar um sistema que permita gerir e garantir que a informação está segura e que cumpre os requisitos básicos de segurança. Como tal, é necessário desenvolver técnicas e mecanismos para que os requisitos sejam testados e melhorados continuamente. Com esta necessidade em vista, apareceram padrões que dão resposta a um conjunto vasto de problemas, em diferentes sistemas e aplicações diversas. Estes tornaram-se guias de reflexão para quem os analisava, de arquitetura para quem os implementava e modelos para quem os geria. O padrão ISO 27001 dá resposta aos cuidados a ter para se conseguir um sistema de gestão da segurança da informação eficaz e eficiente. Esta norma preocupa-se com os detalhes de aplicação até à forma como é implementado e arquitetado o sistema. Os processos, atividades, fluxos de trabalho são essenciais para que esta norma seja cumprida. É necessário um bom escrutínio dos processos e suas atividades, assim como um fluxo de trabalho bem definido com papéis e responsabilidades de cada ator. É necessário também assegurar a forma como é gerido, a sua verificação e melhoria contínua. Foi aplicado no ISEP um exercício com o qual se pretendeu verificar se os processos e outros aspetos seguiam estes cuidados e se estavam de acordo com a norma. Durante o exercício foram verificados processos dentro de um certo âmbito, todas as suas atividades, papéis e responsabilidades, verificação de recursos, aplicação de controlos e aplicação de uma análise de risco. Esta análise tem como objetivo verificar o nível de segurança dos recursos, algo que a norma ISO 27001 propõe mas não especifica em que moldes. No final deste exercício pretendeu-se melhorar o sistema de gestão de informação do ISEP em vertentes tais como a documentação, a qual especifica quais os passos realizados no decorrer do mesmo.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A Work Project, presented as part of the requirements for the Award of a Masters Degree in Finance from the NOVA – School of Business and Economics

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The research conducted for this thesis has been carried out over a two year period as part of the Mobile Tools and Technology for customer care (MOTTO) project. The project was funded under the Applied Grant scheme administered by Enterprise Ireland and Nortel Networks Ltd. It was a partnership project between Galway-Mayo Institute of Technology, University of Limerick, National University of Ireland Galway, and a global Internet and communications company, Nortel Networks. The project aimed to investigate the enabling mobile communications technologies in e-Business and mobile communications in the area of Business-to-Business (B2B) customer care. The development of the application discussed in this thesis was developed in conjunction with the Galway-Mayo Institute of Technology, University of Limerick and AMT Ireland. The decision to develop the application in the Electronics Company of AMT in Limerick came about as a result of the contact established by Mark Southern from the University of Limerick. Mark was involved in overseeing the development and assisted in establishing the user requirements.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Quality Management, Integrated Technical Management Systems, ITMS, Technical Elements, Environment, Occupational Health and safety, OH&S, Standards, ISO, General Regulations, Integration, Management Functions, Computer Centre, Suc-cess Concepts, Documentation, PCT, QMS, EMS, OH&S-MS, Portioning, Evaluation, Technical Cycle, Technical Compliance, Framework