886 resultados para Initial costs
Resumo:
Research is now emerging which exposes the significance and extent to which even small shifts in the regulatory assessment period, and other factors, affect housing affordability. It suggests that the extent of its significance has not been hitherto completely demonstrated.
Resumo:
The stylized facts that motivate this thesis include the diversity in growth patterns that are observed across countries during the process of economic development, and the divergence over time in income distributions both within and across countries. This thesis constructs a dynamic general equilibrium model in which technology adoption is costly and agents are heterogeneous in their initial holdings of resources. Given the households‟ resource level, this study examines how adoption costs influence the evolution of household income over time and the timing of transition to more productive technologies. The analytical results of the model constructed here characterize three growth outcomes associated with the technology adoption process depending on productivity differences between the technologies. These are appropriately labeled as „poverty trap‟, „dual economy‟ and „balanced growth‟. The model is then capable of explaining the observed diversity in growth patterns across countries, as well as divergence of incomes over time. Numerical simulations of the model furthermore illustrate features of this transition. They suggest that that differences in adoption costs account for the timing of households‟ decision to switch technology which leads to a disparity in incomes across households in the technology adoption process. Since this determines the timing of complete adoption of the technology within a country, the implications for cross-country income differences are obvious. Moreover, the timing of technology adoption appears to be impacts on patterns of growth of households, which are different across various income groups. The findings also show that, in the presence of costs associated with the adoption of more productive technologies, inequalities of income and wealth may increase over time tending to delay the convergence in income levels. Initial levels of inequalities in the resources also have an impact on the date of complete adoption of more productive technologies. The issue of increasing income inequality in the process of technology adoption opens up another direction for research. Specifically increasing inequality implies that distributive conflicts may emerge during the transitional process with political- economy consequences. The model is therefore extended to include such issues. Without any political considerations, taxes would leads to a reduction in inequality and convergence of incomes across agents. However this process is delayed if politico-economic influences are taken into account. Moreover, the political outcome is sub optimal. This is essentially due to the fact that there is a resistance associated with the complete adoption of the advanced technology.
Resumo:
This study evaluates three versions of the Wayfinding Effectiveness Scale (WES), developed to differentiate problems of wayfinding and wandering behavior of community-residing elders with dementia (EWD), in 266 dyads (EWD and caregiver) recruited from Alzheimer's Association chapters. Factor analyses yield a five-factor solution (explained variance = 62.6%): complex wayfinding goals, analytic strategies, global strategies, simple wayfinding goals, and being stimulus bound. Overall, internal consistencies are high: WES (.94-.95), and subscales are stable across all versions. Testretest reliability is acceptable for the overall WES and two subscales (complex and simple wayfinding goals) for the care recipient current behavior version. Construct validity is supported by the pattern of correlations among subscales and analyses of variance (ANOVAs) showing significant differences among the care recipient (current vs. prior behavior) and caregiver versions overall and for all subscales. Results support the WES as a valid and reliable measure of wayfinding effectiveness in persons with dementia.
Resumo:
Accurate owner budget estimates are critical to the initial decision-to-build process for highway construction projects. However, transportation projects have historically experienced significant construction cost overruns from the time the decision to build has been taken by the owner. This paper addresses the problem of why highway projects overrun their predicted costs. It identifies the owner risk variables that contribute to significant cost overrun and then uses factor analysis, expert elicitation, and the nominal group technique to establish groups of importance ranked owner risks. Stepwise multivariate regression analysis is also used to investigate any correlation of the percentage of cost overrun with risks, together with attributes such as highway project type, indexed cost, geographics location, and project delivery method. The research results indicate a correlation between the reciprocal of project budgets size and percentage cost overrun. This can be useful for owners in determining more realistic decision-to-build highway budget estimates by taking into account the economies of scale associated with larger projects.
Resumo:
With increasing pressure to deliver environmentally friendly and socially responsible highway infrastructure projects, stakeholders are also putting significant focus on the early identification of financial viability and outcomes for these projects. Infrastructure development typically requires major capital input, which may cause serious financial constraints for investors. The push for sustainability has added new dimensions to the evaluation of highway projects, particularly on the cost front. Comprehensive analysis of the cost implications of implementing place sustainable measures in highway infrastructure throughout its lifespan is highly desirable and will become an essential part of the highway development process and a primary concern for decision makers. This paper discusses an ongoing research which seeks to identify cost elements and issues related to sustainable measures for highway infrastructure projects. Through life-cycle costing analysis (LCCA), financial implications of pursuing sustainability, which are highly concerned by the construction stakeholders, have been assessed to aid the decision making when contemplating the design, development and operation of highway infrastructure. An extensive literature review and evaluation of project reports from previous Australian highway projects was first conducted to reveal all potential cost elements. This provided the foundation for a questionnaire survey, which helped identify those specific issues and related costs that project stakeholders consider to be most critical in the Australian industry context. Through the survey, three key stakeholders in highway infrastructure development, namely consultants, contractors and government agencies, provided their views on the specific selection and priority ranking of the various categories. Findings of the survey are being integrated into proven LCCA models for further enhancement. A new LCCA model will be developed to assist the stakeholders to evaluate costs and investment decisions and reach optimum balance between financial viability and sustainability deliverables.
Resumo:
Sustainability has been increasingly recognised as an integral part of highway infrastructure development. In practice however, the fact that financial return is still a project’s top priority for many, environmental aspects tend to be overlooked or considered as a burden, as they add to project costs. Sustainability and its implications have a far-reaching effect on each project over time. Therefore, with highway infrastructure’s long-term life span and huge capital demand, the consideration of environmental cost/ benefit issues is more crucial in life-cycle cost analysis (LCCA). To date, there is little in existing literature studies on viable estimation methods for environmental costs. This situation presents the potential for focused studies on environmental costs and issues in the context of life-cycle cost analysis. This paper discusses a research project which aims to integrate the environmental cost elements and issues into a conceptual framework for life cycle costing analysis for highway projects. Cost elements and issues concerning the environment were first identified through literature. Through questionnaires, these environmental cost elements will be validated by practitioners before their consolidation into the extension of existing and worked models of life-cycle costing analysis (LCCA). A holistic decision support framework is being developed to assist highway infrastructure stakeholders to evaluate their investment decision. This will generate financial returns while maximising environmental benefits and sustainability outcome.
Resumo:
Many of the costs associated with greenfield residential development are apparent and tangible. For example, regulatory fees, government taxes, acquisition costs, selling fees, commissions and others are all relatively easily identified since they represent actual costs incurred at a given point in time. However, identification of holding costs are not always immediately evident since by contrast they characteristically lack visibility. One reason for this is that, for the most part, they are typically assessed over time in an ever-changing environment. In addition, wide variations exist in development pipeline components: they are typically represented from anywhere between a two and over sixteen years time period - even if located within the same geographical region. Determination of the starting and end points, with regards holding cost computation, can also prove problematic. Furthermore, the choice between application of prevailing inflation, or interest rates, or a combination of both over time, adds further complexity. Although research is emerging in these areas, a review of the literature reveals attempts to identify holding cost components are limited. Their quantification (in terms of relative weight or proportionate cost to a development project) is even less apparent; in fact, the computation and methodology behind the calculation of holding costs varies widely and in some instances completely ignored. In addition, it may be demonstrated that ambiguities exists in terms of the inclusion of various elements of holding costs and assessment of their relative contribution. Yet their impact on housing affordability is widely acknowledged to be profound, with their quantification potentially maximising the opportunities for delivering affordable housing. This paper seeks to build on earlier investigations into those elements related to holding costs, providing theoretical modelling of the size of their impact - specifically on the end user. At this point the research is reliant upon quantitative data sets, however additional qualitative analysis (not included here) will be relevant to account for certain variations between expectations and actual outcomes achieved by developers. Although this research stops short of cross-referencing with a regional or international comparison study, an improved understanding of the relationship between holding costs, regulatory charges, and housing affordability results.
Resumo:
Mindful of time line and budget limitations this document, as requested by BBC, acts as an inspirational scope, identifying more ‘live’ opportunities than possible within the current budget. The document's secondary purpose is to identify through consultation, concept development of ideas and budgetary costs associated, a number of projects within this document that can be successfully achieved within the current circumstance. A limited, but successful outcome in this initial phase will help to ensure the continuing invested support of stake-holders, not only in Burnett Lane but in relation to the creative scope of other laneways as identified in the BCC laneway document.
Resumo:
Zero energy buildings (ZEB) and zero energy homes (ZEH) are a current hot topic globally for policy makers (what are the benefits and costs), designers (how do we design them), the construction industry (can we build them), marketing (will consumers buy them) and researchers (do they work and what are the implications). This paper presents initial findings from actual measured data from a 9 star (as built), off-ground detached family home constructed in south-east Queensland in 2008. The integrated systems approach to the design of the house is analysed in each of its three main goals: maximising the thermal performance of the building envelope, minimising energy demand whilst maintaining energy service levels, and implementing a multi-pronged low carbon approach to energy supply. The performance outcomes of each of these stages are evaluated against definitions of Net Zero Carbon / Net Zero Emissions (Site and Source) and Net Zero Energy (onsite generation v primary energy imports). The paper will conclude with a summary of the multiple benefits of combining very high efficiency building envelopes with diverse energy management strategies: a robustness, resilience, affordability and autonomy not generally seen in housing.
Resumo:
Life Cycle Cost Analysis provides a form of synopsis of the initial and consequential costs of building related decisions. These cost figures may be implemented to justify higher investments, for example, in the quality or flexibility of building solutions through a long term cost reduction. The emerging discipline of asset mnagement is a promising approach to this problem, because it can do things that techniques such as balanced scorecards and total quantity cannot. Decisions must be made about operating and maintaining infrastructure assets. An injudicious sensitivity of life cycle costing is that the longer something lasts, the less it costs over time. A life cycle cost analysis will be used as an economic evaluation tool and collaborate with various numbers of analyses. LCCA quantifies incurring costs commonly overlooked (by property and asset managers and designs) as replacement and maintenance costs. The purpose of this research is to examine the Life Cycle Cost Analysis on building floor materials. By implementing the life cycle cost analysis, the true cost of each material will be computed projecting 60 years as the building service life and 5.4% as the inflation rate percentage to classify and appreciate the different among the materials. The analysis results showed the high impact in selecting the floor materials according to the potential of service life cycle cost next.