949 resultados para software project


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes an analysis of construction project bids to determine (a) the global distribution and (b) factors influencing the distribution of bids. The global distribution of bids was found, by using a battery of ll test statistics, to be approximated by a three-parameter log normal distribution. No global spread parameter was found. A multivariate analysis revealed the year of tender to be the major influencing factor. Consideration of the construction order, tender price and output indices lead to the conclusion that distributional spread reflected the degree of difference in pricing policies between bidders and the skewness of the distributions reflected the degree of competition. The paper concludes with a tentative model of the causal relationships between the factors and distributional characteristics involved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

QUT Linking Karumba Project This exhibition showcases the work of 3rd -4th year undergraduate landscape architecture, architecture, Industrial Design, Environmental Engineering, Civil Engineering students in response to issues of sustainability in the Gulf of Carpentaria town of Karumba. It presented the final, polished set of work to the Karumba and Carpentaria Shire community, following revisions in line with feedback from the 2008 exhibition. 16 students and four staff set off on a 2488km journey to undertake the first half of the Carpentaria Project: a fortnight-long strategic planning project entitled Linking Karumba to encourage social, economic, environmental and cultural linkages across the town. Karumba, along with the nearby town of Normanton, is one of Queensland’s most remote settlements. Its economy is based on fishing, tourism, and mining. It has two centres, 2.5km apart by river, or 9km by road. This physical disconnect was identified by Carpentaria Shire Council (CSC) and the Karumba Progress Association (KPA) as a source of socio-cultural disconnection, which formed the basis of our project brief. Student designs were highly responsive to the character of Karumba’s culture and environment, indicating remarkable levels of immersion, and attracting $830 000 in Qld. state government funding for implementation. The Exhibition Four groups of four students produced four strategic planning and design options toward this future: Make the Switch: Alice Anonuevo, Michael Marriott, Carla Priestley & Grant Harvey Realigning the Systems: Claudia Bergs, Rebecca Stephens, Anna Coulson & Lois Kerrigan Diversification of Experience: Rebecca North, Kyle Bush, Debra Sullivan & Jenna Green The River is the Main Street: Ashley Nicholson, Monica Kuiken, Dean Bowen & Bill Schild

Relevância:

20.00% 20.00%

Publicador:

Resumo:

QUT Learning and Teaching Unit QUT Grants Workshops 2. Undertaking a Successful Project The purpose of this workshop was to assist QUT grant recipients to make connections, identify synergies and build a sense of scholarly community with each other; leverage grants outwards and possibly upwards; share factors that should be considered to undertake a successful project. Presenter: Shannon Satherley. "Initial Planning = Flexibility, Sanity & Success (or at least honourable failure) 1. Top & Tail 2. Divide and Delineate 3. Communicate Clearly & Consistently"

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Morris' (1986) analysis of the factors affecting project success and failure is considered in relation to the psychology of judgement under uncertainty. A model is proposed whereby project managers may identify the specific circumstances in which human decision-making is prone to systematic error, and hence may apply a number of de-biasing techniques.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Australian Government and most Australian road authorities have set ambitious greenhouse gas emission (GHGe) reduction targets for the near future, many of which have translated into action plans. However, previous research has shown that the various Australian state road authorities are at different stages of implementing ‘green’ initiatives in construction planning and development, with considerable gaps in their monitoring, tendering, and contracting. This study illustrates the differences between procurement standards and project specific practices that aim to reduce GHGe from road construction projects in three of the largest Australian road construction clients, with a focus on the tools used, contract type and incentives for better performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Growing community concerns about the ecological, social, cultural and economic impact of housing and urban projects poses new challenges for those who have to deliver them. It is important that these concerns are addressed as part of the community engagement processes on projects. Community engagement is traditionally perceived as the purview of planners and disconnected from the building construction process. This is despite most project approval processes mandating on-going community engagement over the project’s entire lifetime. There is evidence that point to a culture of ambiguity and ambivalence among building professionals about their roles, responsibilities and expectations of community engagement during the construction phase of projects. This has contributed to a culture of distrust between communities and the construction industry. There is a clear need to build capacity among building professionals to empower them as active participants in community engagement processes which can promote better project outcomes and minimise delays and conflicts. This paper describes a process that utilises the Theory of Planned Behaviour as a framework to equip building professionals with the skills they need to engage effectively with local communities during the construction phase of projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The concept of market-driven rather than product-driven quality management has been given prominence through the report of a recent inquiry into the performance of the Hong Kong construction industry. The report submitted to the Government of Hong Kong in 2001 establishes a new vision of ‘an integrated industry that is capable of continuous improvement towards excellence in the market-driven environment’. Given the current economic downturn, major contractors are facing many challenges to realize this new quality oriented vision. This paper addresses the critical and timely issue of applying quality management to the project delivery process in Hong Kong. The paper attempts to capture and critically examine management perceptions of quality management aspects as applied to a local large-scale road construction project. Based on the analysis of questionnaire feedback and face-to-face interviews, the paper reveals key attributes of a successful application of quality management approaches, and identifies a mechanism for facilitating such implementation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The aim of this work is to develop software that is capable of back projecting primary fluence images obtained from EPID measurements through phantom and patient geometries in order to calculate 3D dose distributions. In the first instance, we aim to develop a tool for pretreatment verification in IMRT. In our approach, a Geant4 application is used to back project primary fluence values from each EPID pixel towards the source. Each beam is considered to be polyenergetic, with a spectrum obtained from Monte Carlo calculations for the LINAC in question. At each step of the ray tracing process, the energy differential fluence is corrected for attenuation and beam divergence. Subsequently, the TERMA is calculated and accumulated to an energy differential 3D TERMA distribution. This distribution is then convolved with monoenergetic point spread kernels, thus generating energy differential 3D dose distributions. The resulting dose distributions are accumulated to yield the total dose distribution, which can then be used for pre-treatment verification of IMRT plans. Preliminary results were obtained for a test EPID image comprised of 100 9 100 pixels of unity fluence. Back projection of this field into a 30 cm9 30 cm 9 30 cm water phantom was performed, with TERMA distributions obtained in approximately 10 min (running on a single core of a 3 GHz processor). Point spread kernels for monoenergetic photons in water were calculated using a separate Geant4 application. Following convolution and summation, the resulting 3D dose distribution produced familiar build-up and penumbral features. In order to validate the dose model we will use EPID images recorded without any attenuating material in the beam for a number of MLC defined square fields. The dose distributions in water will be calculated and compared to TPS predictions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The capacity of educators to work in partnership with families is considered to be a hallmark of quality practice in education and care. The rationale is that ‘children thrive when families and educators work together in partnership to support young children’s learning’ (DEEWR 2009, p. 9).To support genuine partnerships, the Brisbane South Professional Support Network (PSN) is leading a collaborative project, with the Health and Community Services Workforce Council and Queensland University of Technology (QUT), known as the ‘Family Participation in ECEC project’. The overarching aim of the project is to investigate different perspectives of family partnership in ECEC, with a focus on information sharing, information seeking and family participation,to build educator capacity to establish and maintain genuine partnerships with families. Maintaining a practical focus, and linking to the National Quality Framework for Early Childhood Education and Care (Quality Area 6), the study findings offer insight into the different ways that diverse families and educators may view and experience partnership, and as such provide a sound basis for critical reflection, professional learning and improved practice.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Video presented as part of Smart Services CRC Participants conferences. This video shows an example of the latest version of our middleware linking the YAWL workflow engine to Open Simulator. We have created a simple example of an accident victim being brought into a Hospital to be processed. The preliminary interface to the YAWL accident treatment workflow is shown as a worklist on the left of the image. The tasks are presented to the avatar via this interface, in a similar manner as done in web based workflow systems. Objects in the simulator are instrumented with a knowledge base, that enables the validation of actions within the world, to make sure that tasks are carried out correctly.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report describes the available functionality and use of the ClusterEval evaluation software. It implements novel and standard measures for the evaluation of cluster quality. This software has been used at the INEX XML Mining track and in the MediaEval Social Event Detection task.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Over a seven-year period, Mark Radvan directed a suite of children’s theatre productions adapted from the original Tashi stories by Australian writers Anna and Barbara Fienberg. The Tashi Project’s repertoire of plays performed to over 40,000 children aged between 3 and 10 years old, and their carers, in seasons at the Out of the Box Festival, at Brisbane Powerhouse and in venues across Australia in two interstate tours in 2009 and 2010. The project investigated how best to combine an exploration of theatrical forms and conventions, with a performance style evolved in a specially developed training program and a deliberate positioning of young children as audiences capable of sophisticated readings of action, symbol, theme and character. The results of this project show that when brought into appropriate relationship with the theatre artists, young children aged 3-5 can engage with sophisticated narrative forms, and with the right contextual framing they enjoy heightened dramatic and emotional tension, bringing to the event sustained and highly engaged concentration. Older children aged 6-10 also bring sustained and heightened engagement to the same stories, providing that other more sophisticated dramatic elements are woven into the construction of the performances, such as character, theme and style.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper examines the role of actors in a participatory project, a case study of the glass-bead traditional craft industry in rural Indonesia. The project aimed to unite and empower rural craftspeople with regard to their unique potential. The problems of empowering rural craftspeople were complicated, due to the interrelated aspect of rural community life, cultural and educational backgrounds, as well as the local political situation. However, through a comprehensive understanding of the community prior to the project and by maintaining the communication, craftspeople were engaged actively in the project by promoting the craft industry to local buyers. The researcher, other facilitators and the community leader gave supportive roles at the middle and the end stage of the project.