880 resultados para End of degree project
Resumo:
The objective of the thesis is to structure and model the factors that contribute to and can be used in evaluating project success. The purpose of this thesis is to enhance the understanding of three research topics. The goal setting process, success evaluation and decision-making process are studied in the context of a project, business unitand its business environment. To achieve the objective three research questionsare posed. These are 1) how to set measurable project goals, 2) how to evaluateproject success and 3) how to affect project success with managerial decisions.The main theoretical contribution comes from deriving a synthesis of these research topics which have mostly been discussed apart from each other in prior research. The research strategy of the study has features from at least the constructive, nomothetical, and decision-oriented research approaches. This strategy guides the theoretical and empirical part of the study. Relevant concepts and a framework are composed on the basis of the prior research contributions within the problem area. A literature review is used to derive constructs of factors withinthe framework. They are related to project goal setting, success evaluation, and decision making. On the basis of this, the case study method is applied to complement the framework. The empirical data includes one product development program, three construction projects, as well as one organization development, hardware/software, and marketing project in their contexts. In two of the case studiesthe analytic hierarchy process is used to formulate a hierarchical model that returns a numerical evaluation of the degree of project success. It has its origin in the solution idea which in turn has its foundation in the notion of projectsuccess. The achieved results are condensed in the form of a process model thatintegrates project goal setting, success evaluation and decision making. The process of project goal setting is analysed as a part of an open system that includes a project, the business unit and its competitive environment. Four main constructs of factors are suggested. First, the project characteristics and requirements are clarified. The second and the third construct comprise the components of client/market segment attractiveness and sources of competitive advantage. Together they determine the competitive position of a business unit. Fourth, the relevant goals and the situation of a business unit are clarified to stress their contribution to the project goals. Empirical evidence is gained on the exploitation of increased knowledge and on the reaction to changes in the business environment during a project to ensure project success. The relevance of a successful project to a company or a business unit tends to increase the higher the reference level of project goals is set. However, normal performance or sometimes performance below this normal level is intentionally accepted. Success measures make project success quantifiable. There are result-oriented, process-oriented and resource-oriented success measures. The study also links result measurements to enablers that portray the key processes. The success measures can be classified into success domains determining the areas on which success is assessed. Empiricalevidence is gained on six success domains: strategy, project implementation, product, stakeholder relationships, learning situation and company functions. However, some project goals, like safety, can be assessed using success measures that belong to two success domains. For example a safety index is used for assessing occupational safety during a project, which is related to project implementation. Product safety requirements, in turn, are connected to the product characteristics and thus to the product-related success domain. Strategic success measures can be used to weave the project phases together. Empirical evidence on their static nature is gained. In order-oriented projects the project phases are oftencontractually divided into different suppliers or contractors. A project from the supplier's perspective can represent only a part of the ¿whole project¿ viewed from the client's perspective. Therefore static success measures are mostly used within the contractually agreed project scope and duration. Proof is also acquired on the dynamic use of operational success measures. They help to focus on the key issues during each project phase. Furthermore, it is shown that the original success domains and success measures, their weights and target values can change dynamically. New success measures can replace the old ones to correspond better with the emphasis of the particular project phase. This adjustment concentrates on the key decision milestones. As a conclusion, the study suggests a combination of static and dynamic success measures. Their linkage to an incentive system can make the project management proactive, enable fast feedback and enhancethe motivation of the personnel. It is argued that the sequence of effective decisions is closely linked to the dynamic control of project success. According to the used definition, effective decisions aim at adequate decision quality and decision implementation. The findings support that project managers construct and use a chain of key decision milestones to evaluate and affect success during aproject. These milestones can be seen as a part of the business processes. Different managers prioritise the key decision milestones to a varying degree. Divergent managerial perspectives, power, responsibilities and involvement during a project offer some explanation for this. Finally, the study introduces the use ofHard Gate and Soft Gate decision milestones. The managers may use the former milestones to provide decision support on result measurements and ad hoc critical conditions. In the latter milestones they may make intermediate success evaluation also on the basis of other types of success measures, like process and resource measures.
Resumo:
Patients with cleft palate are prone to velopharyngeal insufficiency. In minor cases or when hypernasal speech does not resolve after velopharyngoplasty, an augmentation pharyngoplasty with autologous fat can be proposed. The aim of the present study is to evaluate the short-term (within 2 months) and long-term efficiency (during the 24 months following the procedure) of our procedure in the setting of velopharyngeal insufficiency related to a cleft palate. Twenty-two patients with cleft palate related velopharyngeal insufficiency were included in this retrospective study. All patients were operated following the same technique, in the same institution. The pre- and postoperative evaluations included a nasometry, a subjective evaluation using the Borel-Maisonny score, and a nasofibroscopy to assess the degree of velopharyngeal closure. Scores of Borel-Maisonny and nasometry were compared before, shortly after the procedure (within 2 months) and long term after the procedure (within 24 months). Forty-one procedures in 22 patients with a cleft palate performed in our institution between October 2004 and January 2012 were included in the study. Nine patients had a previous velopharyngoplasty with persistent rhinolalia despite intensive speech therapy. In 14 patients the procedure was repeated because of recurrent hypernasal speech after the first injection. The average number of procedures per patient was 1.8. Postoperative nasometry and Borel-Maisonny scores were statistically significantly improved and remained stable until the end of the follow-up (median 42 months postoperative) in most patients. Complications were rare and minor. Autologous fat injection is a simple procedure for treatment of minor velopharyngeal insufficiencies in patients with cleft palate, with good long-term results and few complications.
Resumo:
Työn pääasiallisena tavoitteena on selvittää ydinosaamista, jota tarvitaan kansainvälisen metsäteollisuusyrityksen loppukäyttäjävetoisessa liiketoiminnassa. Lisäksi tavoitteena on laatia kompetenssimalli, jota voidaan käyttää mm. rekrytoinnissa, koulutuksen ja työnkierron suunnittelussa. Tarkoituksena on tarkastella sekä tällä hetkellä että tulevaisuudessa tarvittavia ydinosaamisia. Työ keskittyy myyntihenkilöiden kompetenssien kuvaamiseen. Kirjallisuuden ja asiantuntijoiden haastattelujen avulla on selvitetty. kompetensseihin liittyviä asioita ja käsitteitä, kuten organisaation oppiminen, innovaatiot sekä asiakaslähtöisyys. Tämän jälkeen on kartoitettu case-yrityksen kartonkiyksikön myyntihenkilökunnan kompetensseja. Kompetenssikartoitus on tehty teemahaastattelujen avulla sekä lisäksi on käytetty työn aikana laadittua kompetenssimatriisia. Saatuja tuloksia on verrattu yhden asiakkaan näkemyksiin. Tulosten mukaan kolme tärkeintä tämän hetken kompetenssia ovat: holistinen näkemys asioista, suhteiden rakentaminen ja kielitaito. Tulevaisuuden tärkeimpiä kompetensseja puolestaan ovat: asiakaslähtöisyys, sähköinen kaupankäynti ja suhteiden rakentaminen. Lopuksi on käsitelty yleisiä metsäteollisuuden tulevaisuuden haasteita sekä annettu joitain kehitysideoita kompetenssien kehittämistä varten.
Resumo:
This article explains the social transformation process initiated at the end of the 1970s within the neighborhood of La Verneda-Sant Martı´ in Barcelona. This process started with the foundation of an adult education center that was organized as a Learning Community (the first one in the world). From the beginning, it was administered for and by the community. It became a space of debate where the demands and dreams of the neighbors converged about transforming their neighborhood along with the recommendations of the international scientific community. Twenty years later, the dreams came true: There have been substantial improvements throughout the urban space, infrastructures, housing, urban thoroughfares, and public highways. The INCLUD-ED European project, using the communicative methodology of research, has thoroughly studied the transformation carried out in the La Verneda-Sant Martı´ Adult School and its neighborhood. INCLUD-ED has identified successful practices within diverse social areas that are transferable to other contexts and contribute to overcoming inequalities and improving the most underprivileged neighborhoods.
Resumo:
[spa] Nuestro objetivo consiste en fomentar, entre alumnos internos del Departamento de Fisiología, el autoaprendizaje, el trabajo autónomo y en equipo, espíritu crítico y habilidad para buscar y analizar información. A la vez se pretende iniciar a estos alumnos en los sistemas de transferencia de resultados de la investigación básica a la investigación aplicada. Para ello a los alumnos se les proporciona materiales que contienen información sobre las materias objeto de aprendizaje y enlaces a diferentes sitios webs de interés relacionados con el tema. En ellos se promueve la exposición de trabajos y la participación en jornadas especializadas. El uso de estos materiales bajo supervisión del profesorado, ha permitido la mejora del conocimiento en Fisiología y la creación de equipos especializados en diferentes aspectos de la Fisiología. Además, la transferencia de información entre alumnos, ha propiciado que puedan adquirir una visión clara y amplia sobre qué es un trabajo de investigación básica o un trabajo de investigación aplicada, así como la importancia del trabajo en equipo, lo que ha posibilitado que pudieran diseñar pequeños experimentos y estudiar su aplicabilidad. Al final del periodo de formación, los alumnos demostraron haber adquirido las competencias genéricas CG1, CG3, CG5, CG6, CG11, CG13 y CG15 incluidas en la ficha Verifica para el Grado en Farmacia, así como las competencias específicas para el módulo 5 (Medicina y Farmacología) CEM5.8, CEM5.9 y CEM5.11, concluyendo así que la aplicación de métodos de enseñanza basados en el autoaprendizaje (bajo supervisión de equipos docentes) constituye una excelente herramienta para la promoción de la adquisición de competencias generales y específicas en el Grado en Farmacia.
Resumo:
Psychological Assessment is a core subject of Psychology studies, and of the university degree Human development, at the University of Girona and according to the University regulations, had 12 credits. Until the 2005-06 academic years, the student work conducted outside the classroom consisted of undertaking a psychological assessment that was written and handed in at the end of the course. From this the student obtained a qualification and a review if they applied for it In accordance with the European Credits for Higher Education, this subject was reduced to 9 credits, which is the equivalent of a total of 255 hours of in-class work and outside the classroom. In the 2006-07 academic year we created a guide to manage the student’s experiences outside the classroom, with the objective of encouraging the application of problem solving/critical thinking (Bloom, 1975), in line with the recommendations of the Catalonia Agency for University System Quality (2005). The guide includes: learning objectives, evaluation criterions, a description of activities, work week timetable for the whole course, programmed tutorials to review all steps of the psychological assessment process, and the use of a web-based virtual forum for the transfer of knowledge, analysis and constructive critiques of the assessment done by themselves and their colleagues
Resumo:
Un dels organismes model més utilitzats en experimentació genètica és la Drosophila melanogaster ja que la facilitat de manipulació genètica i la seva simplicitat permeten estudiar processos biològics amb múltiples aplicabilitats en diferents àmbits d’estudi com el desenvolupament embrionari i la morfogènesis. La morfogènesi es un dels esdeveniments més importants durant el desenvolupament embrionari que permet la formació dels diferent teixits i òrgans, i que depèn de l'expressió genètica i de l'activació i coordinació de diferents vies de senyalització. Entendre com es coordinen aquest processos es fonamental per conèixer com es forma un òrgan. Així, l’objectiu principal d’aquest Treball de Final de Grau és identificar nous gens implicats en la formació del sistema traqueal (el nostre òrgan model) mitjançant un mini-‐cribratge funcional de gens que s’expressen en la tràquea, a més de generar eines per a l'estudi de la via de senyalització FGF/Bnl durant la remodelació del sistema traqueal mitjançant la tècnica de knock in. Per a dur-‐ho a terme, amb el suport de la base de dades de Gens i Genomes de Drosophila melanogaster (mod-‐ENCODE Tissue Expression Data) s’han seleccionat gens candidats expressats a la tràquea en estat larvari. Un cop identificats, s'ha estudiat la seva possible funció en el desenvolupament de les tràquees mitjançant el seu silenciament amb el sistema UAS-‐Gal4. Així hem vist que Vein (CG10491), CG17098, No Ocelli (CG4491) i Peptidasa (CG4017) presenten diversos fenotips que afecten la formació dels traqueoblasts. També hem vist que Vein, lligand de la via EGF és necessari per a la proliferació i supervivència de les cèl·∙lules traqueals del sac aeri. Finalment s’ha iniciat la generació d'un knock in en el gen branchless (bnl). Per aquest motiu s'han amplificat les regions 5’ i 3’ de l’exó 2 del gen Bnl i s'ha iniciat la seva clonació dirigida al vector de destí pTV-‐Cherry. Aquesta tècnica generarà eines que permetran entendre la funció del gen bnl durant la remodelació del sistema traqueal.
Resumo:
The objective of this study was to find out how project success can be measured in a case where the output of a project is an intangible information product, what kind of framework can be used to evaluate the project success, and how the project assessment can be done in practice. As a case example, the success of a business blueprint project was assessed from the product point of view. A framework for assessing business blueprint project success was made based on a literature review. Furthermore, separate frameworks for measuring information product quality and project costs were developed. The theory of business blueprinting was discovered not to be firmly institutionalized and it is briefly covered in the thesis. The possible net benefits from the strategic business process harmonization were noted to be much more significant than the costs of the business blueprint project. The project was seen as a sufficient success from the viewpoint of the created output.
Resumo:
Available empirical evidence regarding the degree of symmetry between European economies in the context of Monetary Unification is not conclusive. This paper offers new empirical evidence concerning this issue related to the manufacturing sector. Instead of using a static approach as most empirical studies do, we analyse the dynamic evolution of shock symmetry using a state-space model. The results show a clear reduction of asymmetries in terms of demand shocks between 1975 and 1996, with an increase in terms of supply shocks at the end of the period.
Resumo:
The front end of innovation is regarded as one of the most important steps in building new software products or services, and the most significant benefits in software development can be achieved through improvements in the front end activities. Problems in the front end phase have an impact on customer dissatisfaction with delivered software, and on the effectiveness of the entire software development process. When these processes are improved, the likelihood of delivering high quality software and business success increases. This thesis highlights the challenges and problems related to the early phases of software development, and provides new methods and tools for improving performance in the front end activities of software development. The theoretical framework of this study comprises two fields of research. The first section belongs to the field of innovation management, and especially to the management of the early phases of the innovation process, i.e. the front end of innovation. The second section of the framework is closely linked to the processes of software engineering, especially to the early phases of the software development process, i.e. the practice of requirements engineering. Thus, this study extends the theoretical knowledge and discloses the differences and similarities in these two fields of research. In addition, this study opens up a new strand for academic discussion by connecting these research directions. Several qualitative business research methodologies have been utilized in the individual publications to solve the research questions. The theoretical and managerial contribution of the study can be divided into three areas: 1) processes and concepts, 2) challenges and development needs, and 3) means and methods for the front end activities of software development. First, the study discloses the difference and similarities between the concepts of the front end of innovation and requirements engineering, and proposes a new framework for managing the front end of the software innovation process, bringing business and innovation perspectives into software development. Furthermore, the study discloses managerial perceptions of the similarities and differences in the concept of the front end of innovation between the software industry and the traditional industrial sector. Second, the study highlights the challenges and development needs in the front end phase of software development, especially challenges in communication, such as linguistic problems, ineffective communication channels, a communication gap between users/customers and software developers, and participation of multiple persons in software development. Third, the study proposes new group methods for improving the front end activities of software development, especially customer need assessment, and the elicitation of software requirements.
Resumo:
Today’s business world demands more and more internal and external integration and transparency among companies at all fields. Integrated ERP (enterprise resource planning) systems offer a possibility to improve business practices and procedures by providing a unified view on the business including all functions and departments. Due to the obvious benefits, the popularity of integrated ERP systems keeps growing. The implementation of ERP systems has however proven risky. The implementation projects tend to be long, extensive, and costly – and often they end up in a failure. Due to the significant task and role changes ERP implementation brings to almost everybody in the company, training has been identified as one of the most critical success factors of an ERP implementation. To ensure that the training is conducted in the most effective and successful manner, the training outcomes should be evaluated. So far, training evaluation has however gained only limited attention at most companies investing in different training programs. Uponor corporation has initiated a large ERP implementation and process harmonization program in 2004. Thousands of end-users have been trained during this project so far, and the work still continues until the project is completed in 2010. In this thesis, the evaluation of end-user training in Uponor’s ERP program is brought further from the current state of performing the basic participant satisfaction survey in the end of each class. The results show that in order to reach reliable training effectiveness evaluation results, not only the reaction towards training but also transfer of skills and attitudes and the final results of the training program should be evaluated.
Resumo:
Background: Celiac disease is a lifelong, gluten-sensitive, autoimmune-mediated chronic enteropathy, tightly associated with risk alleles at the HLA class II genes. Aims: This study was carried out as a part of the population-based Type 1 Diabetes Prediction and Prevention (DIPP) Project. The first aim was to study the natural history of celiac disease-associated antibodies before the diagnosis of celiac disease was made. The second aim was to describe when and in which order celiac disease-associated and type 1 diabetes-associated antibodies appeared in children with genetic risk for both diseases. Subjects and Methods: Antibodies against tissue transglutaminase (TGA) and other celiac disease-associated antibodies were measured in serum samples collected at 3- to 12-month intervals of children at genetic risk for celiac disease who participated in the DIPP project. Celiac disease was confirmed by duodenal biopsy. Type 1 diabetes-associated antibodies were measured in all samples that had been collected. Overt disease was diagnosed according to World Health Organization criteria. Follow-up continued until a diagnosis of type 1 diabetes or until the end of a defined follow-up period. Results: TGA appeared in children at genetic risk for celiac disease only after the first year of life, but anti-gliadin antibodies often emerged significantly earlier, at age 6 months. The data show that spontaneous disappearance of celiac disease-associated antibodies, transient or persisting, is a common phenomenon, at least in prepubertal children. In children with genetic susceptibility to type 1 diabetes and celiac disease, celiac disease-associated antibodies usually develop earlier than the type 1 diabetes-associated antibodies. Conclusions: The transient nature of celiac disease-associated antibodies emphasizes the significance of establishing seropositivity repeatedly in screening detected celiac disease before gastroscopy and duodenal biopsy are considered and emphasized the importance of duodenal biopsy for diagnosing celiac disease.
Resumo:
Project management has evolved in recent decades. Project portfolio management, together with multi project management, is an emerging area in the project management field in practice, and correspondingly in academic research and forums. In multi project management, projects cannot be handled isolated from each other, as they often have interdependencies that have to be taken into account. If the interdependencies between projects are evaluated during the selection process, the success rate of the project portfolio is increased. Interdependencies can be human resources, technological, and/or market based. Despite of the fact that interdependency as a phenomenon has roots in the 1960s and is related to famous management theories, it has not been much studied, although in practice most companies use it to great extent. There exists some research on interdependency, but prior publications have not emphasized the phenomenon per se, because a practical orientation practitioner techniques prevails in the literature. This research applies the method triangulation, electronic surveys and multiple case study. The research concentrates on small to large companies in Estonia and Finland, mainly in construction, engineering, ICT, and machinery industries. The literature review reveals that interdependencies are deeply involved in R&D and innovation. Survey analysis shows that companies are aware of interdependency issues in general, but they i have lack of detailed knowledge to use it thoroughly. Empirical evidence also indicates that interdependency techniques influence the success rate and other efficiency aspects to different extents. There are a lot of similarities in interdependency related managerial issues in companies of varying sizes and countries in Northern Europe. Differences found in the study are for instance the fact that smaller companies face more difficulties in implementing and evaluating interdependency procedures. Country differences between Estonia and Finland stem from working solutions to manage interdependencies on a daily basis.historical and cultural reasons, such as the special features of a transition country compared to a mature country. An overview of the dominant problems, best practices, and commonly used techniques associated with interdependency is provided in the study. Empirical findings show that many interdependency techniques are not used in practice. A multiple case study was performed in the study to find out how interdependencies are managed in real life on a daily basis. The results show that interdependencies are mostly managed in an informal manner. A description of managing the interdependencies and implementation procedures is given. Interdependency procedures are hard to implement, especially in smaller companies. Companies have difficulties in implementing interdependency procedures and evaluating them. The study contains detailed results on how companies have implemented working solutions to manage interdependencies on a daily basis
Resumo:
Organising the PT- programme for full-time working adult students is a challenging task as it is an international programme with both domestic and foreign students with different educational background. The purpose of this project work is to provide both student and lecturer feedback for improving Master Of Science Degree Programme in Packaging Technology to meet better the requirements of part-time studying. The objective of this work is in accordance with the Lappeenranta University of Technology’s strategy to improve continuously degree programmes and courses and to use student feedback in this development work of education. Matters, such as lecture schemes, distance material distribution, distance assignment handling, course assessments, and guidance of thesis work will be under scrutiny.
Resumo:
The objective of the pilotage effectiveness study was to come up with a process descrip-tion of the pilotage procedure, to design performance indicators based on this process description, to be used by Finnpilot, and to work out a preliminary plan for the imple-mentation of the indicators within the Finnpilot organisation. The theoretical aspects of pilotage as well as the guidelines and standards used were determined through a literature review. Based on the literature review, a process flow model with the following phases was created: the planning of pilotage, the start of pilo-tage, the act of pilotage, the end of pilotage and the closing of pilotage. The model based on the literature review was tested through interviews and observation of pilotage. At the same time an e-mail survey directed at foreign pilotage organisations, which included a questionnaire concerning their standards and management systems, operations procedures, measurement tools and their attitude to the passage planning, was conducted. The main issues in the observations and interviews were the passage plan and the bridge team co-operation. The phases of the pilotage process model emerged in both the pilotage activities and the interviews whereas bridge team co-operation was relatively marginal. Most of the pilotage organisations, who responded to the query, also use some standard-based management system. All organisations who answered the survey use some sort of a pilotage process model. According to the query, the main measuring tools for pilotage are statistical information concerning pilotage and the organisations, the customer feedback surveys, and financial results. Attitudes to-wards passage planning were mostly positive among the organisations. A workshop with pilotage experts was arranged where the process model constructed on the basis of the literature review was tuned to match practical pilotage. In the workshop it was determined that certain phases and the corresponding tasks, through which pilo-tage can be described as a process, were identifiable in all pilotage. The result of the workshop was a complemented process model, which separates incoming and outgoing traffic, as well as the fairway pilotage and harbour pilotage from each other. Addition-ally indicators divided according to the data gathering method were defined. Data con-cerning safety and traffic flow is gathered in the form of customer feedback. The pilot's own perceptions of the pilotage process are gathered through self-assessment. The measurement data which is connected to the phases of the pilotage process is generated e.g. by gathering statistics of the success of the pilot dispatches, the accuracy of the pi-lotage and the incidents that occurred during the pilotage, near misses, deviations and accidents. The measurement data is collected via the PilotWeb at the closing of the pilo-tage. A separate project and a project group with pilots also participating will be established for the deployment of the performance indicators. The phases of the project are: the definition phase, the implementation phase and the deployment phase. The purpose of the definition phase is to prepare questions for ship commanders concerning the cus-tomer feedback questionnaire and also to work out the self-assessment queries and the queries concerning the process indicators.